ML17348A314

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-250/90-17 & 50-251/90-17 on 900529-0601.No Violations or Deviations Noted
ML17348A314
Person / Time
Site: Turkey Point  
Issue date: 06/12/1990
From: Cline W
NRC Office of Inspection & Enforcement (IE Region II)
To: Goldberg J
Florida Power & Light Co
Shared Package
ML17348A315 List:
References
NUDOCS 9006250029
Download: ML17348A314 (6)


See also: IR 05000250/1990017

Text

Docket Nos.

50-250,

50-251

License

Nos.

DPR-31,

DPR-41

Florida

Power

and Light Company

ATTN:

Mr; J.

H. Goldberg

President - Nuclear Division

P.

O.

Box 14000

Juno

Beach,

FL

33408-0420

Gentlemen:

SUBJECT:

NRC INSPECTION

REPORT

NOS. 50-250/90-17

AND 50-251/90-17

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

A. Tillman

on

May 29

June

1,

1990.

The

inspection

included

a

review of

activities authorized

for your Turkey Point Nuclear Plant.

At the conclusion

~

of the inspection,

the findings were discussed

with those

members of your staff

identified in the enclosed

Inspection

Report.

Areas

examined

during

the

inspection

are

identified in the report.

Within

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and

observation

of

activities in progress.

Within the

scope

of

the

inspection,

violations

- or deviations

were

not

'identified.

In accordance

with 10 CFR 2.790(d)

and

10 CFR 73.21,

safeguards

activities

and

security measures

are

exempt from public disclosure.

Therefore,

the enclosure

to this letter with the exception

of the report cover page,

which presents

a

nonexempt

summary, will not be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

ORlGtleL SlGNED BY

DAVfO F,'. tgc{-,<<oc

William E. Cline, Chief

Nuclear Materials Safety

and

Safeguards

Branch

Division of Radiation Safety

and Safeguards

Enclosure:

(See

page

2)

,0

F'lorida Power and Light Company

Enclosure:

NRC Inspection

Report

(Safeguards

Information)

cc w/encl:

K.

N. Harris, Sr.

Vice President

Turkey Point Nuclear Plant

P. 0.

Box 029100

Miami,

FL

33102

L.

W. Pearce,

Plant Manager

Turkey Point Nuclear Plant

P. 0.

Box 029100

Miami,

FL

33102

cc,w/Inspection

Summary:

L.

W. Bladow

guality Manager

Turkey. Point Nuclear Plant

P. 0.

Box 029100

'iami,

FL

33102

D.

Powel l, Superintendent-

Plant Licensing

Turkey Point Nuclear Plant

P. 0.

Box 029100

Miami, FL

33102

Harold

F. Reis,

Esq.

Newman

and Holtzinger,

P.C.

161S

L Street,

NW

Washington,

D.

C.

20036

John T. Butler,

Esq.

Steel,

Hector

and Davis

4000 Southeast

Financial

Center

Miami, FL

33131-2398

Attorney General

Department of Legal Affairs

The Capitol

Tallahassee,

FL

332304

Jacob

Daniel

Nash

Office of Radiation Control

Department of Health and

Rehabilitative Services

1317 Winewood Boulevard

Tallahssee,

FL

32399-0700

(cc w/Inspection

Summary cont'd - see

page

3)

JUN 12 1990

'e

Florida Power and Light Company

(cc w/Inspection

Summary cont'd)

Jack

Shreve

Office of the Public Counsel

Room 4, Holland Building

Tallahassee,

FL

32304

Administrator

Department of Environmental

Regulation

Power Plant Siting Section

State of Florida

Twin Towers

2600 Blair Stone

Road

Tallahassee,

FL

32301

Joaquin

Avino

County Manager of Metropolitan

Dade County

111

NW 1st Street,

29th Floor

Miami,

FL

33128

Intergovernmental

Coordination

and Review

Office of Planning

and Budget

Execut',ve Off'.ce of the Governor

The Capitol Building

Tallahassee,

FL

32301

State of Florida

bcc w/encl:

NRR/DRIS/SB

bcc w/Inspection

Summary:

G.

E. Edison,

NRR

Document Control

Desk (RIDS IE04),

016

NRC Resideht

Inspector

U

RII:DR S

ATs dolman

06/i)/90

RII

RSS

'M

uir

/

/90

R:D

P

R rlen jak

06/('+90

0'