Forwards Select Sys Assessment Progress Summary for Jan 1990.RHR Valve 887 Replacement Scheduled for Completion During Next Unit 4 Refueling Outage.Breaker List Scheduled to Be Completed by 910122
ML17347B595
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/13/1990
From: Harris K
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-90-49, NUDOCS 9003130007
Download: ML17347B595 (6)


Text

ACCELERATED DISTRIBUTION DEMONS'.TION SYSTEM

~ ~

j.

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9003130007 DOC.DATE: 90/02/13 NOTARIZED: NO ,DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTHOR AFFILIATION 05000251'UTH.

NAME HARRIS,K.N. Florida Power 6 Light Co.

RECIP.NAME'ECIPIENT AFFILIATION R Document Control Branch (Document Control Desk)

SUBJECT:

Forwards select sys assessment progress summary for Jan 1990.

DISTRIBUTION CODE: A001D TITLE: OR COPIES RECEIVED:LTR Submittal: General Distribution

( ENCL t'IZE:

NOTES: ~

/

ID RECIPIENT CODE/NAME COPIES LTTR ENCL 'D CODE/NAME, ~

COPIES LTTR ENCL A

51'ECIPIENT PD2-2 LA 1 1 -

PD2-2 PD 1 1 EDISON,G 5 INTERNAL: NRR/DET/ECMB 9H 1 1 NRR/DOEA/OTSB11 1 1' NRR/DST NRR/DST/SICB'7E 8E2 1, 1

1 NRR/DST/SELB 8D NRR/DST/SRXB 8E 1 1,

1 NUDOCS-ABSTRACT 1,. 1 OC 1 0 OGC/HDS2 1 0 EG FILE 01 .1 1 RES/DSIR/EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 A

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE t CONTACT THE.DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISIRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED)

TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 19

I P

ll '4 a aa 'k I

l P

P I I HI, ~ )J) e 4

)t J > '"' II I

1 4

II '$ ~

P l ':" i

a

~ ~

P.O. 6ox14000, Juno Beach, FL 33408-0420 FFB 1 3 )990 L-90-49 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Select S stem Assessment Pro ress Summar Pursuant to the Nuclear Regulatory Commission Order dated August 12, 1986, the attachment to this letter provides the January 1990 progress summary of the Select System Assessment.

Should there be any questions regarding this information, please contact us.

Very truly yours, K. Harris Vic President Tur ey Point Nuclear Plant KNH/TCG/gp Attachment cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 00 9003130007 900213 PDR R .- ..

ADOCK 05000250j an FPL Group company PDC

l j(

lt y

VL 1 V SELECT SYSTEM REVIEW JANUARY 1990 STATUS ORIGINAL 15 SYSTEMS WALKDOWN AS BUILT RECORDS Breaker List (IS Mod 1265) Scheduled to be completed January 22, 1991 MISCELLANEOUS ITEMS Unit 3 RHR 887 Valve replacement (IS Mod 519) Scheduled completion during February 1990 Unit 3 Refueling Outage Unit 4 Outage Related Modifications RHR 887 Valve Replacement (IS Mod 565) Scheduled completion during the next Unit 4 Refueling Outage EDG Redundant Set of Air Start Motors (IS Mod 576)

Scheduled completion to coincide with the Emergency Power System Upgrade Project Outage currently scheduled to begin in November 1990.

ADDITIONAL SYSTEMS ARMS PRMS NCC WALKDOWNS P 6 ID's (IS Mod 1042) Scheduled for completion during the February 1990 Unit 3 Refueling Outage P & ID Update Schedule to be determined following walkdowns