ML17347B549
| ML17347B549 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 01/19/1990 |
| From: | Peebles T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Goldberg J FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17347B550 | List: |
| References | |
| NUDOCS 9002090084 | |
| Download: ML17347B549 (5) | |
Text
'CCELERATED DISTRIBUTION DEMONSTPMTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
SSION NBR:9002090084 DOC.DATE: 90/01/19 NOTARIZED:
NO DOCKET ACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 AUTH.NAME AUTHOR AFFILIATION PEEBLES,T.A.
Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION GOLDBERGgJ ~ HE Florida Power
& Light Co ~
SUBJECT:
Forwards Exam Rept 50-250/OL-89-03 administered on 891106-09.
r QJ DISTRIBUTION CODE:
IE42D COPIES RECEIVED:LTR t ENCL
( SIZE:
TITLE: Operator Licensing Examination Reports NOTES:
RECIPIENT ID CODE/NAME PD2-2 PD
~
INTERNAL: AEOD/DSP/TPAB NRR/DLPQ/LHFB11 NUDOCS-ABSTRACT RGN2 FILE 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME EDISON,G NRR SHANKMAN,S
~Q LB10 REG FILE 02 NRC PDR
. COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WACKE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED AL NUMBER OF COPIES REQUIRED:
LTTR 12 ENCL 12
January 19, 1990 Florida Power and Light Company ATTN:
Mr. J.
H. Goldberg Executive Vice President - Nuclear Nuclear Energy Department P. 0.
Box 14000 Juno
- Beach, FL, 33408-0420 Gentlemen:
SUBJECT:
TURKEY POINT NUCLEAR, PLANT EXAMINATION REPORT 250/OL-89-03 On November 6 - 9, 1989, the NRC administered examinations to employees of your company who had applied for licenses to operate your Turkey Point Nuclear Plant Units 3 and 4.
At the conclusion of the examination, the examination questions and preliminary findings were discussed with those members of your staff identified in the enclosed report.
In accordance with 10 CFR 2.790 of-the Commissions regulations, a copy of this letter and the enclosures will be placed in the NRC Public Document Room.
Should you have any questions concerning this examination, please contact us.
Sincerely, (Original signed by T. A. Peebles)
Thomas A. Peebles, Chief Operations Branch Division of Reactor Safety
Enclosures:
1..
Examination Report 50-30/OL-89-03 2.
Examinations and Answer Keys (SRO/RO) 3.
Facility Comments 4.
Simulation Facility Fidelity Report cc w/encls 1, 3, and 4:
P. McCullough, Corporate Training Director J. Cross, Plant Manager cc w/encls 1, 2, 3, and 4:
K. Beatty, Training Supervisor cc w/encl 1:
State of Florida yQCj2090084 'r'00il'P PDR ADOCK 0 0002 0
V PDC
Florida Power and Light Company January 19, 1990 bcc w/encl 1:
E. Edison, NRR R. Crlenjak, DRP R. Bucher, Senior Resident Inspector bcc w/encls 1, 2, 3, and 4:
NRC Public Document Room B. Hoffitt, PNL bcc w/encls 1 and 4:
Operator Licensing Branch, DLPg:NRR RII:GRS RII:DRS
~
~
BYiichael: sd JM rman 01/
/90 01/P,/90 (l'I RII:DRS c(
CCastp-Ol/~/90 It RII'D S ebles 01/(~/90