ML17347B540

From kanterella
Jump to navigation Jump to search
Responds to NRC Bulletin 89-003, Potential Loss of Required Shutdown Margin During Refueling Operations. Plant Procedures Changed to Address Use of Fast & Will Be Completed & Implemented by 900315
ML17347B540
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/23/1990
From: Goldberg J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
IEB-89-003, IEB-89-3, L-90-09, L-90-9, NUDOCS 9001310516
Download: ML17347B540 (5)


Text

ACCELERATED ITRIBUTION DEMON~TION SYSTEM P

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9001310516 DOC.DATE: 90/01/23 NOTARIZED: YES - DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH".NAME AUTHOR AFFILIATION GOLDBERG,J.H. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds to NRC Bulletin 89-003, "Potential Loss of Required Shutdown Margin During Refueling Operations."

j DISTRIBUTION CODE: IE29D COPIES RECEIVED:LTR ~ ENCL i SIZE:

TITLE: Bulletin 89-03,Potential Loss of Required Shutdown Margin During Refu NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 0 PD2-2 PD '1 1 EDISON,G. 1 1 INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 KOPP,LARRY 1 1 LABARGE,DAVE 1 1 NRR/DET/ECMB 9H 2 2 NRR/DET/EMEB9H3 1' NRR/DOEA/OEAB11 1 1 NRR/DOEA/OGCB11 1 1 NRR/DREP/PEPB9D 1 1 NRR/DST 8E2 1 1 NRR/HERMAN /B 1 1 NRR/MCLELLAN,T 1 1 NRR/PMAS/ILRB12 1 1 NRR/ROOD,H 1 1

-NRRJSELLERS,D 1 1 NUDOCS-ABSTRACT 1 1 REG~E ~0 1' RES/DS IR/EIB 1 1 RGN2 FILE 01 1 1 EXTERNAL LPDR 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL 25

P.O. Box 14000, Juno Beach, FL 33408.0420 1

)ANUARI 2 3 L-90-09 10 CFR 50.54(f)

U. S. Nuclear Regulatory Commission Document Control Desk 'ttention:

Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 NRC Bulletin 89-03 On November 21, 1989 the NRC issued NRC Bulletin 89-03, "Potential Loss of Required Shutdown Margin During Refueling Operations", to alert licensees to the potential loss of required shutdown margin during movement. and placement of highly reactive .fuel during refueling operations.

In addition, the bulletin requested all licensees to review procedures and training to assure adequate shutdown margin is maintained during all refueling operations.

Florida Power & Light Company has completed the requested review for our Turkey Point Units and provides the attache'd .response pursuant to 10 CFR 50.54(f).

Very truly yours,

/

( m ~'j(g~p J. H. Goldberg +

Executive Vice President JHG/GRM/rh Attachment cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 000$ ~< j,OGl.6 9Ci0i2~~

0 aDOCt; 0:OOC>."-=0 F" DC Egg

0' Re: Turkey Point Units 3 -and 4 Docket Nos. 50-250 and 50-251 NRC Bulletin 89-03 Res onse NRC Bulletin 89-03 "Potential Loss of Required Shutdown Margin During Refueling Operations".

Action 1 Assure that any intermediate fuel assembly configuration (including control rods) intended to be used during refueling is identified and evaluated to maintain sufficient refueling boron concentration to result in'a minimum shutdown margin of approximately 54.

~Res onse Turkey Point Units 3 and 4 will use a Fuel Assembly Storage Table (FAST) that identifies which assemblies can be temporarily stored in what locations during a core reload and still maintain the 5% shutdown margin. The FAST will be provided by Westinghouse as part of the reload design process starting with Unit 3, Cycle XII. This refueling outage is scheduled to start in February 1990.

Action 2 Assure that fuel procedures only allow those intermediate fuel assembly configurations that do not violate the allowable shutdown margin and that these procedures are strictly adhered to.

~Res onse Plant procedures are being changed to address the use of the FAST. These procedures changes will be completed and imple-mented by March 15, 1990 and prior to fuel movement.

Compliance with these procedures will assure maintenance of the 5~ shutdown margin.

Action 3 Assure that the staff responsible for refueling operations is trained in the procedures recommended in Item 2 above and understand the potential consequences of violating these procedures. This training should include fundamental aspects of criticality control with higher enriched fuel assemblies.

~Res onse Plant personnel involved in refueling operations and responsible for maintaining the inverse count rate plot during the performance of a core refueling will be briefed on the criticality concerns and the use of the FAST by March 15, 1990.

STATE OF FLORIDA )

) SS ~

COUNTY OF PALM BEACH )

Z. H. Goldberg being first duly sworn, deposes and says:

That he is an Executive Vice President, of Florida Power & Light Company, the Licensee,heiein;.

That he has executed the foregoing document; that the statements made in this document are true and correct to the best of his knowledge, information and belief, and that he is authorized- to, execute the document on behalf of said Licensee.

J. H. Gol rg Subscribed and sworn to before Xs day

- (~" <<0 "~J of 3~A,c.c li i., me this 19 (r~.

r c c- r'" $ <0 NOTARY PUBLIC, in and for the ounty of Palm Beach, State of Florida Horirfa Notary Public, State of Expires june.1 1993 My Comer'rssiorr y Commission expir'es