Text
ACCELERATED UTION DEMON TION SYSTEM REGULATORY INFORMATXON DISTRXBUTION SYSTEM (RIDS)
ACCESSION NBR:9001260183 DOC.DATE: 90/01/19 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C
. 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION HARRIS,K.N.
Florida Power
& Light Co.
RECIP.NAME RECIPXENT AFFILIATXON Document Control Branch (Document Control Desk)
SUBJECT:
Forwards select sys assessment progress summary for Dec 1989 for Units 2
6 3.
DISTRIBUTION CODE:
AOOID COPIES RECEIVED:LTR [
ENCL
(
SIZE:
TITLE: OR Submittal: General Distribution NOTES RECIPXENT ID CODE/NAME PD2-2 LA EDISON,G INTERNAL: NRR/DET/ECMB 9H NRR/DST 8E2 NRR/DST/SXCB 7E NUDOCS-ABSTRACT OGC/HDS2 RES/DSXR/EIB EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1
1 5
5 1
1 1
1 1
1 1
1 1
0 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-2 PD NRR/DOEA/OTSB11 NRR/DST/SELB 8D NRR/DST/SRXB 8E OC/LFMB E
LE 01 NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
0 1
1 1
.1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISIRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED:
LTTR 21 ENCL 19
I
~
~
~
P.O. Box14000, Juno Beach, FL 33408-0420
(
1
<Us'r rQ fu y
v g gaN 1985O L-90-12 U.
S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.
C.
20555 Gen+lemen:
Re:
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251, Select' stem Assessment Pro ress Summar Pursuant to the Nuclear Regulatory Commission Order dated August 12, 1986, the attachment to this letter provides the December 1989 progress summary of the Select System Assessment.
Should there be any questions regarding this information, please contact us.
Very truly yours, K. N. Harri Vice President Turkey Point Nuclear Plant KNH/TCG/gp Attachment cc:
Stewart D. Ebneter, Regional Administrator, Region XI, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant PDR ADOC~
>00119001260183 K OS00025'0 ROC gol an FPL Group company
0g l'ul'f g )
vip,"
F 3r 1
SELECT SYSTEM REVIEW DECEMBER 1989 STATUS ORIGINAL 15 SYSTEMS WALKDOWN AS BUILT RECORDS Breaker. List (IS Mod 1265)
Scheduled to be completed January 22, 1991 P&ID's (IS Mod 1098)
Completed December 28, 1989 MISCELLANEOUS ITEMS Unit 3
RHR 887 Valve Replacement (IS Mod 519)
Scheduled completion during the next Unit 3 Refueling Outage Unit 4 Outage Related Modifications RHR 887 Valve Replacement (IS Mod 565)
Scheduled completion deferred until the
. next Unit 4
Refueling Outage EDG Redundant Set of Air Start Motors (IS Mod 576)
Scheduled completion deferred to coincide with the Emergency Power System Upgrade Project Outage currently scheduled to begin in 1991 ADDITIONAL SYSTEMS ARMS PRMS'CC WALKDOWNS P
6 ID's (IS Mod 1042)
Scheduled for completion during next Unit 3 Refueling Outage P
6 ID Update Schedule to be determined following walkdowns
QO IJ