ACCELERATED gTRIBUTION DEMONS'ATION SYSIIPUI REGULATORY INFORMATION DISTRIBUTION SYSTEM (RZDS)

ACCESSION NBR:9001230158 NOTARIZED: NO FACIL:50-250 Turkey Point Plant; DOC.DATE it 3, Florida Power and 50-251 Turkey Point Plant, Unit 4, Florida Power and Light Light C

C DOCKET g 05000250 05000251 AUTH. NAME AUTHOR AFFILIATION BONETT,D.M. Florida Power & Light Co.

HARRIS,K.N. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly o g repts for Dec 1989 for Turkey Point Units 3 & 4.W 0011 tr.

DISTRIBUTION CODE. 4D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Spec )

NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME .LTTR ENCL PD2-2 LA 3 3 .PD2-2 PD 1 1 EDISON,G 1 1 INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 IRM TECH ADV NRR/DOEA/OEAB11 NUDOCS-ABSTRACT 2

1 1

2 1

1 NRR/DLPQ/LPEB10 RRQDRB&/

REG FILE ll 0

1 1

1 1

1 1

RGN2 1 1 EXTERNAL: EG&G SIMPSON, F 1 1 LPDR 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASIKI CONTACT THE. DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 19 ENCL 19

I C,

~ m gal ~

~ ~

~

P.O. Box14000,Juno Beach, FL 33408-0420 PAL JAN $ 6 )99O L-90-11 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort Attached are the December 1989 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, P. pl. j/ERR IJ'.

N. Harris Vice President Turkey Point Plant Nuclear KNH/DMB Attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9001230158 891231 PDR ADOCK 05000250 R PDC

~pI an FPL Group company

~l

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turke Point 3 DATE Zanua 16 1990 COMPLETED BY D. M. Bonett TELEPHONE'07 '694-4432 REPORT MONTH December 1989 Unit 3 reduced power to perform a turbine valve test. Full power operation was resumed.

The unit was shutdown for the 3B and 3C Main Steam Isolation Valve Connection Box inspection and repair. Full power operation was delayed for secondary chemistry and axial flux control.

0 OFERATXHG DATA REFORT DOCf<ET HQ 50 250 DATE 1/16/'98 CORP I ETED E:Y D' BQNI-"TT TELE:PHONE 487/694/4432 QPE:RATXHG STATUS UHTT HARE t TURKEY F'OXHT 4t HAHI Pl ATE RATXHG <GROSS AWE)t 5, DESIGN E:LECTRICAL RATING. (HET NRE):

'208 UHIT 3 2 t RI=PQRTIHG PERTOD t Dl:CEHI:-lER 1 989 3 LICE:HSED THEf'HAL POWER (MAT)

6. VAXXVUH DI=PL.HDABLE CAFACITY <GROSS V@I=-):

760 693 699 7 t HAXIHUH DE:PE:HDAElLE CAF'ACITY (HET HHE) t 666 8', IF CHANGES QCCUI'N CAPAC'.KTY RATINGS (ITENS HUHI='ER, 3 THROUGH 7)

SINCE LAST REF'ORT ~ GIVE REASQNS:

PORE:R LFVEL TO WHICH RESTRICTE:Dv IF'HY '(HET SHE) 10, REASON! FOI 'ESTRICTIONS XF ANY l HOHTHLY YTD- CUPFUL.ATIVE 11t I.IOURS XH REPORT F'ERIQD t 744 8760 149673.6 lZ. HUNBFR OF I.IOURS REACTOR WAS CRXTTCAL 744 t.8 5806t5 99190 t 2 13t I"EACTOR I'ESERVI= SHUTDOWN HOURS 8 t.O Ot0 f344 t 4 l4t I-IOIJRS GENERATOR'N-LINE '736 t 7 5697.4 '97854t7 15t UH:KT RI=SI=RVE SI-IUTDQHN HOURS 8tO Ot0 121 t'8 16 CROSS THERMAL. EHE:f<GY. GENERATED (NHH) 1547473 11841854 203834803

'7t CROSS ELECTR:KCA'L EHERGY GENERATED (MWH) 503980 3798350 65868876 18 NET ELECTRICAL ENERGY GEHERA'1'ED ( HWH ) 488088 3586305 6l 516849

'9t UH:KT 'SLRVICE, FACTOR 99tO 65t0 65t4 28t UHXT,AVAXLABXLXTYFACTOR 99t8 65tO 65t5

21. CAFACITY FACTOR (uSIHG HDC HET) 96t9 61t5 62t9
22. CAF'ACITY FACTOR ( USING DER NET ) 93t1 59.1 59t3 Z3t IJNXT FORCED OUTAGE RATE 1tO 15t8 12t9
24. SHUTDOWNS SCI-IEDUL.ED OVER NEXT 6 'CONTI-IS 2/4/98'El=uELXHG 25, XF SHUT DOHH AT EHD OF REPORT F'ERXOD ESTINATED DATE OF STARTUF",

I AVERAGE DAILY'NIT'OWER DOCKET NO 50-250 UNIT Turke Point 3 DATE Janua 16 9 COMPLETED BY D. M. Bonett TELEPHONE 407 694-4432'ONTH December 1989 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 12/ 1/89 691 12/ 2/89 698 12/ 3/89 689 12/ 4/89 701 12/ 5/89 698 12/ 6/89 691 12/ 7/89 684 12/ 8/89 475 12/ 9/89 684 12/10/89 685 12/il/89 692 12/12/89 693 12/13/89'2/14/89 686 693 1'2/15/89 693 12/16/89 689 12/17/89 684 12/18/89 675 12/19/89 668 12/20/89 666 12/21/89 670 12/22/89, 675 12/23/89 684 12/24/89 701 12/25/89 138 12/26/89 306 12/27/89 609 12/28/89 695 12/29/89 698-12/30/89 692 12/31/89 684

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50- 250 DATE Januar 16, .1990.

COMPLETED BY D. M. Bonett REPORT MONTH December 1989 TELEPHONE Method of Shutting Licensee Causes Corrective Duration Down Event System Component Actionto No. Date Type (Hours) Reason~ Reactor Report¹ Code4 Codes PreventRecurrence 13 891208 S 0.0 HA TURBIN Unit 3 reduced power to perform a turbine valve test. Full power operation was resumed.

14 891225 F 7.3 CD ELECON The unit was shutdown for the 3B and 3C Main Steam Isolation Valve Connection Box inspection and repair.

Full power operation was delayed for secondary chemistry and axial flux control.

F Forced Reason Method Exhibit G- instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2- Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report(LER) File D - Regulatory Restriction 4- Continued (NUREG4161)

E - Operator Training & Ucense Examination 5- Load Reduction '

F - Administrative - Other(Explain)

G - Operational Error (Explain) Exhibit1-Same Source H - Other (Explain)

~I A

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO 50-251 UNIT Turke Point 4 DATE Zanua 16 1990 COMPLETED BY D. M. Bonett

'TELEPHONE 407 694-4432 REPORT MONTH December 1989 Unit 4 reduced'ower to repair a condenser tube leak. Full power operation was then resumed.

Later, the unit reduced power again to repair another condenser tube leak.

Nhile returning to full power operation, the unit tripped due to the 4A Main Steam Isolation Valve closing. The MSIV connection box was inspected and repaired. -Full power operation was delayed for secondary chemistry control and to repair a condenser leak in a waterbox.

4l OF'ERATXNG DATA REPORT DOCKET NO 50 251 DATE 1/16/98 COMPLETED BY D M BOHETT TE:LEPI-IOHE 487/694/4432 OPERATING STATUS 1, UHXT NAME: TURKEY F'QXNT ,UNIT zi RI=PQRTXNG PERIOD+ Dl="CEME'ER 1989 3i LICENSED THERMAL POWER (MWT)i zzee.

5 6

NAMEPLATE RATXHG (GROSS MWE)+

DESIGN ELECTRICAL 'RAT:I:NG (NET MAXXMlJM'I=PENDAILE CAF'ACXTY ( GROSS MWE MWE)'93):

768 699 7i MAXTMUM DEPEHDAE:LE CAPACITY (HET MWF): 666 8 IF CHAHGES OCCUR XH CAPACXTY RATIHGS (XTEMS NUMBER 3 THROUGH 7)

STNCE LAST REF'QRT G1VE REASQNS:

POWER LEVEL TO WHICH RESTRICTED~ XF ANY (HET MWE) 18, REASONS FOI'ESTRICTIONS~ XF ANY'ONTHLY

- YTD- CUMULATIVE lii 12.

HOURS XH RFPORT I='ERXQDi HUMBER OF .I-IQURS REACTOR WAS CRXTXCAL 744 647' 8760 4147+2 143485+8 94383i7

13. r'EACTOr'ESEr'VF SHUTDOWN Hour' 8 i8 8+8 lbbob I.IQUf<S GENERATOR QN-LTHE 641.i 6 3678+8 9e87z' 15, UNIT RESERVE SHUTDOWN HOURS 8+8 8+8 32 t lb, CROSS THERMAL ENE:RGY GENERATED (MWH) 1145276 7141924 191224344 17, GROSS ELFCTRXCAL ENERGY GENERATED .(MWH) 362100 224S029 60993831
18. HET ELECTRTCAL ENERGY GENERATED (MWH) 3413i.9 ze879ei 57671160 19 o. UNIT SLRVICE 86+2 42' 63+4 86.2 42+8 63+4 FACTOR'8.

IJNXT A VAXLABXLXTYFACTOR Zli CAI- ACXTY FACTOR <USING MDC NET) 68+9 35+8 61+6

22. CAF'ACITY FACTOR < USXNG DER HET ) bbiz 34+4 58ie
23. UNIT FORCED OUTAGE RATE 13i8 24 i 3 iz+8
24. SHUTDOWNS SCI-IEDULED OVER NEXT 6 MONTHS ZS. XF SHUT DOWN AT END OF REPORT PERIOD~ ESTIMATED DATE OF ST*RTUF".

AVERAGE DAILY UNIT 'POWER'EVEL DOCKET NO. 50-251 UNIT Turke Point 4 DATE Zanua 16 990:

COMPLETED .BY 'D. M. Bonett TELEPHONE '07 694-4432 MONTH December 1989 DAY AVERAGE DAILY POWER (MWe-Net) 12/ 1/89 696 12/ 2/89 695 12/ 690 4/89 701 3/89'2/

12/ 5/89 69I 12/ 6/89 691 12/ 7/89 688 12/ 8/89 688 12/ 9/89 685 12/1 8/89 211 12/ii/89 98 12/12/89 335 12/i3/89 647 12/14/89 69'4 700 12/15/89'2/16/89 697

.12/17/89 689

,f2/18/89 689 12/19/89 583 12/20/89 208 12/21/89 333 12/22/89 346 12/23/89'2/24/89 453 12/25/89 -9'18 12/26/89 12/27/89 -19 194 12/28/89'2/29'/89 384 12/30/89 388 12/31/89 427

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 DATE Jan uar 16 1990 COMPLETED BY D. H. Bon e tt REPORT MONTH 0 TELEPHONE (407) 694-4432 Method of Shutting Ucensee Causes Corrective Duration Down Event System Component Actionto Date Type (Hours) Reason~ Reactor Report¹ Code4 Codes Prevent Recurrence 26 891210 0.0 HC HTEXCH Unit 4 reduced power to repair a condenser tube leak. Full power operation was then resumed.

27 891219 0.0 HC HTEXCH Unit 4 reduced power to repair a condenser tube leak.

28 891223 102.4 251-89-020 CD ELECON While returning to full power operation, unit 4's reactor tripped due to the.4A Hain Steam Isolation Valve closing. The HSIV connection box was inspected and repaired.

Full power operation was delayed for secondary chemistry control and to repair a condenser leak in a waterbox.

F Forced Reason Method Exhibit G- instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report(LER) File D - Regulatory Restriction 4 - Continued (NUAEGC161)

E - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain) Exhibit1-Same Source H - Other (Explain)

0 h,