ML17347B525
| ML17347B525 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 12/31/1989 |
| From: | Bonett D, Harris K FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| L-90-11, NUDOCS 9001230158 | |
| Download: ML17347B525 (17) | |
Text
ACCELERATED gTRIBUTION DEMONS'ATION SYSIIPUI REGULATORY INFORMATION DISTRIBUTION SYSTEM (RZDS)
ACCESSION NBR:9001230158 DOC.DATE NOTARIZED: NO DOCKET g
FACIL:50-250 Turkey Point Plant; it 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION BONETT,D.M.
Florida Power
& Light Co.
HARRIS,K.N.
Florida Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly o g repts for Dec 1989 for Turkey Point Units 3
& 4.W 0011 tr.
DISTRIBUTION CODE.
4D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Spec
)
NOTES RECIPIENT ID CODE/NAME PD2-2 LA EDISON,G INTERNAL: AEOD/DOA IRM TECH ADV NRR/DOEA/OEAB11 NUDOCS-ABSTRACT RGN2 EXTERNAL: EG&G SIMPSON, F NRC PDR COPIES LTTR ENCL 3
3 1
1 1
1 2
2 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME
.PD2-2 PD AEOD/DSP/TPAB NRR/DLPQ/LPEB10 RRQDRB&/
ll REG FILE 0
LPDR NSIC COPIES
.LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 1
1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASIKI CONTACT THE.DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 19 ENCL 19
I C,
~
m gal
~
~
~
~
P.O. Box14000,Juno Beach, FL 33408-0420 PAL JAN
$ 6 )99O L-90-11 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.
C.
20555 Gentlemen:
RE:
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 Monthl 0 eratin Re ort Attached are the December 1989 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.
Very truly yours, P. pl. j/ERR IJ'.
N. Harris Vice President Turkey Point Plant Nuclear KNH/DMB Attachments cc:
Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9001230158 891231 PDR ADOCK 05000250 R
~pI
~l
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turke Point 3
DATE Zanua 16 1990 COMPLETED BY D. M. Bonett TELEPHONE'07
'694-4432 REPORT MONTH December 1989 Unit 3 reduced power to perform a turbine valve test.
Full power operation was resumed.
The unit was shutdown for the 3B and 3C Main Steam Isolation Valve Connection Box inspection and repair.
Full power operation was delayed for secondary chemistry and axial flux control.
0
QPE:RATXHG STATUS OFERATXHG DATA REFORT DOCf<ET HQ 50 250 DATE 1/16/'98 CORP I ETED E:Y D' BQNI-"TT TELE:PHONE 487/694/4432 UHTT HARE t TURKEY F'OXHT UHIT 3 2 t RI=PQRTIHG PERTOD t Dl:CEHI:-lER 1 989 3
LICE:HSED THEf'HAL POWER (MAT)'208 4t HAHI Pl ATE RATXHG
<GROSS AWE)t 760 5,
DESIGN E:LECTRICAL RATING. (HET NRE):
693 6.
VAXXVUH DI=PL.HDABLE CAFACITY <GROSS V@I=-):
699 7 t HAXIHUH DE:PE:HDAElLE CAF'ACITY (HET HHE) t 666 8', IF CHANGES QCCUI'N CAPAC'.KTY RATINGS (ITENS HUHI='ER, 3 THROUGH 7)
SINCE LAST REF'ORT ~
GIVE REASQNS:
PORE:R LFVEL TO WHICH RESTRICTE:Dv IF'HY '(HET SHE) 10, REASON!
FOI 'ESTRICTIONS XF ANYl HOHTHLY YTD-CUPFUL.ATIVE 11t lZ.
13t l4t 15t 16
'7t 18
'9t 28t 21.
22.
Z3t 24.
I.IOURS XH REPORT F'ERIQD t HUNBFR OF I.IOURS REACTOR WAS CRXTTCAL I"EACTOR I'ESERVI=
SHUTDOWN HOURS I-IOIJRS GENERATOR'N-LINE UH:KT RI=SI=RVE SI-IUTDQHN HOURS CROSS THERMAL. EHE:f<GY. GENERATED (NHH)
CROSS ELECTR:KCA'L EHERGY GENERATED (MWH)
NET ELECTRICAL ENERGY GEHERA'1'ED
( HWH )
UH:KT 'SLRVICE, FACTOR UHXT,AVAXLABXLXTYFACTOR CAFACITY FACTOR (uSIHG HDC HET)
CAF'ACITY FACTOR
( USING DER NET )
IJNXT FORCED OUTAGE RATE SHUTDOWNS SCI-IEDUL.ED OVER NEXT 6 'CONTI-IS 2/4/98'El=uELXHG 744 744 t.8 8 t.O
'736 t 7 8tO 1547473 503980 488088 99tO 99t8 96t9 93t1 1tO 8760 5806t5 Ot0 5697.4 Ot0 11841854 3798350 3586305 65t0 65tO 61t5 59.1 15t8 149673.6 99190 t 2 f344 t 4
'97854t7 121 t'8 203834803 65868876 6l 516849 65t4 65t5 62t9 59t3 12t9 25, XF SHUT DOHH AT EHD OF REPORT F'ERXOD ESTINATED DATE OF STARTUF",
I
AVERAGE DAILY'NIT'OWER DOCKET NO 50-250 UNIT Turke Point 3
DATE Janua 16 9
COMPLETED BY D. M. Bonett TELEPHONE 407 694-4432'ONTH December 1989 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 12/ 1/89 12/ 2/89 12/ 3/89 12/ 4/89 12/ 5/89 12/ 6/89 12/ 7/89 12/ 8/89 12/ 9/89 12/10/89 12/il/89 12/12/89 12/13/89'2/14/89 1'2/15/89 12/16/89 12/17/89 12/18/89 12/19/89 12/20/89 12/21/89 12/22/89, 12/23/89 12/24/89 12/25/89 12/26/89 12/27/89 12/28/89 12/29/89 12/30/89 12/31/89 691 698 689 701 698 691 684 475 684 685 692 693 686 693 693 689 684 675 668 666 670 675 684 701 138 306 609 695 698-692 684
UNITSHUTDOWNS AND POWER REDUCTIONS REPORT MONTH December 1989 DOCKET NO.
50- 250 DATE Januar 16,.1990.
COMPLETED BY D.
M. Bonett TELEPHONE No.
Date Type Duration (Hours)
Reason~
Method of Shutting Down Reactor Licensee Event Report¹ System Code4 Component Codes Causes Corrective Actionto PreventRecurrence 13 891208 S
0.0 HA TURBIN Unit 3 reduced power to perform a
turbine valve test.
Full power operation was resumed.
14 891225 F
7.3 CD ELECON The unit was shutdown for the 3B and 3C Main Steam Isolation Valve Connection Box inspection and repair.
Full power operation was delayed for secondary chemistry and axial flux control.
F Forced S Scheduled Reason A - Equipment Failure(Explain)
B - Maintenance orTest C - Refueling D - Regulatory Restriction E - Operator Training &Ucense Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
Method 1 - Manual 2-Manual Scram 3 - Automatic Scram 4-Continued 5-Load Reduction '
- Other(Explain)
ExhibitG-instructions forPreparation ofData Entry Scheets Ucensee Event Report(LER) File (NUREG4161)
Exhibit1-Same Source
~I A
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO 50-251 UNIT Turke Point 4
DATE Zanua 16 1990 COMPLETED BY D. M. Bonett
'TELEPHONE 407 694-4432 REPORT MONTH December 1989 Unit 4 reduced'ower to repair a condenser tube leak.
, Full power operation was then resumed.
- Later, the unit reduced power again to repair another condenser tube leak.
Nhile returning to full power operation, the unit tripped due to the 4A Main Steam Isolation Valve closing.
The MSIV connection box was inspected and repaired.
-Full power operation was delayed for secondary chemistry control and to repair a condenser leak in a waterbox.
4l
OPERATING STATUS OF'ERATXNG DATA REPORT DOCKET NO 50 251 DATE 1/16/98 COMPLETED BY D
M BOHETT TE:LEPI-IOHE 487/694/4432 1,
UHXT NAME: TURKEY F'QXNT
,UNIT zi RI=PQRTXNG PERIOD+
Dl="CEME'ER 1989 3i LICENSED THERMAL POWER (MWT)i zzee.
NAMEPLATE RATXHG (GROSS MWE)+
768 5
DESIGN ELECTRICAL 'RAT:I:NG (NET MWE)'93 6
MAXXMlJM'I=PENDAILE CAF'ACXTY ( GROSS MWE):
699 7i MAXTMUM DEPEHDAE:LE CAPACITY (HET MWF):
666 8
IF CHAHGES OCCUR XH CAPACXTY RATIHGS (XTEMS NUMBER 3 THROUGH 7)
STNCE LAST REF'QRT G1VE REASQNS:
POWER LEVEL TO WHICH RESTRICTED~
XF ANY (HET MWE) 18, REASONS FOI'ESTRICTIONS~
XF ANY'ONTHLY
-YTD-CUMULATIVE lii HOURS XH RFPORT I='ERXQDi 12.
HUMBER OF.I-IQURS REACTOR WAS CRXTXCAL 13.
r'EACTOr'ESEr'VF SHUTDOWN Hour' I.IQUf<S GENERATOR QN-LTHE 15, UNIT RESERVE SHUTDOWN HOURS lb, CROSS THERMAL ENE:RGY GENERATED (MWH) 17, GROSS ELFCTRXCAL ENERGY GENERATED.(MWH) 18.
HET ELECTRTCAL ENERGY GENERATED (MWH) 19 o. UNIT SLRVICE FACTOR'8.
IJNXT AVAXLABXLXTYFACTOR Zli CAI-ACXTY FACTOR
<USING MDC NET) 22.
CAF'ACITY FACTOR
< USXNG DER HET )
23.
UNIT FORCED OUTAGE RATE 24.
SHUTDOWNS SCI-IEDULED OVER NEXT 6 MONTHS 744 647' 8 i 8 641.i 6 8+8 1145276 362100 3413i.9 86+2 86.2 68+9 bbiz 13i8 8760 4147+2 8+8 3678+8 8+8 7141924 224S029 ze879ei 42' 42+8 35+8 34+4 24 i3 143485+8 94383i7 lbbob 9e87z' 32 t 191224344 60993831 57671160 63+4 63+4 61+6 58ie iz+8 ZS.
XF SHUT DOWN AT END OF REPORT PERIOD~
ESTIMATED DATE OF ST*RTUF".
AVERAGE DAILY UNIT 'POWER'EVEL DOCKET NO. 50-251 UNIT Turke Point 4
DATE Zanua 16 990:
COMPLETED.BY 'D. M. Bonett TELEPHONE '07 694-4432 MONTH December 1989 DAY AVERAGE DAILY POWER (MWe-Net) 12/ 1/89 12/ 2/89 12/
3/89'2/4/89 12/ 5/89 12/ 6/89 12/ 7/89 12/ 8/89 12/ 9/89 12/1 8/89 12/ii/89 12/12/89 12/i3/89 12/14/89 12/15/89'2/16/89
.12/17/89
,f2/18/89 12/19/89 12/20/89 12/21/89 12/22/89 12/23/89'2/24/89 12/25/89 12/26/89 12/27/89 12/28/89'2/29'/89 12/30/89 12/31/89 696 695 690 701 69I 691 688 688 685 211 98 335 647 69'4 700 697 689 689 583 208 333 346 453
-9'18
-19 194 384 388 427
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH 0
DOCKET NO.
50-251 DATE Jan uar 16 1990 COMPLETED BY D.
H.
Bon ett TELEPHONE (407) 694-4432 26 Date 891210 Type Duration (Hours) 0.0 Reason~
Method of Shutting Down Reactor Ucensee Event Report¹ System Code4 HC Component Codes HTEXCH Causes Corrective Actionto Prevent Recurrence Unit 4 reduced power to repair a
condenser tube leak.
Full power operation was then resumed.
27 891219 0.0 HC HTEXCH Unit 4 reduced power to repair a
condenser tube leak.
28 891223 102.4 251-89-020 CD ELECON While returning to full power operation, unit 4's reactor tripped due to the.4A Hain Steam Isolation Valve closing.
The HSIV connection box was inspected and repaired.
Full power operation was delayed for secondary chemistry control and to repair a condenser leak in a waterbox.
F Forced S Scheduled Reason A - Equipment Failure(Explain)
B - Maintenance orTest C - Refueling D - Regulatory Restriction E - Operator Training &License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Explain)
ExhibitG-instructions forPreparation ofData EntryScheets Ucensee Event Report(LER) File (NUAEGC161)
Exhibit1-Same Source
0 h,