Text
ACCELERATED DISTBJBUTION DEMONSTRATION SYSTEM
~
'EGULATORY
INFORMATION DISTRIBUTION SYSTEM (RIDS)
ESSION NBR:8912270046
DOC.DATE: 89/12/18
NOTARIZED:
NO
DOCKET
FT
FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C
05000250
50-251 Turkey Point Plant, Unit 4, Florida Power and Light C
05000251-
AUTH.NAME
AUTHOR AFFILIATION
STOHR,J.P.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
GOLDBERG,J.H.
Florida Power
& Light Co.
SUBJECT:
Forwards Insp Repts 50-250/89-50
& 50-251/89-50
on
891128-1201.No violations or deviations noted.
DISTRIBUTION CODE: IEOID
COPIES
RECEIVED:LTR
ENCLj
SIZE: 3%
TITLE: General
(50 Dkt)-Insp Rept/Notice of Vio ation Response
NOTES
RECIPIENT
ID CODE/NAME
PD2-2
INTERNAL: AEOD
AEOD/TPAD
NRR SHANKMAN,S
NRR/DLPQ/LPEB10
NRR/DREP/PEPB9D
NRR/DRIS/DIR
NRR/PMAS/ILRB1 2
OE~IEBEBMAN,J
Cl~~k,
RGN2
FILE
01
EXTERNAL: LPDR
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1-
1
1
1
1
11
.1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
EDISON, G
AEOD/DEIIB
DEDRO
NRR/DET/DIR 8H3
NRR/DOEA DIR 11
NRR/DREP/PRPB11
NRR/DST/DIR 8E2
NUDOCS-ABSTRACT
OGC/HDS2
RES MORISSEAU,D
NRC PDR
COPIES
'TTR
ENCL
1
1
1
1
1
1
1
-, 1
1
1.
2
2
1
1
1
'
1
1
1
1
1
1
A
L'R
D
D
NOTE TO ALL"RIDS" RECIPIENIS:
PLEASE HELP US TO REDUCE WAS'ONTACTTHE.DOCUMENI'ONTROLDESK,
ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISHUBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!
TAL NUMBER OF COPIES
REQUIRED:
LTTR
25.
ENCL
'25
'
OEc 5. o t99g
GFRe ~a.(
Docket Nos. 50-250,
50-251
License
Nos.
Florida Power
and Light Company
ATTN:
Hr. J.
H. Goldbera
Executive Vice President
- Nuclear
P. 0.
Box 14000
Juno
Beach,
FL
33408-0420
Gentlemen:
SUBJECT:
" NRC INSPECTION
REPORT
NOS. 50-250/89-50
AND 50-251/89-50
This refers to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
E.
D. Testa
on
November
28 -
December
1,
1989.
The inspection
included
a
review of activities
authorized
for your Turkey Point facility.
At the
conclusion of the inspection,
the findings were discussed
with those
members of
your staff identified in the enclosed
inspection report.
Areas
examined
durina
the inspection
are identified in. the report.
Within
these
areas,
the inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and observation
of
activities in progress.
V
hithin the
scope
of the
inspection,
no violations
or deviations
were
identi fied.
Your attention is directed to the exercise
weakness
identified in Paragraph
6
of the
enclosed
inspection report.
Your. attention
is also directed
to the
commitment
discussed
in Paragraph
6.-
In particular, it is our understanding
that it is the plant manager's
intention to take
prompt corrective action
and
demonstrate
the
effectiveness
of these
corrective
actions
during the
1990
Annual
Emergency
Exercise.
If your understanding
of the
commitment differs
from that presented
please let us
know.
In accordance
with Section 2.790 of the
NRC's
"Rules of" Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and its enclosure
will be placed in the
NRC Public Document
Room.
8922270046
85'1218
ADOCK 05000250
9
.
Florida Power and Light Company
.
2
Should you have any questions
concerning this letter, please
contact us.
II
Sincerely,
+-: -'."j.~.L 5'GM<D gY
'-AS A<. CO) t )" <r
J. Philip Stohr, Director
Division of Radiation Safety
and Safeguards
Enclosure:
NRC Inspection
Report
cc w/encl:,
K. N. Harris, Vice President
Turkey Point Nuclear Plant
.
P.,O.
Box 029100
Miami,
FL
33102
J.
E. Cross,
Plant Manager
Turkey Point Nuclear Plant
P. 0.
Box 029100
Miami, FL
33102
L.
W. Bladow
Plant
gA Superintendent
Turkey Point Nuclear Plant
P. 0.
Box 029100
Miami, FL
33102
D. Powell, Regulatory
and
Compliance Supervi sor
Turkey Point Nuclear Plant
P. 0.
Box 029100
Miami, FL
33102
Harold F. Reis,
Esq.
Newman and Holtzinger, P.C.
1615
L Street,
NW
D.
C.
20036
John T. Butler, Esq.
Steel,
Hector and Davis
4000 Southeast
Financial
Center
Miami, FL
33131-2398
Attorney General
Department of Legal Affairs
The Capitol
Tallahassee,
FL
332304
cc w/encl:
-(Continued
on page 3)
Florida Power and Light Company
(cc:.
continued)
Jacob
Daniel
Nash
Office of Radiation Control
Department of Health and
Rehabilitative Services
1317 Winewood Boulevard
Tallahssee,
FL
32399-0700
Jack Shreve
Office of the Public Counsel
Room 4, Holland Building
Tallahassee,
FL
32304
Administrator
Department of Environmental
Reoulation
Power Plant Sitino Section
State of Florida
Twin Towers
2600 Blair Stone
Road
Tallahassee,
FL
32301
Joaquin Avino
County Manager of Metropolitan
Dade County
111
NW 1st Street,
29th Floor
Miami, FL
33128
Intergovernmental
Coordination
and.Review
Office of Planning
and Budget
Executive Office of the Governor
The Capitol Building
Tallahassee,
FL
32301
State of Florida
bcc w/encl:
G.
E. Edison,
NRR'ocument
Control
Desk
J.
Heard,
FEMA RIV
R. A. Erickson,
NRC Resident
Inspector
U.S. Nuclear Regulatory
Commission
P. 0.
Box 57-1185
Miami,
FL
33257-1185
RII:MRS
g.P V
ETesta
12/i</89
R
an in
12
89
RII:DRSS
gg~
Dtollins
12(c//89
R I:D
rlenjak
12/(f89
P