Summary of 891206 Meeting W/Util in Rockville,Md Re Pra. Handouts Encl
ML17347B455
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 12/11/1989
From: Edison G, Norris J
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
GL-88-20, NUDOCS 8912150061
Download: ML17347B455 (25)


Text

Yj

~gR RECy (4

P

~4 0

++**+

1 UNITED STATES t

NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 December 11, 1989 Docket Nos. 50-250, 50-251 and 50-335, 50-389 LICENSEE: Florida Power E Light Co.

FACILITY: Turkey Point Units 384, and St. Lucie Units 1&2

SUBJECT:

SUMMARY

OF MEETING WITH FLORIDA POWER AND LIGHT COMPANY (FPL)

ON DECEMBER 6, 1989 REGARDING PROBABILISTIC RISK ASSESSMENT A meeting was held in Rockville, Maryland on December 6,

1989 to discuss FPL's plans for, and status of, their Probabilistic Risk Assessment (PRA) for Turkey Poirt Units 354 and St. Lucie Units 182.

FPL stated they would complete and submit a

PRA for Turkey Point by June 1991 and for St.

Lucie sometime in mid-1993 with the exact date to be determined later.

The St. Lucie PRA will be performed after the Turkey Point PRA is completed.

The Turkey Point PRA will be performed for the improved four-diesel generator design which will be operational upon restart from the dual unit outage scheduled for 1991.

FPL indicated that the June 1991 submittal for Turkey Point may not include certificaticn that it represents the as-built design if modifications associated with the addition of two diesels are not sufficiently complete.

If necessary, certification could follow a few months later.

FPL indicated their PRA would be a "best estimate/realistic" approach as opposed to a conservative or bounding type of analysis.

The NRC staff noted that it will be very iIIIportant to quantify uncertainties associated with assumptions, limitations in scope, modeling and data.

The staff commented that although the 1993 date for the submittal of the St.

Lucie PRA is beyond the date envisioned by Generic Letter 88-20, the benefit of the experience gained by FPL in first performing the Turkey Point PRA will offset the effect of the delay of the St. Lucie submittal.

FPL 's basis for the meeting discussions, which was handed out to participants at the meeting, is attached as Enclosure l.

t 89i215006i 89i2i,i.

,'PDR ADOCK..Q500025Q PDC loE

An attendance list for the meeting is provided as Enclosure 2.

Original Signed By Original Signed By Gordon E. Edison, Sr. Project Manager Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/enclosure:

See next page

,DISTRIBUTION:

'NRC 8

LPDRs PD22 Rdg Fi le JSniezek 12/G/18 HBerkow RButcher RII MSinkule RII GLainas 14/H/4 RCrlenjak, RII RBorchardt 17/G/21 SVargp SHoffman ACRS,(10)

GEdison DMiller Jan Norris, Sr. Project Manager Project Directorate II-2 Division of Reactors Projects - I/II Office of Nuclear Reactor Regulation F:

D I

'P 'PDI-

L
DI-WWWWO

~

NAME :

DATE:12/

/89

GEdison:sl
12/I /89 WWWWW

/

JN rri:HPe o

e

~ w

+ww

12/I( /89:12//JI /89 W

0 WWI W OFFICIAL RECORD COPY Document Name:

FPIIL

SUMMARY

OF MEETING

~

h I

~

V tf I

VV IIIV g V

JV V

I

~ '

IV

~

Il I ~

I I

v

~

V II

~

U k

I

~

I

~

~

V

Florida Power 5 Light Company St. Lucie Plant CC:

Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Senior Resident Inspector St. Lucie Plant U.S. Nuclear Regulatory Commission 7585 S.

Hwy A1A Jensen

Beach, Flor ida 33457 State Planning

& Development Clearinghouse Office of P 1 arming 8 Budget Executive Office of the Governor The Capitol Building Tal lahassee, Florida 32301 Harold F. Reis, 'Esq.

Newman 5 Holtzinger 1615 L Street, N.W.

Washington, DC 20036 John T. Butler, Esq.

Steel, Hector and Davis 4000 Southeast Financial Center
Miami, F lorida 33131-2398 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tal 1 ahassee, Florida 32301 Mr. Weldon B. Lewis, County Administrator St. Lucie County 2300 Virginia Avenue, Room 104 Fort Pierce, Florida 33450 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Mr. Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.

Tallahassee, Florida 32399-0700 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, Georgia 30323 Mr. J.

H. Goldberg Executive Vice President Florida Power and Light Company P.O.

Box 14000 Juno Beach, Florida 33408-0420

Florida Power and Light Company

,Turkey Point Plant CC Harold F. Reis, Esquire Newman and Holtzinger, P.C.

1615 L Street, N.W.

Washington, DC 20036 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tal 1ahassee, F lorida 32304 John T. Butler, Esquire

Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Mr. K. N. Harris, Vice President Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102 County Manager of Metropolitan Dade County 111 NW 1st Street, 29th Floor Miami, Florida 33128 Senior Resident Inspector Turkey Point Nuclear Generating Station U.S. Nuclear Regulatory Commission Post Office Box 57-1185 Miami, Florida 33257-1185 Mr. Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabi litative Services 1317 Winewood Blvd.

Tallahassee, Florida 32399-0700 Intergovernmental Coordination and Review Office of Planning 5 Budget Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Flori da 32301 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W. Suite 2900 Atlanta, Georgia 30323 Attorney General Department of Legal Affairs The Capitol Ta 1 lahassee, Florida 32304 Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102 Mr. J.

H. Goldberg Execu tive Vice Pres ident Florida Power and Light Company P.O.

Box 14000

. Juno Beach, Florida 33408-0420

ENCLOSURE 1

NRC/FPL MEETING AGENDA FPL'S RESPONSE TO GENERIC LETTER 88-20 6 DECEMBER 1989 OBJECTIVE:

INFORM NRC MANAGEMENT OF FPL'S PLANS AND PROGRESS TOWARD FULFILLING THE REQUESTS OF GENERIC LETTER 88-20. DISCUSS CHANGES TO COMMITTMENT RESULTING FROM MODELING EMERGENCY POW'ER SYSTEM UPGRADE (FOUR VS. TWO DIESEL CONFIGURATION).

0 PLAN TO ADDRESS GL 88-20 FOR TURKEY POINT AND ST. LUCIE Scope and Schedule of Turkey Point PRA Scope and Schedule of St, Lucle PRA Project Organization 0

PROGRESS ON TURKEY POINT PRA Tasks Started, Progress to Date Upcoming Tasks Independent Review Plan Analysis of Emergency Power System Upgrade 0

GENERAL DISCUSSION ITEMS OF INTEREST TO NRC

TURKEYPOINT INDIVIDUALPLANT EXAIVIINATION-SCOPE 0

LEVEL 1 PRA + LIMITEDSCOPE LEVEL2 0

IMPORTANTOR UNIQUE FEATURES

- Shared Systems:

Increased Modeling Complexity Reporting of Plant versus Unit Risk

- Important Non-Safety Related Systems to be Included (where appropriate):

Standby Steam Generator Feedwater Pumps (Backup to AuxiliaryFeedwater)

Blackstart Diesel Generators - Tle to Safety Buses through C-Bus

- Turkey Point Design/Procedures are a "MovingTarget."

(Approach to Emergency Power System Upgrade Discussed Later) 0 EXTERNALEVENTS TO BE INCLUDED:

- Internal Flooding

- Fires

- Hurricanes (High Winds and External Flooding)

TURKEYPOINT PLANT PROBABILISTIC RISK ASSESSMENT SCHEDULE 7/1/89 10/1/89 1/1/90 4/1/90 7/1/90 10/1/90 1/1/91 4/1/91 7/1/91 START~ PROJECT PlAN (COMPIETE)

II A

ORIENTATION COMPLETE)

I I

21 MAY 1 ~ JIL 21 AUD DATAANALYSIS 1S SEP HUMANREIJASIUTYANALYSIS 11 JUL IIIIII RECOVERY III III 2 APR OUANIIFICATlON 25 OCT 14 APR 2 OCT CONTAINMENTPERFORMANCEANALYSS 21 JUL 1S OCT INIERNALFLOODS, FIRE, HURISCANE IIII I

I SENSITIVITYt MODIFICATlONSEVALUATlON III I

I TECHNOLOGY TRANSPER AND REPORTIND 21 JAN Fl~ REPORT III I

POST PROJECT SEMINAR

ST. LUCIE INDIVIDUALPLANT EXAMINATION-SCOPE 0

LEVEL 1 PRA + LIMITEDSCOPE LEVEL2 0

IMPORTANTOR UNIQUE FEATURES

~- Two Units are "Almost" Identical, One Unit will be Modeled, then differences applied.

0 EXTERNALEVENTS TO BE INCLUDED:

- Internal Flooding

ST. LUCIE IPE SCHEDULE ACTIVITY PTN PRA PSL EFFORT o DETAILED PLANNING AND BUDGET 89 90 91 92 93 94 o PROCUREMENT OF SERVICES o PSLANALYSIS

~

~

TURKEYPOINT PRA-PROJECT ORGANIZATION RELATIVE PARTICIPATION:

FPL NUCLEAR ENGINEERING

>507.

BECHTEL FPL EXPERIENCE MATRIX RELIABILITY EXPERIENCE

& RISK ASSESSMENT GROUP MEMBER J, O'EILL(Supervisor)

C. GUEY D. JAMES T. GILMORE B. VINCENT M. MORAWSKI X

X X

X X

X X

X INFORMATION& OTHER SUPPORT o Plant Operations o

Plant Maintenance o

Plant Technical (System Engineers) o Plant Training/Simulator o

Nuclear Engineering (Discipline Engineers) o Fuel Resources

TURKEY POINT PRA PROGRESS 0

ACCIDENT SEQUENCE ANALYSIS (TASK 1)

- Initiating Event Identification

- Initiating Event Grouping

- System Initiators (FMEA)

- Single vs. Dual Unit Initiators 0

SYSTEM ANALYSIS (TASK 2)

- Systems Identified

- System Description Notebooks 0

DATAANALYSIS (TASK 3)

- Generic Data File Completed, under Review 0

PROCEDURES BEING DEVELOPED FOR OTHER TASKS 0

CONTROLLED LIBRARYCREATED AND OPERATING 0

PRA HARDWARE/SOFTWARE DELIVERED

~ A

PTN PRA INDEPENDENT REVIEW PLAN GL 88-20 INTENT 0

Independent In-House Review to Ensure Accuracy and Adequacy of IPE Process and Results 0

Review by UtilityParty not directly involved in Producing the IPE FPL APPROACH 0

PROJECT TEAM REVIEWS (Not Independent) 0 TASK REVIEWS

- Use FPL Organizations most familiar with Particular Aspect of Analysis (See Matrix).

0 OVERALLREVIEW

- Organizations with "Big Picture" Perspective of Turkey Point

~ Willdo Overview of PRA and Results

- Current Candidates:

-Design Basis Reconstitution Team

-Safety Engineering Group (SEG)

- Outside Consultant to Review PRA Methods & Practices

PTN PRA INDEPENDENT REVIEW PLAN DETAILEDREVIEW PLAN TASK REVIEWER(S)

P@x+

~Q ~O REVIEW 0

+

4 8

0

+

SCHEDULE

1. ACCIDENTSEQUENCE ANALYSIS
2. SYSTEMS ANALYSIS
3. DATAANALYSIS
4. HUMANRELIABIUTYANALYSIS
5. QUANTIRCATION/INTEGRAITON
6. RECOVERY
7. CONTAINMENTPERFORMANCE ANALYSIS
8. INTERNALFLOOD ANALYSIS
9. SENSITIVITY&MODIFICATIONS
3. FIRE ANALYSIS
4. HURRICANEANALYSIS 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 12/89-7/90 3/90- 9/90 3/90- 7/90 3/90- 8/90 11/90- 1/91 11/90- 1/91 0

3/eo-1o/eo 8/90- 11/90 12/90 - 9/91 8/90- 11/90 8/90 - 11/90 INTEGRATED REVIEW PLAN

1. DESIGN BASIS RECONSTITUTION TEAM OR SEG TO REVIEW OVERALL REPORT (START:

12/90 END:

6/91)

2. CONTRACT CONSULTANTTO REVIEW PRA TECHNIQUES, METHODS, ASSUMPTIONS AT MILESTONES: COMPLETION OF TASKS 1, 2, 3, 4, 6, 7, 14

TURKEY POINT PRA - 2 vs 4 DIESELS?

o PRA COMPLETION SCHEDULE SET IN MID '89

- PRA To Be Finished by June, 1991 o

REVIEW DONE OF UPCOMING/PROPOSED MODIFICATIONS

- Would MOD Impact PRA?

- What is MOD's Implementation Schedule?

o MODIFICATIONSSCREENED:

- To Be Included In Current PRA Schedule

- To Be Included In Update of PRA o

EMERGENCY POWER SYSTEMS (EPS) UPGRADE InitiallyIncluded In Latter (Update) Category o

DECISION REVISED (NOVEMBER, 1989) TO PERFORM INITIALPRA USING EMERGENCY POWER SYSTEM ENHANCEMENT 10

EPS IMPACTON TURKEYPOINT PRA SCHEDULE OPTIONS CURRENT PLAN (2 DIESELS) 89 1990 DEVELOP PRA (2 EDG'S)

IN-HOUSE REVIEW 1991 M

D'VA REPORT(

SUBMIT UPDATE PR E

1992 1993 PDATE F R EP P

RADE THER MODIFICATIONS ST. LUCIE PRA DEVELOPMENT REVISION 1 (4 DIESELS)

DEVELOP PRA (4 EDG'S)

IN HOUSE REVIEW U

E

,'ARCH, '90 REPORT JUNE, '91 (NOT CERTIRED, PREUMINARY AVAILABLE LIMITED)OUIRERMEASURES)

UPDATE FOR EPS UPGRADE, OTHER MOD'S

+ SUBMITCERTIFIED REPORT, WITH COUNTERMEASURES ST. LUCIE PRA DEVELOPMENT EPS UPGRADE D

I REVISIONS EP P

BADE

- 9 MONTHS AFTER l UNITS RESTART CERTIFICATION: REVISIONS OF DRAWINGS, PROCEDURES AND OTHER PRA INPUT DOCUMENTS IN EFFECT ATTHE END OF THE EPS UPGRADE OUTAGE WILLBE USED. SOME INFORMATION NOT YET 'AS-BUILDS'ROMTHE EPS UPGRADE WILLBE TAKEN FROM CHANGE DOCUMENTS (i.e. PLANTCHANGE/MODIFICATIONPACKAGES).

11

EPS UPGRADE IMPACTON PTN PRA TASK IMPACT

1. ACCIDENTSEQUENCE ANALYSIS 0 FESD ON LOSS OF OFFSITE POWER-MODIFICATION 0 INITIATINGEVENTS-REVIEW LIST, GROUPING 0 EVENTTREES-MINOR 0 SYSTEM INITIATORS-MAYCHANGE (FUTURE)
2. SYSTEM ANALYSIS 0 COMPLETELYDIFFERENT EPS SD NOTEBOOK &

FAULTTREE (AC & DC) - LEVELOF DETAIL 0 OTHER SYSTEMS NEED TO BE CAREFUL OF POWER SUPPUES (EQUIPMENT & CONTROLS) 0 PROCEDURES (OP, MP, ONOP, EOP) NOTAVAILABLE-NEED ASSUMPTIONS UNTILFINAUZED (PSL SIMILAR')

3. DATAANALYSIS 0 MAINTENANCEUNAVAILABIUlY

- NO DATAFOR NEW DIESELS, NEED ASSUMPTIONS 0 TECH SPECS - ASSUMPTIONS ON ALLOWABLE OUTAGES, TESTING FREQUENCIES

4. HUMANRELIABILITYANALYSIS 0 ASSUMPTIONS DUE TO LACKOF PROCEDURES, SIMULATORDATA
5. QUANTIFICATION 0 CUTSET INACCURACIES DUE TO ASSUMPTIONS

- MOST IMPORTANTVULNERABILITIES 12

~ f P

EPS UPGRADE IMPACTON PTN PRA TASK IMPACT

6. RECOVERY ANALYSIS 0 ASSUMPTIONS ON RECOVERY ACTIONTIMING, POSSIBILIlY.
7. CONTAINMENTPERFORMANCE ANALYSIS O SIMIIARTOTASK182
8. INTERNALFLOOD 0 ASSUMPTIONS AS TO LOCATIONS OF SOME EQUIPMENT, CONDUIT, RACEWAYS 6 CABLES.
9. SENSITIVITY6 MODIFICATIONS EVALUATIONS 0 POSIjjVE: 4 DIESEL CONFIG NOT ONE OF MODS TO BE EVALUATED
13. FIRE ANALYSIS 0 SIMIIARTOTASK8
14. HURRICANEANALYSIS o SIMILAR TO TASKS

Attendance List for PRA Meeting on Turkey Point and St. Lucie Held December 6, 1989 Enclosure 2

NAME G.

E. Edison Herb Berkow Jan Norris Dave Chancy John Hosmen John O'eill A. El-Bassioni R. Barrett Steve Hoffman Mark Dryden Mike Schoppman Stephen M. guennoz J.E.

Cross Don Grandage Lamar McLaughlin ORGANIZATION NRC NRC NRC FPL FPL FPL NRC NRR/RAB NRC FPL FPL/Bethesda FPL FPL FPL FPL