MONTHYEARML17354B1231998-09-30030 September 1998 Summary of 980914 Meeting with Licensee at Turkey Point Plant in Florida City,Fl to Discuss with Licensee Requests for Exemptions from Technical Requirements of App R to 10CFR50 for Certain Outdoor Fire Zones & Turbine Structure ML17229A3801997-06-0909 June 1997 Summary of 970519 SALP Meeting W/Util Re Performance During Past SALP Cycle.List of Attendees & Copy of Handout Encl ML17229A2921997-03-25025 March 1997 Status Meeting ML17229A2701997-03-25025 March 1997 Summary of 970304 Meeting W/Florida Power & Light Co to Discuss Overall Status of Corrective Actions at Plant & Potential Slippage of Corrective Action Schedule from Mar 1998 to 1999 ML17229A1721996-12-20020 December 1996 Summary of 961219 Meeting W/Fpl in Rockville,Md Re Status & Schedule of Current & Upcoming Licensing Issues Concerning St Lucie Plants ML20136A8611996-11-27027 November 1996 Partially Withheld Summary Meeting W/Florida Power & Light Held on 961121 Re General Update on FPL Nuclear Plants ML18065B0401996-11-0505 November 1996 Summary of 961016 Meeting W/Utils in Rockville,Md Re 10CFR50.46 Large Break loss-of-coolant Accident Evaluation Model Error & Changes.W/List of Attendees & Handouts ML20134B8261996-07-23023 July 1996 Summary of 960422 Meeting W/Representative of Util Re Steam Generator Tube Integrity Program at Plant ML17228B5611996-07-16016 July 1996 Summarizes 960703 Meeting W/Fpl in Rockville,Md Re SG Insp, Repair & Operating Issues at Facility.W/List of Attendees & Handouts ML17353A6451996-04-17017 April 1996 Summary of 960404 Meeting W/Util in Rockville,Md to Discuss Thermal Uprate Submittal ML17352A9461994-12-0808 December 1994 Summary of 941129 Meeting W/Util in Rockville,Md Re NRC Request for Addl Info Issued on 941012 Following Review of Util 940615 Exemption Request Re Thermo-Lag Fire Barriers. Attendees Listed in Encl 1 ML17309A5481994-06-21021 June 1994 Summary of 940519 Meeting W/B&W in Rockville,Md Re Reactor Vessel Integrity.Meeting Attendees Listed in Encl 1 ML17352A5571994-04-19019 April 1994 Summary of 940414 Meeting W/Util in Rockville,Md Re Approach to Resolving Proposed Resolution of Thermo-lag Issue for Plants.List of Attendees Encl ML20137R9731994-01-0606 January 1994 Trip Rept of 940105-06 Visit to St Lucie Re Pre SALP ML20137R9781993-11-24024 November 1993 Trip Rept of 931115-16 Visit to St Lucie Nuclear Plant Re pre-SALP & Inspector Accompaniment ML20058M5891993-09-27027 September 1993 Summary of Operating Reactors Events Meeting 93-36 on 930922 ML17352A1911993-07-28028 July 1993 Summary of 930720 Meeting W/Util in Rockville,Md Re Proposed Resolution of Three Programmatic Issues Re GL 87-02 Noted During 930406 Meeting.List of Attendees Encl ML17352A0901993-06-29029 June 1993 Summary of 930623 Meeting W/Util Representatives in Rockville,Md Re Eliminating Black Start Diesels & Discussed Proposed Plant Mod & Licensing Bases for Affected Equipment ML20138E1261993-06-0404 June 1993 Summary of 930602 Meeting W/Util Re Merits of Biometric Access Control Sys That Util Desires to Use at Plants.List of Attendees & Meeting Handouts Encl ML20138E0781993-04-12012 April 1993 Summary of 930406 Meeting W/Util in Rockville,Md Re Three Issues Involving Seismic Qualification of Electrical & Mechanical Equipment at Plant.List of Attendees Encl ML17349A5311992-11-17017 November 1992 Summary of 921116 Meeting W/Util in Florida City,Fl Re Issues Relating to Restart of Turkey Point Unit 3 Following Hurricane Andrew & Cycle 13 Refueling Outage.Prior to Achieving Criticality,Util Will Inform NRC of Restart ML17349A4081992-10-14014 October 1992 Summary of 920922 Meeting W/Util in Florida City,Fl Re Interim Fire Protection Configuration Chimney Evaluation & Restart Plan.List of Attendees & Viewgraphs Encl ML17227A6181992-10-0707 October 1992 Summary of 920924 Meeting W/Util in Rockville,Md Re Need for Increasing Steam Generator Tube Plugging Limit for Facility. List of Attendees & Meeting Agenda Encl ML17349A3101992-07-21021 July 1992 Summary of 920707 Meeting W/Util in Rockville,Md Re Current Status & Plans for Plants.Handout Encl ML17349A2441992-05-29029 May 1992 Summary of 920520 Meeting W/Util in Juno Beach,Fl Re Technical & Mgt/Administrative Issues of Common Interest to Facilities.Agenda,Attendance List & Viewgraphs Encl ML17348B4711992-04-22022 April 1992 Summary of 920421 Meeting W/Util in Rockville,Md Re Status of Active Licensing Actions ML17348B4601992-04-0909 April 1992 Summary of 920401 Meeting W/Licensee in Rockville,Md to Discuss Several Licensing Issues Re Plants,Including Licensing Actions Associated W/Seismic Qualification of Mechanical & Electrical Equipment ML17348B4391992-03-18018 March 1992 Summary of 920227 Meeting W/Util in Rockville,Md Re Seismic Adequacy Verification of Equipment at St Lucie Plant,Unit 1 & Turkey Point Plant,Units 3 & 4.List of Attendees Encl ML17227A3231992-03-0303 March 1992 Summary of 920303 Meeting W/Util in Rockville,Md Re Current Licensing Issues ML17348B4011992-02-21021 February 1992 Summary of 920218 Meeting W/Util in Rockville,Md Re Status of All Active Licensing Issues ML17348B1281991-09-27027 September 1991 Summary of 910827 Meeting W/Fpl in Rockville,Md Re Individual Plant Exam.Viewgraphs Encl ML17223B2011991-05-28028 May 1991 Summary of 910521 Meeting W/Florida Power & Light Co Re Implementation of Station Blackout Rule at Facility ML17348A5791990-09-26026 September 1990 Summary of 900830 Meeting W/Util Re Clarification of Sections of NRC Safety Evaluation on Station Blackout Rule ML18057A3271990-07-0909 July 1990 Summary of 900625 Meeting w/C-E Regulatory Response Group in Rockville,Md Re Control Element Assembly Failure Mechanisms. List of Attendees & C-E Presentation Handout Encl ML17348A2101990-04-25025 April 1990 Summary of 900409-11 Meeting W/Util in Rockville,Md Re Emergency Power Sys Enhancement.Agenda & List of Attendees Encl ML17223A5351990-03-0202 March 1990 Summary of 900228 Meeting W/Util in Rockville,Md Re Safeguards Issues.Meeting Also Served as Quarterly Update Rept.List of Attendees Encl ML20011F6111990-02-28028 February 1990 Summary of Operating Reactors Events Meeting 90-05 on 900228 ML20006E7251990-02-12012 February 1990 Summary of Operating Reactors Events Meeting 90-03 on 900207.List of Attendees & Viewgraphs Encl ML15244A6011990-02-0202 February 1990 Summary of 900116-17 Interface Meeting W/Util at Site Re Licensing & Regulatory Issues.List of Attendees,Handouts & Agenda Encl ML20005E8421989-12-27027 December 1989 Summary of Operating Reactor Events Meeting 89-045 on 891227.List of Attendees & Significant Elements Discussed Encl ML20005D8121989-12-18018 December 1989 Summary of Operating Reactors Events Meeting 89-044 on 891213.List of Attendees & Viewgraphs Encl ML17347B4551989-12-11011 December 1989 Summary of 891206 Meeting W/Util in Rockville,Md Re Pra. Handouts Encl ML19332G0601989-12-0707 December 1989 Summary of Operating Reactors Events Meeting 89-43 on 891206.On 891128,high Cycle Fatigue Failure of Master Connecting Rod Assembly Occurred at South Texas,Unit 2.RHR Leakage Noted on 891201 at Braidwood,Unit 1 ML20005D6871989-12-0101 December 1989 Summary of Operating Reactors Events Meeting 89-042 on 891129.List of Attendees & Viewgraphs Encl ML19332D2821989-11-16016 November 1989 Summary of Operating Reactors Events Meeting 89-040 on 891115 ML19327C0541989-11-0202 November 1989 Summary of 891019 Meeting W/Sys Energy Resources,Inc, Louisiana Power & Light & Arkansas Power & Light Re Antitrust Concerns W/Consolidation of Operations Under Entergy Operations,Inc.List of Attendees & Viewgraphs Encl ML19325E8981989-11-0101 November 1989 Summary of Operating Reactors Events Meeting 89-38 on 891101 to Brief Senior Managers from Nrr,Aeod,Res,Region Ofc & Commission on Selected Events That Occurred Since 891018 Meeting.List of Attendees Encl ML19325E1761989-10-24024 October 1989 Summary of Operating Reactors Events Meeting 89-37 on 891018.List of Attendees & Events Briefing Encl ML19325D9211989-10-19019 October 1989 Summary of 891012 Meeting W/Sys Energy Resources,Inc, Arkansas Power & Light,Inc & Louisiana Power & Light,Inc at NRC Headquarters to Discuss Consolidation of Operations Under Entergy Operations,Inc.List of Attendees Encl ML20247R0161989-09-21021 September 1989 Summary of Operating Reactors Events Meeting 89-34 on 890920 to Brief Senior Managers & Regional Offices on Selected Events That Occured Since Last Meeting 1998-09-30
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML17354B1231998-09-30030 September 1998 Summary of 980914 Meeting with Licensee at Turkey Point Plant in Florida City,Fl to Discuss with Licensee Requests for Exemptions from Technical Requirements of App R to 10CFR50 for Certain Outdoor Fire Zones & Turbine Structure ML17229A3801997-06-0909 June 1997 Summary of 970519 SALP Meeting W/Util Re Performance During Past SALP Cycle.List of Attendees & Copy of Handout Encl ML17229A2921997-03-25025 March 1997 Status Meeting ML17229A2701997-03-25025 March 1997 Summary of 970304 Meeting W/Florida Power & Light Co to Discuss Overall Status of Corrective Actions at Plant & Potential Slippage of Corrective Action Schedule from Mar 1998 to 1999 ML17229A1721996-12-20020 December 1996 Summary of 961219 Meeting W/Fpl in Rockville,Md Re Status & Schedule of Current & Upcoming Licensing Issues Concerning St Lucie Plants ML20136A8611996-11-27027 November 1996 Partially Withheld Summary Meeting W/Florida Power & Light Held on 961121 Re General Update on FPL Nuclear Plants ML18065B0401996-11-0505 November 1996 Summary of 961016 Meeting W/Utils in Rockville,Md Re 10CFR50.46 Large Break loss-of-coolant Accident Evaluation Model Error & Changes.W/List of Attendees & Handouts ML20134B8261996-07-23023 July 1996 Summary of 960422 Meeting W/Representative of Util Re Steam Generator Tube Integrity Program at Plant ML17228B5611996-07-16016 July 1996 Summarizes 960703 Meeting W/Fpl in Rockville,Md Re SG Insp, Repair & Operating Issues at Facility.W/List of Attendees & Handouts ML17353A6451996-04-17017 April 1996 Summary of 960404 Meeting W/Util in Rockville,Md to Discuss Thermal Uprate Submittal ML17352A9461994-12-0808 December 1994 Summary of 941129 Meeting W/Util in Rockville,Md Re NRC Request for Addl Info Issued on 941012 Following Review of Util 940615 Exemption Request Re Thermo-Lag Fire Barriers. Attendees Listed in Encl 1 ML17309A5481994-06-21021 June 1994 Summary of 940519 Meeting W/B&W in Rockville,Md Re Reactor Vessel Integrity.Meeting Attendees Listed in Encl 1 ML17352A5571994-04-19019 April 1994 Summary of 940414 Meeting W/Util in Rockville,Md Re Approach to Resolving Proposed Resolution of Thermo-lag Issue for Plants.List of Attendees Encl ML20058M5891993-09-27027 September 1993 Summary of Operating Reactors Events Meeting 93-36 on 930922 ML17352A1911993-07-28028 July 1993 Summary of 930720 Meeting W/Util in Rockville,Md Re Proposed Resolution of Three Programmatic Issues Re GL 87-02 Noted During 930406 Meeting.List of Attendees Encl ML17352A0901993-06-29029 June 1993 Summary of 930623 Meeting W/Util Representatives in Rockville,Md Re Eliminating Black Start Diesels & Discussed Proposed Plant Mod & Licensing Bases for Affected Equipment ML20138E1261993-06-0404 June 1993 Summary of 930602 Meeting W/Util Re Merits of Biometric Access Control Sys That Util Desires to Use at Plants.List of Attendees & Meeting Handouts Encl ML20138E0781993-04-12012 April 1993 Summary of 930406 Meeting W/Util in Rockville,Md Re Three Issues Involving Seismic Qualification of Electrical & Mechanical Equipment at Plant.List of Attendees Encl ML17349A5311992-11-17017 November 1992 Summary of 921116 Meeting W/Util in Florida City,Fl Re Issues Relating to Restart of Turkey Point Unit 3 Following Hurricane Andrew & Cycle 13 Refueling Outage.Prior to Achieving Criticality,Util Will Inform NRC of Restart ML17349A4081992-10-14014 October 1992 Summary of 920922 Meeting W/Util in Florida City,Fl Re Interim Fire Protection Configuration Chimney Evaluation & Restart Plan.List of Attendees & Viewgraphs Encl ML17227A6181992-10-0707 October 1992 Summary of 920924 Meeting W/Util in Rockville,Md Re Need for Increasing Steam Generator Tube Plugging Limit for Facility. List of Attendees & Meeting Agenda Encl ML17349A3101992-07-21021 July 1992 Summary of 920707 Meeting W/Util in Rockville,Md Re Current Status & Plans for Plants.Handout Encl ML17349A2441992-05-29029 May 1992 Summary of 920520 Meeting W/Util in Juno Beach,Fl Re Technical & Mgt/Administrative Issues of Common Interest to Facilities.Agenda,Attendance List & Viewgraphs Encl ML17348B4711992-04-22022 April 1992 Summary of 920421 Meeting W/Util in Rockville,Md Re Status of Active Licensing Actions ML17348B4601992-04-0909 April 1992 Summary of 920401 Meeting W/Licensee in Rockville,Md to Discuss Several Licensing Issues Re Plants,Including Licensing Actions Associated W/Seismic Qualification of Mechanical & Electrical Equipment ML17348B4391992-03-18018 March 1992 Summary of 920227 Meeting W/Util in Rockville,Md Re Seismic Adequacy Verification of Equipment at St Lucie Plant,Unit 1 & Turkey Point Plant,Units 3 & 4.List of Attendees Encl ML17227A3231992-03-0303 March 1992 Summary of 920303 Meeting W/Util in Rockville,Md Re Current Licensing Issues ML17348B4011992-02-21021 February 1992 Summary of 920218 Meeting W/Util in Rockville,Md Re Status of All Active Licensing Issues ML17348B1281991-09-27027 September 1991 Summary of 910827 Meeting W/Fpl in Rockville,Md Re Individual Plant Exam.Viewgraphs Encl ML17223B2011991-05-28028 May 1991 Summary of 910521 Meeting W/Florida Power & Light Co Re Implementation of Station Blackout Rule at Facility ML17348A5791990-09-26026 September 1990 Summary of 900830 Meeting W/Util Re Clarification of Sections of NRC Safety Evaluation on Station Blackout Rule ML18057A3271990-07-0909 July 1990 Summary of 900625 Meeting w/C-E Regulatory Response Group in Rockville,Md Re Control Element Assembly Failure Mechanisms. List of Attendees & C-E Presentation Handout Encl ML17348A2101990-04-25025 April 1990 Summary of 900409-11 Meeting W/Util in Rockville,Md Re Emergency Power Sys Enhancement.Agenda & List of Attendees Encl ML17223A5351990-03-0202 March 1990 Summary of 900228 Meeting W/Util in Rockville,Md Re Safeguards Issues.Meeting Also Served as Quarterly Update Rept.List of Attendees Encl ML20011F6111990-02-28028 February 1990 Summary of Operating Reactors Events Meeting 90-05 on 900228 ML20006E7251990-02-12012 February 1990 Summary of Operating Reactors Events Meeting 90-03 on 900207.List of Attendees & Viewgraphs Encl ML15244A6011990-02-0202 February 1990 Summary of 900116-17 Interface Meeting W/Util at Site Re Licensing & Regulatory Issues.List of Attendees,Handouts & Agenda Encl ML20005E8421989-12-27027 December 1989 Summary of Operating Reactor Events Meeting 89-045 on 891227.List of Attendees & Significant Elements Discussed Encl ML20005D8121989-12-18018 December 1989 Summary of Operating Reactors Events Meeting 89-044 on 891213.List of Attendees & Viewgraphs Encl ML17347B4551989-12-11011 December 1989 Summary of 891206 Meeting W/Util in Rockville,Md Re Pra. Handouts Encl ML19332G0601989-12-0707 December 1989 Summary of Operating Reactors Events Meeting 89-43 on 891206.On 891128,high Cycle Fatigue Failure of Master Connecting Rod Assembly Occurred at South Texas,Unit 2.RHR Leakage Noted on 891201 at Braidwood,Unit 1 ML20005D6871989-12-0101 December 1989 Summary of Operating Reactors Events Meeting 89-042 on 891129.List of Attendees & Viewgraphs Encl ML19332D2821989-11-16016 November 1989 Summary of Operating Reactors Events Meeting 89-040 on 891115 ML19327C0541989-11-0202 November 1989 Summary of 891019 Meeting W/Sys Energy Resources,Inc, Louisiana Power & Light & Arkansas Power & Light Re Antitrust Concerns W/Consolidation of Operations Under Entergy Operations,Inc.List of Attendees & Viewgraphs Encl ML19325E8981989-11-0101 November 1989 Summary of Operating Reactors Events Meeting 89-38 on 891101 to Brief Senior Managers from Nrr,Aeod,Res,Region Ofc & Commission on Selected Events That Occurred Since 891018 Meeting.List of Attendees Encl ML19325E1761989-10-24024 October 1989 Summary of Operating Reactors Events Meeting 89-37 on 891018.List of Attendees & Events Briefing Encl ML19325D9211989-10-19019 October 1989 Summary of 891012 Meeting W/Sys Energy Resources,Inc, Arkansas Power & Light,Inc & Louisiana Power & Light,Inc at NRC Headquarters to Discuss Consolidation of Operations Under Entergy Operations,Inc.List of Attendees Encl ML20247R0161989-09-21021 September 1989 Summary of Operating Reactors Events Meeting 89-34 on 890920 to Brief Senior Managers & Regional Offices on Selected Events That Occured Since Last Meeting ML17223A3261989-09-15015 September 1989 Summary of 890913 Meeting W/Util in Rockville,Md to Discuss Safeguards Issues at Plant.List of Attendees Encl ML20247E3641989-09-0606 September 1989 Summary of 890717 Meeting W/Numarc,B&W Owners Group & Representatives of Lead Plants Re Status of STS Amends & Outstanding Issues Associated W/Lead Plant STS Submittals 1998-09-30
[Table view] |
Text
Yj
~gR RECy (4
P
~4 0
++**+
1 UNITED STATES t
NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 December 11, 1989 Docket Nos. 50-250, 50-251 and 50-335, 50-389 LICENSEE: Florida Power E Light Co.
FACILITY: Turkey Point Units 384, and St. Lucie Units 1&2
SUBJECT:
SUMMARY
OF MEETING WITH FLORIDA POWER AND LIGHT COMPANY (FPL)
ON DECEMBER 6, 1989 REGARDING PROBABILISTIC RISK ASSESSMENT A meeting was held in Rockville, Maryland on December 6,
1989 to discuss FPL's plans for, and status of, their Probabilistic Risk Assessment (PRA) for Turkey Poirt Units 354 and St. Lucie Units 182.
FPL stated they would complete and submit a
PRA for Turkey Point by June 1991 and for St.
Lucie sometime in mid-1993 with the exact date to be determined later.
The St. Lucie PRA will be performed after the Turkey Point PRA is completed.
The Turkey Point PRA will be performed for the improved four-diesel generator design which will be operational upon restart from the dual unit outage scheduled for 1991.
FPL indicated that the June 1991 submittal for Turkey Point may not include certificaticn that it represents the as-built design if modifications associated with the addition of two diesels are not sufficiently complete.
If necessary, certification could follow a few months later.
FPL indicated their PRA would be a "best estimate/realistic" approach as opposed to a conservative or bounding type of analysis.
The NRC staff noted that it will be very iIIIportant to quantify uncertainties associated with assumptions, limitations in scope, modeling and data.
The staff commented that although the 1993 date for the submittal of the St.
Lucie PRA is beyond the date envisioned by Generic Letter 88-20, the benefit of the experience gained by FPL in first performing the Turkey Point PRA will offset the effect of the delay of the St. Lucie submittal.
FPL 's basis for the meeting discussions, which was handed out to participants at the meeting, is attached as Enclosure l.
t 89i215006i 89i2i,i.
,'PDR ADOCK..Q500025Q PDC loE
An attendance list for the meeting is provided as Enclosure 2.
Original Signed By Original Signed By Gordon E. Edison, Sr. Project Manager Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/enclosure:
See next page
,DISTRIBUTION:
'NRC 8
LPDRs PD22 Rdg Fi le JSniezek 12/G/18 HBerkow RButcher RII MSinkule RII GLainas 14/H/4 RCrlenjak, RII RBorchardt 17/G/21 SVargp SHoffman ACRS,(10)
GEdison DMiller Jan Norris, Sr. Project Manager Project Directorate II-2 Division of Reactors Projects - I/II Office of Nuclear Reactor Regulation F:
D I
'P 'PDI-
- L
- DI-WWWWO
~
NAME :
DATE:12/
/89
- GEdison:sl
- 12/I /89 WWWWW
/
- JN rri:HPe o
e
~ w
+ww
- 12/I( /89:12//JI /89 W
0 WWI W OFFICIAL RECORD COPY Document Name:
FPIIL
SUMMARY
OF MEETING
~
h I
~
V tf I
VV IIIV g V
JV V
I
~ '
IV
~
Il I ~
I I
v
~
V II
~
U k
I
~
I
~
~
V
Florida Power 5 Light Company St. Lucie Plant CC:
Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Senior Resident Inspector St. Lucie Plant U.S. Nuclear Regulatory Commission 7585 S.
Hwy A1A Jensen
- Beach, Flor ida 33457 State Planning
& Development Clearinghouse Office of P 1 arming 8 Budget Executive Office of the Governor The Capitol Building Tal lahassee, Florida 32301 Harold F. Reis, 'Esq.
Newman 5 Holtzinger 1615 L Street, N.W.
Washington, DC 20036 John T. Butler, Esq.
- Steel, Hector and Davis 4000 Southeast Financial Center
- Miami, F lorida 33131-2398 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tal 1 ahassee, Florida 32301 Mr. Weldon B. Lewis, County Administrator St. Lucie County 2300 Virginia Avenue, Room 104 Fort Pierce, Florida 33450 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Mr. Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.
Tallahassee, Florida 32399-0700 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, Georgia 30323 Mr. J.
H. Goldberg Executive Vice President Florida Power and Light Company P.O.
Box 14000 Juno Beach, Florida 33408-0420
Florida Power and Light Company
,Turkey Point Plant CC Harold F. Reis, Esquire Newman and Holtzinger, P.C.
1615 L Street, N.W.
Washington, DC 20036 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tal 1ahassee, F lorida 32304 John T. Butler, Esquire
- Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Mr. K. N. Harris, Vice President Turkey Point Nuclear Plant Florida Power and Light Company P.O.
Box 029100 Miami, Florida 33102 County Manager of Metropolitan Dade County 111 NW 1st Street, 29th Floor Miami, Florida 33128 Senior Resident Inspector Turkey Point Nuclear Generating Station U.S. Nuclear Regulatory Commission Post Office Box 57-1185 Miami, Florida 33257-1185 Mr. Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabi litative Services 1317 Winewood Blvd.
Tallahassee, Florida 32399-0700 Intergovernmental Coordination and Review Office of Planning 5 Budget Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Flori da 32301 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W. Suite 2900 Atlanta, Georgia 30323 Attorney General Department of Legal Affairs The Capitol Ta 1 lahassee, Florida 32304 Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company P.O.
Box 029100 Miami, Florida 33102 Mr. J.
H. Goldberg Execu tive Vice Pres ident Florida Power and Light Company P.O.
Box 14000
. Juno Beach, Florida 33408-0420
ENCLOSURE 1
NRC/FPL MEETING AGENDA FPL'S RESPONSE TO GENERIC LETTER 88-20 6 DECEMBER 1989 OBJECTIVE:
INFORM NRC MANAGEMENT OF FPL'S PLANS AND PROGRESS TOWARD FULFILLING THE REQUESTS OF GENERIC LETTER 88-20. DISCUSS CHANGES TO COMMITTMENT RESULTING FROM MODELING EMERGENCY POW'ER SYSTEM UPGRADE (FOUR VS. TWO DIESEL CONFIGURATION).
0 PLAN TO ADDRESS GL 88-20 FOR TURKEY POINT AND ST. LUCIE Scope and Schedule of Turkey Point PRA Scope and Schedule of St, Lucle PRA Project Organization 0
PROGRESS ON TURKEY POINT PRA Tasks Started, Progress to Date Upcoming Tasks Independent Review Plan Analysis of Emergency Power System Upgrade 0
GENERAL DISCUSSION ITEMS OF INTEREST TO NRC
TURKEYPOINT INDIVIDUALPLANT EXAIVIINATION-SCOPE 0
LEVEL 1 PRA + LIMITEDSCOPE LEVEL2 0
IMPORTANTOR UNIQUE FEATURES
- Shared Systems:
Increased Modeling Complexity Reporting of Plant versus Unit Risk
- Important Non-Safety Related Systems to be Included (where appropriate):
Standby Steam Generator Feedwater Pumps (Backup to AuxiliaryFeedwater)
Blackstart Diesel Generators - Tle to Safety Buses through C-Bus
- Turkey Point Design/Procedures are a "MovingTarget."
(Approach to Emergency Power System Upgrade Discussed Later) 0 EXTERNALEVENTS TO BE INCLUDED:
- Internal Flooding
- Fires
- Hurricanes (High Winds and External Flooding)
TURKEYPOINT PLANT PROBABILISTIC RISK ASSESSMENT SCHEDULE 7/1/89 10/1/89 1/1/90 4/1/90 7/1/90 10/1/90 1/1/91 4/1/91 7/1/91 START~ PROJECT PlAN (COMPIETE)
II A
ORIENTATION COMPLETE)
I I
21 MAY 1 ~ JIL 21 AUD DATAANALYSIS 1S SEP HUMANREIJASIUTYANALYSIS 11 JUL IIIIII RECOVERY III III 2 APR OUANIIFICATlON 25 OCT 14 APR 2 OCT CONTAINMENTPERFORMANCEANALYSS 21 JUL 1S OCT INIERNALFLOODS, FIRE, HURISCANE IIII I
I SENSITIVITYt MODIFICATlONSEVALUATlON III I
I TECHNOLOGY TRANSPER AND REPORTIND 21 JAN Fl~ REPORT III I
POST PROJECT SEMINAR
ST. LUCIE INDIVIDUALPLANT EXAMINATION-SCOPE 0
LEVEL 1 PRA + LIMITEDSCOPE LEVEL2 0
IMPORTANTOR UNIQUE FEATURES
~- Two Units are "Almost" Identical, One Unit will be Modeled, then differences applied.
0 EXTERNALEVENTS TO BE INCLUDED:
- Internal Flooding
ST. LUCIE IPE SCHEDULE ACTIVITY PTN PRA PSL EFFORT o DETAILED PLANNING AND BUDGET 89 90 91 92 93 94 o PROCUREMENT OF SERVICES o PSLANALYSIS
~
~
TURKEYPOINT PRA-PROJECT ORGANIZATION RELATIVE PARTICIPATION:
FPL NUCLEAR ENGINEERING
>507.
BECHTEL FPL EXPERIENCE MATRIX RELIABILITY EXPERIENCE
& RISK ASSESSMENT GROUP MEMBER J, O'EILL(Supervisor)
C. GUEY D. JAMES T. GILMORE B. VINCENT M. MORAWSKI X
X X
X X
X X
X INFORMATION& OTHER SUPPORT o Plant Operations o
Plant Maintenance o
Plant Technical (System Engineers) o Plant Training/Simulator o
Nuclear Engineering (Discipline Engineers) o Fuel Resources
TURKEY POINT PRA PROGRESS 0
ACCIDENT SEQUENCE ANALYSIS (TASK 1)
- Initiating Event Identification
- Initiating Event Grouping
- System Initiators (FMEA)
- Single vs. Dual Unit Initiators 0
SYSTEM ANALYSIS (TASK 2)
- Systems Identified
- System Description Notebooks 0
DATAANALYSIS (TASK 3)
- Generic Data File Completed, under Review 0
PROCEDURES BEING DEVELOPED FOR OTHER TASKS 0
CONTROLLED LIBRARYCREATED AND OPERATING 0
PRA HARDWARE/SOFTWARE DELIVERED
~ A
PTN PRA INDEPENDENT REVIEW PLAN GL 88-20 INTENT 0
Independent In-House Review to Ensure Accuracy and Adequacy of IPE Process and Results 0
Review by UtilityParty not directly involved in Producing the IPE FPL APPROACH 0
PROJECT TEAM REVIEWS (Not Independent) 0 TASK REVIEWS
- Use FPL Organizations most familiar with Particular Aspect of Analysis (See Matrix).
0 OVERALLREVIEW
- Organizations with "Big Picture" Perspective of Turkey Point
~ Willdo Overview of PRA and Results
- Current Candidates:
-Design Basis Reconstitution Team
-Safety Engineering Group (SEG)
- Outside Consultant to Review PRA Methods & Practices
PTN PRA INDEPENDENT REVIEW PLAN DETAILEDREVIEW PLAN TASK REVIEWER(S)
P@x+
~Q ~O REVIEW 0
+
4 8
0
+
SCHEDULE
- 1. ACCIDENTSEQUENCE ANALYSIS
- 2. SYSTEMS ANALYSIS
- 3. DATAANALYSIS
- 4. HUMANRELIABIUTYANALYSIS
- 5. QUANTIRCATION/INTEGRAITON
- 6. RECOVERY
- 7. CONTAINMENTPERFORMANCE ANALYSIS
- 8. INTERNALFLOOD ANALYSIS
- 9. SENSITIVITY&MODIFICATIONS
- 3. FIRE ANALYSIS
- 4. HURRICANEANALYSIS 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 12/89-7/90 3/90- 9/90 3/90- 7/90 3/90- 8/90 11/90- 1/91 11/90- 1/91 0
3/eo-1o/eo 8/90- 11/90 12/90 - 9/91 8/90- 11/90 8/90 - 11/90 INTEGRATED REVIEW PLAN
- 1. DESIGN BASIS RECONSTITUTION TEAM OR SEG TO REVIEW OVERALL REPORT (START:
12/90 END:
6/91)
- 2. CONTRACT CONSULTANTTO REVIEW PRA TECHNIQUES, METHODS, ASSUMPTIONS AT MILESTONES: COMPLETION OF TASKS 1, 2, 3, 4, 6, 7, 14
TURKEY POINT PRA - 2 vs 4 DIESELS?
o PRA COMPLETION SCHEDULE SET IN MID '89
- PRA To Be Finished by June, 1991 o
REVIEW DONE OF UPCOMING/PROPOSED MODIFICATIONS
- Would MOD Impact PRA?
- What is MOD's Implementation Schedule?
o MODIFICATIONSSCREENED:
- To Be Included In Current PRA Schedule
- To Be Included In Update of PRA o
EMERGENCY POWER SYSTEMS (EPS) UPGRADE InitiallyIncluded In Latter (Update) Category o
DECISION REVISED (NOVEMBER, 1989) TO PERFORM INITIALPRA USING EMERGENCY POWER SYSTEM ENHANCEMENT 10
EPS IMPACTON TURKEYPOINT PRA SCHEDULE OPTIONS CURRENT PLAN (2 DIESELS) 89 1990 DEVELOP PRA (2 EDG'S)
IN-HOUSE REVIEW 1991 M
D'VA REPORT(
SUBMIT UPDATE PR E
1992 1993 PDATE F R EP P
RADE THER MODIFICATIONS ST. LUCIE PRA DEVELOPMENT REVISION 1 (4 DIESELS)
DEVELOP PRA (4 EDG'S)
IN HOUSE REVIEW U
E
,'ARCH, '90 REPORT JUNE, '91 (NOT CERTIRED, PREUMINARY AVAILABLE LIMITED)OUIRERMEASURES)
UPDATE FOR EPS UPGRADE, OTHER MOD'S
+ SUBMITCERTIFIED REPORT, WITH COUNTERMEASURES ST. LUCIE PRA DEVELOPMENT EPS UPGRADE D
I REVISIONS EP P
BADE
- 9 MONTHS AFTER l UNITS RESTART CERTIFICATION: REVISIONS OF DRAWINGS, PROCEDURES AND OTHER PRA INPUT DOCUMENTS IN EFFECT ATTHE END OF THE EPS UPGRADE OUTAGE WILLBE USED. SOME INFORMATION NOT YET 'AS-BUILDS'ROMTHE EPS UPGRADE WILLBE TAKEN FROM CHANGE DOCUMENTS (i.e. PLANTCHANGE/MODIFICATIONPACKAGES).
11
EPS UPGRADE IMPACTON PTN PRA TASK IMPACT
- 1. ACCIDENTSEQUENCE ANALYSIS 0 FESD ON LOSS OF OFFSITE POWER-MODIFICATION 0 INITIATINGEVENTS-REVIEW LIST, GROUPING 0 EVENTTREES-MINOR 0 SYSTEM INITIATORS-MAYCHANGE (FUTURE)
- 2. SYSTEM ANALYSIS 0 COMPLETELYDIFFERENT EPS SD NOTEBOOK &
FAULTTREE (AC & DC) - LEVELOF DETAIL 0 OTHER SYSTEMS NEED TO BE CAREFUL OF POWER SUPPUES (EQUIPMENT & CONTROLS) 0 PROCEDURES (OP, MP, ONOP, EOP) NOTAVAILABLE-NEED ASSUMPTIONS UNTILFINAUZED (PSL SIMILAR')
- 3. DATAANALYSIS 0 MAINTENANCEUNAVAILABIUlY
- NO DATAFOR NEW DIESELS, NEED ASSUMPTIONS 0 TECH SPECS - ASSUMPTIONS ON ALLOWABLE OUTAGES, TESTING FREQUENCIES
- 4. HUMANRELIABILITYANALYSIS 0 ASSUMPTIONS DUE TO LACKOF PROCEDURES, SIMULATORDATA
- 5. QUANTIFICATION 0 CUTSET INACCURACIES DUE TO ASSUMPTIONS
- MOST IMPORTANTVULNERABILITIES 12
~ f P
EPS UPGRADE IMPACTON PTN PRA TASK IMPACT
- 6. RECOVERY ANALYSIS 0 ASSUMPTIONS ON RECOVERY ACTIONTIMING, POSSIBILIlY.
- 7. CONTAINMENTPERFORMANCE ANALYSIS O SIMIIARTOTASK182
- 8. INTERNALFLOOD 0 ASSUMPTIONS AS TO LOCATIONS OF SOME EQUIPMENT, CONDUIT, RACEWAYS 6 CABLES.
- 9. SENSITIVITY6 MODIFICATIONS EVALUATIONS 0 POSIjjVE: 4 DIESEL CONFIG NOT ONE OF MODS TO BE EVALUATED
- 13. FIRE ANALYSIS 0 SIMIIARTOTASK8
- 14. HURRICANEANALYSIS o SIMILAR TO TASKS
Attendance List for PRA Meeting on Turkey Point and St. Lucie Held December 6, 1989 Enclosure 2
NAME G.
E. Edison Herb Berkow Jan Norris Dave Chancy John Hosmen John O'eill A. El-Bassioni R. Barrett Steve Hoffman Mark Dryden Mike Schoppman Stephen M. guennoz J.E.
Cross Don Grandage Lamar McLaughlin ORGANIZATION NRC NRC NRC FPL FPL FPL NRC NRR/RAB NRC FPL FPL/Bethesda FPL FPL FPL FPL