ML17347B446

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-250/89-45 & 50-251/89-45 on 890930-1027 & Notice of Violation
ML17347B446
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/21/1989
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Goldberg J
FLORIDA POWER & LIGHT CO.
Shared Package
ML17347B447 List:
References
NUDOCS 8912110035
Download: ML17347B446 (8)


See also: IR 05000250/1989045

Text

zcczxzm TED

DlPJ'MQUTIDN

DzvoNSTRxZON

svrrzx

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8912110035

DOC.DATE: 89/11/21

NOTARIZED: NO

SCIL:50-250 Turkey Po'int Plant, Unit 3, Florida Power

and Light C

50-251 Turkey Point Plant, Unit 4, Florida Power

and Light C

AUTH.NAME

AUTHOR AFFILIATION

REYES,L.A.

Region 2, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

GOLDBERG,J.H.

Florida Power

6 Light Co.

4

SUBJECT:

Forwards

Insp Repts

50-250/89-45

6 50-251/89-45

on

890930-1027

& notice of violation.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Yi lation Response

NOTES:

DOCKET

05000250

05000251

INTERNAL:

RECIPIENT

1D CODE/NAME

PD2-2

PD

AEOD

AEOD/TPAD

NRR SHANKMAN,S

NRR/DLPQ/LPEB10

NRR/DREP/PEPB9D

NRR/DRIS/DIR

NRR/PMAS/1LRB12

0

LZEB

MAN,J

REG

F LE

02

GH

FILE

01

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

EDISONiG

AEOD/DEIIB

DEDRO

NRR/DET/DIR 8H3

NRR/DOEA DIR 11

NRR/DREP/PRPB11

NRR/DST/DIR 8E2

NUDOCS-ABSTRACT

OGC/HDS2

RES

MORISSEAU,D

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

2

2

1

1

1

1

1

1

1

1

EXTERNAL: LPDR

NSIC

1

1

1

1

NRC

PDR

h

D

D

S

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

25

ENCL

25

OFFICIAL FILE COPY

NOV

R I 1%9

Docket Nos. 50-250,

50-251

License

Nos.

DPR-31,

DPR-41

Florida Power and Light Company

ATTN:

Hr. J.

H. Goldberg

Executive Vice President - Nuclear

P. 0.

Box 14000

Juno

Beach,

FL

33408-0420

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC INSPECTION

REPORT

NOS. 50-250/89-45

AND 251/89-45)

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

R.

C.

Butcher

on

September

30,

1989 - October

27,

1989.

The inspection

included

a review of activities authorized for your Turkey Point facility.

At

the

conclusion

of the

inspection,

the findings

were

discussed

with those

members of your staff identified in the enclosed

inspection report.

Areas

examined

during

the inspection

are identified in the report.

Within

these

areas,

the inspection

consisted

of selected

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation

of

activities in proqress.

The inspection

findings indicate that certain activities

appeared

to violate

NRC requirements.

The violation with pertinent references

and elemehts

to be

included in your response

is described

in the enclosed

Notice.

In accordance

with Section

2.790 of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosures

will be placed in the

NRC Public Document

Room.

The responses

directed

by this letter and its enclosures

are not subject to the

clearance

procedures

of the Office of Nanagement

and Budget as required

by the

Paperwork

Reduction Act of 1980,

PL 96-511.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

Original signed

by

8912110035

89'1121

PDR

ADOCK 05000250

8

PNU

Enclosures:

(See

page

2)

Luis A. Reyes,

Director

Division of Reactor Projects

QEo/

Florida

Power and Light Company

0

Enclosures:

1.

Notice of Violation

2.

Inspection

Report

cc w/encls:

K.

N. Harris, Vice President

Turkey Point Nuclear Plant

P. 0.

Box 029100

,Miami,

FL

33102

J.

E. Cross,

Plant Manager

Turkey Point Nuclear Plant

P. 0.

Box 029100

Miami,

FL

33102

L.

W. Bladow

Plant

gA Superintendent

Turkey Point Nuclear Plant

P. 0.

Box 029100

Miami,

FL

33102

E. Lyons, Acting Regulatory

and

Compliance Supervisor

Turkey Point Nuclear Plant

P. 0.

Box 029100

Miami,

FL

33102

Harol d F.

Rei s,

Esq.

Newman

and Holtzinger,

P.C.'615

L Street,

NW

Washington,

D.

C.

20036

John T. Butler, Esq.

Steel,

Hector and Davis

4000 Southeast

Financial

Center

Miami,

FL

33131-2398

Attorney General

Department of Legal Affairs

The Capitol

Tallahassee,

FL

332304

Jacob

Daniel

Nash

Office of Radiation Control

Department of Health

and

Rehabilitative Services

1317 Winewood Boulevard

Tallahssee,

FL

32399-0700

(cc w/encls cont'd - See

page

3)

Florida Power and Light Company

NOV 2

1 1989

(cc w/encls cont'd)

Jack

Shreve

Office of the Public Counsel

Room 4, Holland Building

Tallahassee,

FL

32304

Administrator

Department of Environmental

Regulation

Power

Plant Siting Section

State of Florida

Twin Towers

2600 Blair Stone

Road

Tallahassee,

FL

32301

Joaquin Avino

County Manager of Metropolitan

Dade County

ill NW 1st Street,

29th Floor

Miami,

FL

33128

Intergovernmental

Coordination

and

Review

Office of Planning

and Budget

Executive Office'f the Governor

The Capitol Building

Tallahassee,

FL

32301

State of Florida

bcc w/encls:

G.

E. Edison,

NRR

Document Control

Desk

NRC Resident

Inspector

U.S. Nuclear Regulatory

Commission

P. 0.

Box 57-1185

Miami,

FL

33257-1185

  • Concurrences

p--

PM dd

1 lf'89

RI

DRP

RC lenjak

11/

89

RII:DRP

MSrInkule

g'll/), /89

'