ML17347B155

From kanterella
Jump to navigation Jump to search
Forwards Turkey Point Plant Unit 4 Reactor Containment Bldg Integrated Leakage Rate Test Types A,B & C Periodic Test, Per 10CFR50,App J
ML17347B155
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 07/03/1989
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17347B156 List:
References
L-89-226, NUDOCS 8907110096
Download: ML17347B155 (4)


Text

REGULATORY INFORMATION DISTRIBUTION SYS'ZEM (RIDS)

ACCESSION NBR 8907110096 DOC.DATE: 89/07/03 NOTARIZED: NO DOCKET FACIL:50-250 ":turkey Point Plant~, Unit 3, Florida Power and Light C 05000250 .

50-251 Turkey Point Plant, Unit 4, Florida Power and Light C~ 05000251 AUTH. NAME OODY,C.O.

RECIP. NAME ),

AUTHOR AFFILIATION Florida Power,& 5'ight RECIPIENT <<AFFILIATION Co.,'-,;., ~;.":'~, R Document Control Branch (Document Control Desk)

SUBJECT:

Forwards "Reactor Containment Bldg Integrated Leakage Rate Test Types A,B", 6 C Periodic Test," per 10CFR50 App J. D DISTRIBUTION CODE: A017D COPIES RECEIVED:LTR ENCL SIZE: 8 TITLE, OR Submittal:

~

Append J Containment Leap 'I Rate Testing

,./,, 4 j III ~ ~ h NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME 'TTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 0 PD2-2 PD 5 5 EDISON,G 1 1 INTERNAL: NRR/DEST/PSB8D 1 1 NUDOCS-ABSTRACT

<<1 '0 OGC/HDS2 RE ILE 01 1 1 RES TELFORD,J ST 1 1 RES/DSIR/SAIB B'ES/DSR/RPSB 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 E,

D S

h D

NOXE K) ALL KIDS" R1KIPI1MS:

S PLEASE HEZip US XO REDUCE 1 LSTEf CXWXACZ 'IHE DOQ3KWZ CCÃGKL DESK, RXM P1-37 (EXT. 20079) To EZZMBMR KRR MME PEKOE DISTRIBUTION LISTS MR DOCUHEMIS YOU DOH~T NEEDf TOTAL NUMBER OF COPIES REQUIRED: LTTR 19 ENCL 17

e Ik II k

I, II ilk

P.O. Box14000, Juno Beach, FL 33408-0420 JULY. -3 ~NL9 L-89-226 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Reactor Containment Building Inte rated Leak Rate Test Enclosed please find the summary technical report of the Reactor Containment Building Integrated Leak Rate Test (ILRT) for Turkey Point Unit 4 as required by 10 CFR 50, Appendix Z.

Very truly yours, C. 0 W ody Acti Senior Vice President Nuclear COW/TCG/gp cc: Stewart Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Q/7 8907110096 S90703 Y PDR ADOCK 0500025$ PDC an FPL Group company

0 ~ 5 o p 4

,(