L-89-226, Forwards Turkey Point Plant Unit 4 Reactor Containment Bldg Integrated Leakage Rate Test Types A,B & C Periodic Test, Per 10CFR50,App J

From kanterella
(Redirected from L-89-226)
Jump to navigation Jump to search
Forwards Turkey Point Plant Unit 4 Reactor Containment Bldg Integrated Leakage Rate Test Types A,B & C Periodic Test, Per 10CFR50,App J
ML17347B155
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 07/03/1989
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17347B156 List:
References
L-89-226, NUDOCS 8907110096
Download: ML17347B155 (4)


Text

REGULATORY INFORMATION DISTRIBUTION SYS'ZEM (RIDS)

ACCESSION NBR 8907110096 DOC.DATE: 89/07/03 NOTARIZED: NO DOCKET FACIL:50-250 ":turkey Point Plant~, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C~

05000251 AUTH.NAME AUTHOR AFFILIATION OODY,C.O.

, Florida Power,& 5'ight Co.,'-,;.,

~;.":'~,

R RECIP. NAME ),

RECIPIENT <<AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards "Reactor Containment Bldg Integrated Leakage Rate Test Types A,B", 6 C Periodic Test," per 10CFR50 App J.

D DISTRIBUTION CODE: A017D COPIES RECEIVED:LTR ENCL SIZE:

8 TITLE, OR Submittal:

Append J Containment Leap Rate Testing j

~

III

~

~

'I

,./,, 4 h

NOTES RECIPIENT ID CODE/NAME PD2-2 LA EDISON,G INTERNAL: NRR/DEST/PSB8D RE ILE 01 ST B'ES/DSR/RPSB EXTERNAL: LPDR NSIC COPIES

'TTR ENCL 1

0 1

1 1

1

<<1

'0 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-2 PD NUDOCS-ABSTRACT OGC/HDS2 RES TELFORD,J RES/DSIR/SAIB NRC PDR COPIES LTTR ENCL 5

5 1

1 E,

D S

h NOXE K) ALL KIDS" R1KIPI1MS:

PLEASE HEZip US XO REDUCE 1 LSTEf CXWXACZ 'IHE DOQ3KWZ CCÃGKL DESK, RXM P1-37 (EXT. 20079)

To EZZMBMR KRR MME PEKOE DISTRIBUTION LISTS MR DOCUHEMIS YOU DOH~T NEEDf TOTAL NUMBER OF COPIES REQUIRED:

LTTR 19 ENCL 17 D

S

e Ik II k

I, ilk II

P.O. Box14000, Juno Beach, FL 33408-0420 JULY. - 3

~NL9 L-89-226 U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.

C.

20555 Gentlemen:

Re:

Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 Reactor Containment Building Inte rated Leak Rate Test Enclosed please find the summary technical report of the Reactor Containment Building Integrated Leak Rate Test (ILRT) for Turkey Point Unit 4 as required by 10 CFR 50, Appendix Z.

Very truly yours, C.

0 W ody Acti Senior Vice President Nuclear COW/TCG/gp cc:

Stewart Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Q/7 PDR ADOCK 0500025$ Y 8907110096 S90703 PDC an FPL Group company

0

~ 5 o

p 4

,(