ML17347B046
| ML17347B046 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 03/22/1989 |
| From: | Wilson B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Conway W FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17347B047 | List: |
| References | |
| NUDOCS 8904040006 | |
| Download: ML17347B046 (6) | |
See also: IR 05000250/1989006
Text
gCCKMRATED
DISTKBUHON
DEMONSTRATION
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8904040006
DOC.DATE: 89/03/22
NOTARIZED: NO
FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power
and Light C
50-251 Turkey Point Plant, Unit 4, Florida Power
and Light C
AUTH.NAME
AUTHOR AFFILIATION
ILSONgB.A.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
CONWAY,W.F.
Florida Power &'ight Co.
SUBJECT:
Forwards
Insp Repts
50-250/89-06
& 50-251/89-06
on 890128-
0224
DOCKET
05000250
05000251
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR i ENCL
=
I
SIZE: .+
I 7
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
ID CODE/NAME
PD2-2
INTERNAL: AEOD
DEDRO
NRR/DEST DIR
NRR/DLPQ/QAB 10
NRR/DREP/EPB
10
NRR/DRIS DIR 9A
NUDOCS-ABSTRACT
OGC/HDS2
RGN2
FILE
01
ERNAL: LPDR
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
EDISONIG
AEOD/DEIIB
NRR SHANKMAN,S
NRR/DLPQ/PEB
11
NRR/DOEA DIR 11
NRR/DREP/RPB
10
NRR/PMAS/ILRB12
OE LIEBERMANgJ
,NRC
COPIES
LTTR ENCL
1
1
1
1
1
1
2
1
1
1
1
1
R
I
D,
D
,
K) ALL "RIDS" RECIPIENIS:
0
PLEASE HELP US I0 REDUCE HASTE!
CONI'ACZ 'IHE DOCUMEÃ7 CORI'ROL DESK,
ROOM Pl-37
(EXT. 20079)
%0 ELDGKLTE YOUR K@K FBCH DI8TRIBUTIQN
LISTS FOR DOCUMENIS YOU DOHiT NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
23
ENCL
23
41AR
2 2 Igeg
Docket Nos. 50-250,
50-251
License
Nos.
Florida Power
and Light Company
ATTN:
Mr.
W.
F.
Conway
Senior Vice President-Nuclear
Nuclear Energy Department
P. 0.
Box 14000
Juno
Beach,
FL
33408
Gentlemen:
SUBJECT:
(NRC
INSPECTION
REPORT
NOS. 50-250/89-06
AND 50-251/89-06)
This refers
to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
R.
C. Butcher
on January
28,
1989 through
February
24,
1989.
The inspection
included
a review of activities authorized for your Turkey Point facility.
At
the
conclusion
of the
inspection,
the findings
were
discussed
with those
members of your staff identified in the enclosed
inspection report.
Areas
examined
during
the inspection
are identified in the report.
Within
these
areas,
the inspection
consisted
of selected
examinations
of procedures
and
representative
records,
interviews
with personnel,
and
observation
of
activities in progress.
The inspection
findings indicate that certain activities
appeared
to violate
NRC requirements.
The violation with pertinent references
and
elements
to be
included in your response
are described
in the enclosed
Notice.
In accordance
with Section
2.790 of the
NRC's
"Rules of Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and its enclosure
will be placed in the
NRC Public Document
Room.
The responses
directed
by this letter and its enclosures
are not subject to the
clearance
procedures
of the Office of Management
and Budget
as required
by the
Paperwork
Reduction Act of 1980,
PL 96-511.
Should you have
any questions
concerning this letter,
please
contact us.
Sincerely,
'Ot'i$'i<P.l 8!phd~ J 9'
8904040006
890322
ADOCK 05000250
G
PNU
Enclosures:
(See
page
2)
Bruce A. Wilson, Chief
Reactor Projects
Branch
2
Division of Reactor Projects
)gSIWETIAM OBIGIMEL
Power and Light Company
MAR 2 2
1989
Enclosures:'.
2.
'NRC Inspection
Report
cc w/encls:
J.
S.
Odom, Vice President
Turkey Point Nuclear Plant
J.
E. Cross,
Plant
Manager
Turkey Point Nuclear Plant
L.
W. Bladow, Plant
gA Superintendent
R.
D. Hart, Regulatory
and Compliance
'Supervisor
State of Florida
bcc w/encls:
G.
E. Edison, Project Manager,
Project
Directorate II-2, Division of Reactor
Projects,
NRC Resident
Inspector
DRS Technical Assistant
Document Control
Room
RI,I
@
WPoertner:tm
03/))/89
RI I
RCr enjak
03
/89