ML17347B006
| ML17347B006 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 03/09/1989 |
| From: | Conway W FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| L-89-88, NUDOCS 8903150078 | |
| Download: ML17347B006 (7) | |
Text
',~gPgE~RATED DIST BUTION DEMON TRA'4 SYSI'EM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8903150078 DOC.DATIVE: 89/03/09 NOTARXZED: NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR. AFFILIATION CONWAY,W.F.
Florida Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards select sys assessment progress summary for Feb 1988.
DISTRIBUTXON CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal:
General Distribution NOTES:
DOCKET g 05000250 05000251 RECIPIENT ID CODE/NAME PD2-2 LA EDISON,G INTERNAL: ARM/DAF/LFMB NRR/DEST/CEB 8H NRR/DEST/MTB 9H NRR/DEST/SICB 8DC~>QB RACT REG FILE 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1
0 1'
1 0
1 1
1 1
1 1
1 1
1 1
1 1
1 1
RECIPXENT ID CODE/NAME PD2-2 PD NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/RSB 8E NRR/DOEA/TSB 11 OGC/HDS2 RES/DSIR/EIB NRC PDR COPIES LTTR ENCL 2
2 1
1 1
1 1
1 1
1 1
0 1
1 NOTE I0,ALL "RIDS" RECIPIERIS:
PIZASE HELP US 'IQ REMJCE HASTE!
CGNI'ACT 'IHE DOCUMENI'XNZROL DESK RXM Pl-37 (EXT. 20079)
KO ELDCZNATE KKR NAME FROM DISTBXÃ7ZIGN LISTS FOR DOCUMEXIS YOU DCN'T NEEDt TOTAL NUMBER OF COPIES REQUIRED:
LTTR 19 ENCL 16
C
P.O. Box14000, Juno Beach, FL 33408-0420 PIPll MARCH 9 i989 L-89-88 U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.
C.
20555 Gentlemen:
Re:
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 Select S stem Assessment Pro ress Summar Pursuant to the Nuclear Regulatory Commission Order dated August 12, 1986, the attachment to this letter provides the February 1989 progress summary of the Select System Assessment.
Should there be any questions regarding this information, please contact us.
Very truly yours, Senior Vice President, Nuclear WFC/TCG/gp Attachment cc:
Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 85'03150078 890309 PDR ADOCK 05000250 R
v J r
k
~
4 y g 4 IL 1
SELECT SYSTEH REVIEW FEBRUARY 1989 PROGRESS Design Bas1s Verification act1vities for the orig1nal fifteen select systems cont1nues in accordance with the Integrated Schedule.
Complet1on of this activity is scheduled for Hay 8, 1989.
Design Basis Verif1cation activit1es for Area Radiation Hon1tor1ng System (ARHS), Process Rad1at1on Hon1toring System (PRHS) and Normal Conta1nment Cooling System (NCC) w111 proceed 1n accordance with the Integrated Schedule.
Complet1on of th1s activity 1s scheduled for June 1,
1989.
W~ak~~ow Small Bore P1p1ng and Tubing (ARHS, PRHS 8
NCC)
Un1t 3, 4 and Coaeen areas outside conta1nment completed th1s per1od 1nclud1ng functional1ty reviews.
PAID (ARHS, PRHS 5 NCC)
Un1t 3 1ns1de containment will be performed during the next Unit 3 refueling outage in accordance with the Integrated Schedule.
March 7. 1989 DOCKET NO(S). 50-250/51 Hr. M. F.
Conway Senior Vice President-Nuclear Nuclear Energy Department Florida Power and Light Company Post Office Box 14000 Juno Beach, Florida 33408-0420
SUBJECT:
Turkey Point-Plant DISTRIBUTION yDocket-.F1.1 e,'DI,I-2 Rdg File Dl1i1 1 er GEdison The following documents concerning Four review of the subject facility are transmitted for your information'otice of Receipt of Application', dated Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.
dated Environmental Assessment and Finding of No Significant Impact, dated Q Notice of Consideration of Issuance of Facility Operating License or Amendment to Faci 1 ity Operating
- License, dated Qg Bi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No N if' d
C id i,d d~22 89 f
f)]
Exemption, dated
~
~
Construction Permit No.
CPPR- ', Amendment No.
dated Facility Operating License No.,
Amendment No.
dated Order Extending Construction Completion Date, dated t~1onthly Operating Report for transmitted by letter dated
+ Annual/Semi-Annual Report-transmitted by letter dated
Enclosures:
As stated Division ofMeactor Projects I/II Office of Nuclear Reactor Regulation cc:See next page L
I-2
~ ~
~
~ ~ ~ ~ ~
OFFICE)
SURNAI4E) s'ATE)
RC FORM 3IS IIO/BOINRCM 0240 9'+
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
Q OFFICIAL RECORD COPY p'0
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~
- 0-4I t
1 t
1
,X