ML17347B003
| ML17347B003 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 02/28/1989 |
| From: | Belisle A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Conway W FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17347B004 | List: |
| References | |
| NUDOCS 8903140292 | |
| Download: ML17347B003 (4) | |
See also: IR 05000250/1989001
Text
gC CEM RATED
DlSTPJBt
'TI0%
DE8 04 iTRXTI04
SYZTEk
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ESSION NBR:8903140292
DOC.DATE: 89/02/28
NOTARIZED: NO
ACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light
50-251 Turkey Point Plant, Unit 4, Florida Power and Light
AUTH.NAME
AUTHOR AFFILIATION
BELISLE,A.
Region 2, Ofc of the Director
JULIAN,C.A.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
CONWAY,W.F.
Florida Power
& Light Co.
SUBJECT:
Forwards Insp Repts 50-250/89-01
6 50-251/89-01
on
890109-13.No violations or deviations noted.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
, NOTES:
DOCKET
N
C
05000250
C
05000251
g+/~
INTERNAL:
RECIPIENT
ID CODE/NAME
PD2-2
DEDRO
NRR/DE ST DIR
NRR/DLPQ/QAB 10
NRR/DREP/EPB
10
NRR/DRIS DIR 9A
NUDOCS-ABSTRACT
OGC/HDS2
RGN2
FILE
01
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
EDISON,G
AEOD/DEIIB
NRR SHANKMAN,S
NRR/DLPQ/PEB 11
NRR/DOEA DIR 11
NRR/DREP/RPB
10
NRR/PMAS/ILRB12
IZBE
N,J
E
02
COPIES
LTTR ENCL
1
1
1
1
1-
1
1
1
1
1
2
2
1
1
1
1
1
1
EXTERNAL: LPDR
1
1
1
1
NRC PDR
1
1
S
A
NOTE 'IO ALL "RIDS" RECZPIENIS.
PLEASE HELP US IO REDUCE WASTE!
CXÃI'ACI'IHEDOCUMENI'GÃIRDLDESK,
ROOM Pl-37
(EXT. 20079)
TO ELIMINATEKSR NAME PKM DISTEGBUTIGN
LISTS FOR DOCUMEMI'S YOU DGNiT NEEDf
D
S
TOTAL NUMBER OF% COPIES
REQUIRED:
LTTR
23
ENCL
23
I a8(n<~
FEB 28 198S
Docket Nos. 50-250,
50-251
License
Nos.
Florida Power and Light Company
ATTN:
Mr.
W. F.
Conway
Senior Vice President
- Nuclear
P. 0.
Box 14000
Juno Beach,
FL
33408-0420
Gentlemen:
SUBJECT:
NRC
INSPECTION REPORT
NOS. 50-250/89-01
AND 50-251/89-01
This refers to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
Rich C.
Chou
on
January
9-13,
1989.
The inspection
included
a review of
activities authorized for your Turkey Point facility.
At the conclusion of the
inspection,
the
findings
were
discussed
with those
members
of your staff
identified in the enclosed
Inspection Report.
Areas
examined during the inspection are identified in the report.
Within these
areas,
the
inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and observation of activities
in progress.
Within the scope of the inspection,
no violations or deviations
were identified.
Your attention is invited to the unresolved
item identified in the Inspection
Report.
This matter will be pursued
during future inspections.
In accordance
with Section
2.790 of the
NRC's
"Rules of Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and its enclosure
. will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this letter, please
contact us.
Sincerely,
original signed
by
Al Belisle
Caudle A. Julian, Chief
Engineering
Branch
Division of Reactor Safety
Enclosure:
NRC Inspection
Report
cc w/encl:
(See
page 2)
890=.i40292
890228
ADOCK 0'5000250
Il
PQC
il
~ot
Florida Power and Light Company
FEB 28 1989
cc w/encl:
J.
S.
Odom, Vice President
Turkey Point Nuclear Plant
J.
E. Cross,
Plant
Manager
Turkey Point Nuclear Plant
L.
W. Bladow, Plant
gA Superintendent
J. Arias, Jr., Regulatory
and Compliance
Supervisor
State of Florida
bcc w/encl:
G.
E. Edison, Project Manager, Project
Directorate II-2, Division of Reactor
Projects,
NRC Resident
Inspector
DRS Technical Assistant
Document Control
Desk
err
R Chou:tj
02+/ /89
lake
/Wl/~9
R rlenjak
02/~9
g'k
RCarrion
5Z~/
/S9