RATED DISTQBUTIOA DEMONSTRAIP.'i SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8902280542 DOC.DATE: 89/02/18 NOTARXZED: NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit. 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.
Florida Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Discusses plant point performance enhancement program.
DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal: General Distribution NOTES DOCKET I 05000250 05000251 RECIPIENT ID CODE/NAME PD2-2 LA EDISON,G INTERNAL: ARM/DAF/LFMB NRR/DEST/CEB 8H NRR/DEST/MTB 9H NRR/DEST/SICB
-ABSTRACT EG L
01 EXTERNAL: LPDR NSXC COPIES LTTR ENCL RECXPIENT ID CODE/NAME PD2-2 PD NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/RSB 8E NRR/DOEA/TSB 11 OGC/HDS2 RES/DSIR/EIB NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 A
NCTE 'Io ALL>>RIDS>> RECIPIENrs.
PIZASE HELP US 'IO REMJCE WASTE!
CDNI'ACZ 'lSE DOCUM.'MI'OVHKLDESK RCCM Pl-37 (EXT. 20079) K) EIiBGNA!VE YOUR NAME FRCH DISTRIKTZIQN LISTS FOR DOCEKMIS YOU DON'T NEED}
0'OTAL NUMBER OF COPIES REQUIRED:
LTTR 19 ENCL
pp P.O. Box14000, Juno Beach, FL 33408-0420 FEBRUARY 1 8 198S L-89-52 U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.
C.
20555 Gentlemen:
Re:
Turkey Point Unit 3 and 4
Docket Nos.
50-250 and 50-251 Turke Point Performance Enhancement Pro ram PEP This letter provides the status of the Turkey Point Performance Enhancement Program (PEP).
The status, as discussed at, the recent NRC/FPL management meeting at Turkey Point on January 12, 1989, is as follows:
1 ~
The comprehensive Quality Assurance (QA) closeout audit of PEP has been completed.
- However, two of the nine findings remain open.
These findings, six shift vs. five shift operation and drawing
- update, are currently scheduled to be closed out by October 1990 and June 1,
1989, respectively.
The drawing update finding will be closed by loading all backlogged drawing updates into the Drawing Change Tracking System as part of the long term Drawing Update Program discussed in FPL letter L-88-521 dated December 9,
1988.
2 ~
The remaining PEP tasks are included in the Turkey Point Integrated Schedule. (IS).
Modifications resulting from the select system reviews will also be scheduled and reported in the IS.
A working meeting with NRC Region II staff to review details of the QA PEP closeout audit and the PEP effectiveness assessment will be scheduled in the near future.
Q Should there be any questions on this information, please contact Us, Sincerely yours, OQ GA IA toO QhC ina Plo OA
%CE NNOK PA OJJ0.Q.
W. F.
Con y
Senior V e President Nuclear WFC/PLP/cm cc:
Malcolm L. Ernst, Acting Regional Region II Senior Resident Inspector,