ML17347A967

From kanterella
Jump to navigation Jump to search
Forwards Exam Rept 50-250/OL-88-02 of Exam Administered on 881017-28.Written Exam Questions & Answer Key & Summary of Simulator Performance Deficiencies Observed During Conduct of Simulator Portion of Operating Exams Also Encl
ML17347A967
Person / Time
Site: Turkey Point 
Issue date: 02/06/1989
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Conway W
FLORIDA POWER & LIGHT CO.
Shared Package
ML17347A968 List:
References
NUDOCS 8902170313
Download: ML17347A967 (5)


Text

I i gC CE1Z RA'TED Dl&RIBt'TION DE M0% iTR~TI0%

SY > TEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8902170313 DOC.DATE: 89/02/06 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point. Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION JULIAN,C.A.

Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION CONWAY,W.F.

Florida Power

& Light Co.

R

SUBJECT:

Forwards Exam Rept 50-250/OL-88-02 of exam administered on 881017-28.

DISTRIBUTION CODE:

~ IE42D COPIES RECEIVED: LTR I

ENCL 4 SIZE:

TITLE: Operator Licensing Examination Reports NOTES'ECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: AEOD/DSP/TPAB NRR/DLPQ/HFB 10 NUDOCS-ABSTRACT RGN2 FILE 01 EXTERNAL: LPDR NSIC COPIES LTTR EN L 1

0 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME EDISON,G NRR SHANKMAN,S B 10 G

02 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 S

+ L,SY

~

h NOTE 10 ALL "RIDS" RECIPEERIS'LEASE HELP US 1Q REZUCE~

CGÃZACZ IHE DOCUMENT CCÃZROL DESKS KCM Pl-37 (EXI'. 20079)

'ZO ELDiIKAZE YOUR NAME FROM DISGGZVZION LISIS POR DOCUt&NZS YOU DON'T NEED<

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 12 ENCL

kgb

'I

\\,

february 6, 1989 Florida Power and Light Company ATTN:

Hr.

W. F.

Conway Senior Vice President Nuclear Energy Department P.. 0.

Box 14000 Juno

Beach, FL 33408-0420 Gentlemen:

SUBJECT:

TURKEY POINT EXAMINATION REPORT 250/OL-88-02 The NRC administered examinations on October 17-28, 1988 to employees of your company who had applied for licenses to operate the Turkey Point Nuclear Plant.

At the conclusion of the written examination, a copy of the exam was left with your staff; at the conclusion of the site visit, preliminary findings on the operating tests were discussed with those members of your staff identified in the Examination Report, Enclosure 1.

Copies of the written examination questions and answer key are included in this report as Enclosure 2.

Enclosure 3 summarizes simulator performance deficiencies observed during conduct of the simulator portion of the operating examinations.

In accordance with 10 CFR 2.790(a),

a copy of this letter and its enclosures will be placed in NRC's Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely, (Original signed by C. A. Julian Caudle A. Julian, Chief Operations Branch Division of Reactor Safety

Enclosures:

1.

Exam Report 50-250/OL-88-02 2.

RO/SRO Exam guestions

& Answer Key 3.

Simulation Facility Fidelity Report cc w/encls 1

& 3:

W. Waylett, Corporate Training Dir.

J.

Cross, Plant tdanager cc w/encls 1,

2 and 3:

T. Finn, Site Training Director bcc:

(See page 2)

Florida Power 5 Light Co.

February 6,

1989 bcc w/encl 1:

G. Edison, Project t<anager, NRR R. Crlenjak, Section Chief, DRP C. Casto, OL Examiner, DRS State of Florida bcc w/encls 1,

2 and 3:

Senior Resident Inspector Operator Licensing Branch, DLPQ:NRR Document Control Desk Sonalysts, Contractor RII OBMest 01/

/89 RII CCasto 01/.'"/89 RII JFNunro 01/

/89 II RCrlenjak 01/g g 99 Rl l~g fW CAPul i an 01/- /89