ML17347A776
ML17347A776 | |
Person / Time | |
---|---|
Site: | Saint Lucie, Turkey Point, 05000000 |
Issue date: | 06/07/1988 |
From: | Conway W FLORIDA POWER & LIGHT CO. |
To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
Shared Package | |
ML17345A239 | List: |
References | |
L-88-256, NUDOCS 8806160300 | |
Download: ML17347A776 (67) | |
Text
ACPELERLTED IH&IBUTION DEMON STRION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8806160300 'OC.DATE: 88/06/07 NOTARIZED: NO DOCKET FACIL:50-000 Generic Docket 05000000 50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St..Lucie Plant, Unit 2, Florida Power 6 Light Co. 05000389 AUTHOR AFFILIATION z.~ j- R AUTH. NAME CONWAY,W.F. Florida Power 6 Light Co.
RECIP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards Rev 11 to FPLTQAR 1-76A, "Topical QA Rept."
DISTRIBUTION CODE: Q004D COPIES RECEIVED:LTR J ENCL g SIZE, ~7 ~ ~+
TITLE: QA Topical Report, Amendment, or Correspondence (Docket/U&iTi~ySpeci i
8 NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL A PD2-2 LA 1 1 EDISON,G 1 1 TOURIGNY,E 1 1 INTERNAL: ACRS '10 10 ARM/DAF/LFMB 1 1 y4B~ QAB 10 2 2 NUDOCS-ABSTRACT 1 1'
1 EG FIL Ol 2 2 RGN2 FILE EXTERNAL: DMB/DSS 1 1 LPDR 2 2 NRC PDR 1 1 A
TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24
E P. BOX 14000, JUNO BEACH, FL 33408-0420
@SU/@,
ri~(g~
U.S. Nuclear Regulatory Commission JUgg 7 1988 Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:
Re: Turkey Point Units Nos. 3 and 4 Docket Nos. 50-250 and 50-251 St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 To ical ualit Assurance Re ort FPLT AR 1-76A Pursuant to 10 CFR 50.54(a)(3), please find attached two enclosures representing the annual update of the Florida Power &
Light Company Topical Quality Assurance Report [Revision dated May ll, 1988].
ll, Enclosure I is a summary of the change and a pen and ink mark-up of changed pages to the current Topical Report Revision.
Enclosure II is the revised Topical Report Revision 11.
Changes are indicated on the affected pages by bold vertical print lines drawn adjacent to the portion actually changed.
The revisions made are minor and primarily show organizational changes. None of the changes made in our program description reduce commitments which have been previously accepted by the NRC.
Should there be any questions, please contact us.
Very truly yours, W. F. C Senior Vice President, Nuclear WFC/GRM/dd Enclosures cc: Dr. J. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant Senior Resident Inspector, USNRC, Turkey Point Plant
'8806160300 880607 PDR ADOCK 05000250 p DCD an FPL Group company
ENCLOSURE l Summary of changes to Revision 10 of the Florida Power and Light Topical Quality Assurance Report (FPLTQAR 1-76A)
The title page has been revised to reflect the current revision and date of changes of the Topical Report.
- 2. Table of Contents The Table of Contents has been revised to reflect the current revisions and dates of the individual sections.
- 3. ualit Assurance Pro ram Polic This change is to reflect the new organization and title changes as described in the Topical Report (TQR 1.0).
- 4. T R 1.0 - Or anization The following sections have been revised to reflect the new Nuclear Energy Department organization and new titles: Section 1.2, 1.2.3, 1.2.3.1, and 1.2.'3.2.
- 5. T R 1 0~
- Or anization The following sections have been revised to reflect the title change of Vice President Engineering, Project Management and Construction to Senior Vice President: Sections 1.2.4, 1.2.7, and 1.2.12.
- 6. T R 1.0 - Or anization T R 10.0 - lns ection and T R 15.0 - Nonconformin Materials Parts Or Com onents The following changes are grammar and punctuation changes: TQR 1.0 Sections 1 2 lp 1 2 ~ 3 ~ 1g 1 ~ 2 ~ 3 ~ 2g 1 2 4g 1 2 6p 1 2 Sp 1 ~ 2 ~ 9g 1~2 10' ~ 2~ lip 1 2 12/
and 1.2.13; TQR 10.0 Sections .10.1, 10.2.1, 10.2.2, 10.2.3, 10.2.4, and 10.2.5; TQR 15.0 Sections 15.1, 15.2.1 and 15.2.4.
The three figures reflect the current organization changes of reporting requirements and position titles.
8806160300
1
- 8. A endix E - List of Cor orate ualit Assurance Procedures o Added Quality Procedure (QP) 2.17, "Environmental Qualification (EQ) of Electrical Equipment" to the QA Manual 0 Added Quality Procedure (QP) 6.7, "Control of Vendor Manuals and Vendor Technical Information" to the QA Manual Added Quality Procedure (QP) 7.9, "Control of On-Site Vendor Services" to the QA Manual 0 The following procedures were combined into other Quality Procedures; 9.2 was combined with 9.1; 11.1, 11.2, and 11.3 were combined with 11.4; and 15.1 was combined with 15.2
ENCLOSURE ZI FPLTQAR 1-76A (PPL-NQA-100A) ggyrsre ~ I( SIO
~
10, 1987
~ ~ p /0< f F M JUNE FLORIDA POWER 5 LIGHT COMPANY
1 l
h 11
TOPICAL QUALITY ASSURANCE REPORT Rev. 10 TABLE OP CONTENTS Date June 10, 1987 Page 1 of 2 REVISION DATE Title Page ~We~ l><IP gPJuna 10, 1987 Abstract 3 une 10, 1984 NRC Staff Evaluation Letter Table of Contents ~ // ~kft~p /dg /M'8 une 7 Policy Statement ~ (g W4g H~/5'une Introduction 9 June 10, 1987 )
Topical Quality Requirements TQR 1.0 Organization +~ Jff <g /o//P8f u 987 TQR 2.0 Quality Assurance Program 7 June 10, '987',
TQR 3.0 Design Control 5 June 10, 1986 TQR 4.0 Procurement Document Control June 10, 1986 TQR 5.0 Instruction, 'Procedures, & Drawings 6 June 10, 1986 TQR 6.0 Document Control 4W June 10, 1986 TQR 7.0 Control of Purchased Items & Services 4W June 10, 1986 TQR 8.0 Identification & Control of Materials, June 10', 1986 Parts.& Components TQR 9.0 Control of Special Processes ~
6H June 10, 1986 TQR 10.0 Inspection g'77 titty(>~ rf un 0 1986 TQR 11.0 Test Control 2 June 10, 1986 TQR 12.0 Control of Measuring & Test Equipment 3 ~ June 10, 1985 TQR 13.0 Handling, Storage & Shipping June 10, 1986
~
TQR TQR 14.0 15.0 Inspection, Test & Operating Status Nonconforming Materials, Parts or 6
P g-~ ~P
// /'ne
/f~
June 10; 1986 10, 19 Components TQR 16.0 Corrective Action June 10, 1986
~
ID EO TQR 17.0 Quality Assurance Records June 10, 1986 CV D
0:
TQR 18.0 Audits June 10, 1986 C
0 Z
Ol E
'0 4
TOPICAL QUALITY ASSURANCE REPORT Rev. 10 Date June 10, 1987 TABLE OP CONTENTS Page 2 Df 2 REVISION DATE Appendices A - Organizations 6 Figures Figure 1-1: Organization of Departments ~C ~0~~ /y/ /pg June 10, 1987 Affecting Quality B - Qualification 6 Experience Requirements June 10, 1986 for QA Personnel C - Baseline Document Matrix June 10, 1984 S
D Cancelled May 7, 1982 E - List of Corporate QA Procedures (QPs) /O~&ay/0//PM une 10 1986 F - Topics to be Addressed in Safety Analysis 1 May 7, 1982 Reports
TOPICAL QUALITYASSURANCE REPORT 8 ev.
QUALITYASSURANCE PROGRAM POLICY Date 3une 10, 1986 LORIOA POWER a LIGHT COMPANY Page of NEED FOR POLICY To avoid undue risk to the health and safety of the public and company employees, it is necessary to design, construct, operate and modify nuclear power plants with a high degree of functional integrity, quality and reliability.
STATEMENT OF POLICY It is the policy of Florida Power 4 Light to design, construct, operate and modify nuclear power plants of a quality level that will meet or 'exceed government regulations and wHI merit public confidence by providing electricity in a reliable, efficient, and safe manner.
RESPONSIBILITY The President of Florida Power R Light Company is responsible for the execution of the Quality Assurance Program for Florida Power R Light Company nuclear power plants.
The autho'rity for developing and verifying execution of the Program is delegated to the the Director of Quality Assurance, through the g,cc PreS 'oC ~ e e 6 N<<~e4 Eargy r Qe ~ so<
cC Pre c ~de ~e u ~ ~(cow-q a +e < 8 <<~~ "< Vi c~ Pre J T e cg~~c fb~e fror p~~aa ge.~~v c +i'om ~ v ~ Q~lp'ye r~~
The head of each organization performing quality related activities is responsible for:
identifying those activities within his organization which are quality related as defined
'I /
by the QA Program; establishing and clearly defining the duties and responsibilities of personnel within his organization who execute those quality related activities; and planning, selecting, and training personnel to meet the requirements of the QA Program.
R. E. Talion, resident Florida Power R Light Company Vs z
O.
'I e
0
4 jt
TOPICAL QUALITY ASSURANCE REPORT TQR 1.0 Rev.
10 ORGANIZATION June 10, 1987 32 GENERAL RE UIREMENTS The FPL organizational structure shall be defined such that the responsibilities for establishment and implementation of the Quality Assurance Program are clearly identified. The authority and duties of individuals and organizations performing quality assurance and quality control functions shall be described, and shall illustrate the organizational independence and authority necessary to identify problems; to initiate, recommend, or provide solutions; and to verify implementation of solutions. In addition, the description-.
shall illustrate that persons or groups responsible for verifying the correct performance of an activity are independent of the person or groups responsible for performing the activity.
1.2 IMPLEMENTlLTION The President of Florida Power 6 Light. is ultimately responsible for the execution of the Quality Assurance Program for Florida Power 6 Light'ompany (FPL) nuclear power plants. The authority for developing and verifying execution of the program is delegated to the Director of Quality Assurance, tough th eeg~ice President Sg n'og Vlc@ W~cstgo elglJ 0 0 /Rgb of Nuclear Energy and the Executive Vice President. The reporting relationship of each department involved with the Quality Assurance Program is shown in Appendix A, Figure 1-1.
To provide for a review and evaluation of QA Program policies and activities, the President has established the QA Committee, chaired by the Executive Vice President. This organization's responsibilities are defined in Section 1.2.1 below.
Vl C
0 Z
Ol CV E
0 U.
TOPICAL QUALITY ASSURANCE REPORT T R 1.0 Rev.
10 Date ORGANIZATION June 10, 1987 Page 2 of 32
1.2 IMPLEMENTATION
(Cont ')
In addition, a Quality Assurance Program Review Committee (QAPRC)
(formerly the QA/QC Coordinators) has been established to review changes to the QA Program and to provide an interface for quality matters in each department affecting quality. This organization's responsibilities are defined in Section 1.2.2 below.
The head of each department or organization performing quality related activities is responsible for: a) identifying those activities within the organization which are quality related as defined by the QA Program; b) establishing and clearly defining the duties and responsibilities of personnel within his organization who execute those quality related activities; and c) planning, selecting, and training personnel to meet the requirements of the QA Program. The responsibility, authority, and organizational relationship for performing quality related activities within each organization shall be established and delineated in organizational charts and written job or functional descriptions.
A QA Program Review Committee (QAPRC) Member shall be designated by the head of each department or organization except for the Quality Assurance'Coamittee, since thiw committee is a policy forming body (of which.- the Director of Quality Assurance is a member). The QAPRC Member is the prime interface for coordination of quality related matters within the member's department, with the QA Department, and with other departments.
The organization chart, Appendix A, Figure 1-1, illustrates the lines of authority and areas of responsibility for each of the organizations that are involved in quality related activities. The
TOPICAL QUALITY ASSURANCE REPORT TQR 1.0 Rev. 10 ORGANIZATION June 10; 1987 Page 3 of
- 1. 2 IMPLl96KNTATION (Cont ')
Project Management organization shown in this figure is applicable during. design, procurement, construction, repairs and preoperational start-up and testing of power plant and modifications of power plants (determined by management on a case-by-case basis) as described in Section 1.2.4. Be'low are listed the departments and organizations that have Quality Assurance responsibilities.
Specific organizational responsibilities for implementation of the Quality Assurance Program are described in the corresponding section'umbers.
1.2.1 Quality Assurance Committee 1.2.9 Construction Quality Assurance Program 1.2.10 Power Supply 1.2.2'.2.3 Review Committee 1.2.11 Inventory Resources Nuclear Energy Department 1.2.12 Company Nuclear
-Nuclear Operations Review Board
-Quality Assurance 1.2.13 Nuclear Fuel
-Nuclear Licensing 1.2.14 Corporate Records Services r
1.2.4 Project Management Department ,1.2.15 Documentary Files 1.2.5 Corporate Contracts Department 1;2.6 Environmental Affairs 1.2.7 Power Plant Engineering 1.2.8 Purchasing 1.2. 1 Quality Assurance Committee The Quality Assurance Committee, chaired by the Executive Vice
~e.evi 6@v a b <
President, is comprised of executive level <management with responsibilities for the execution of the Quality Assurance Program within their responsibilities. 'his Committee's Vl C
0 Z
Ol C4 F
0
TOPICAL QUALITY-ASSURANCE REPORT TQR 1.0 Rev.
10 ORGANIZATION June 10, 1987 Page 4 of 32 Quality Assurance Committee (Cont'd) composition is delineated in its current charter and it '
reporting relationship is shown in Appendix A, Figure 1-1.
The Quality Assurance Committee is responsible for reviewing and evaluating QA Program policies and activities. Policy changes shall be initiated when Committee findings indicate the necessity. Quality Assurance Program status reports shall be periodically prepared by the QA, Department and routed to the members of th'e QA Committee for their review.
In addition, QA Committee meetings shall be held by the Executive Vice President to keep members apprised of conditions including signif icant problems that require management attention. Th'e Quality Assurance Coaanittee shall be the final authority for resolution of contested quality policies, differences of opinion, and stop-work or other corrective action requests when lower level agreement cannot be reached between QA or QC ahd other departments. Periodic audits of the Qua'lity Assurance Department shall be performed by a team independent of the QA Department, which is selected and approved by the Chairman of the Quality Assuiance committee.
1 The results of this audit are presented to the QA Committee.
Quality Assurance Program Review Committee (QAPRC)
The QAPRC (formerly the QA/QC Coordinators) was formed as an organization with the responsibility to review and resolve recommended changes to the'A Program. This committee is administered by the QA Services group. QA Program changes reviewed by the QAPRC are reviewed and signed by the department heads or individuals listed on each Quality Procedure.
TOPICAL QUALITY ASSUR1QKZ REPORT TQR 1.0 Rev. 10 ORGANIZATION June 10, 1987 Page g of 32 1.2.3 Nuclear Energy Department
-Nuclear Energy responsibility for the plant begins with the Department's acceptance of a system or portion thereof from FPL Project Management; Throughout the remainder of plant life, Nuclear Energy maintains control of and responsibility for any plant modifications coordinated by Nuclear Energy and for the preoperational and . start-up testing, operation, maintenance, refueling, and modification of the plant in accordance with written and approved procedures.
The organizational'tructure of Nuclear Energy is shown in SCic iOt Appendix A, Figure 1-1. The~exp- Vice President of Nuclear
~eepy has overall responsibility for Nuclear Energy's .
e.~'i a r Vi ca Pre a i o(<<.~a IU ~ c. f<<.o.r activities. 7fi,c S cr of S ~ io~ 4 01 ~ ~
4cl'~<roid J o p c.c c.4 I~'i4y Te.c4N>C 4I $ pc.c((ic'.a,7 iortgJI Reporting to 7 t< 5ii~
the~upi'cAVice Vlc.e Pves President ~Nuclear -Rnep~yre:
m~ S~ Lu. c-ic'> WC, Si+ Vc'c.c t
W< v;gc P'0't eQ ~ a g t0 fly c.~ p r~g'rgb ~+ jQ ec c.cc, c' M c.
cga )
/~glrive g0uC4
$ ~F~
O
<<ye- g/ 1. 2.3.g P 6c Ve c e 1 Qp
~~ a i <e.~7 4 4. c- EN<<.vga, iy I t.h+oel >0 44.
e 4a. E i
f.i y, ircc.i ~im<< +e~c /~ o f pc2rSo~nc For sapor vlaarp. ec epee<<.+i'<<p on+,+g j y f S+<<.f hara i ]os Capforf)'a nwc. ea.c" ops ~ .( ewer<<.T ~++) i
~
c Ta Ae V.'cc- Prer:P>~~ f'cport'i~p g v c./t<<. r e. ar cc o v.>>. icf <<.g'~ge ~~~ce <a~ccgcc-r Ncc v/8. cir~ g<<<<Jes- g ci.c. c.ar g ccc<ct Rv.v i ce.S 'f4e- Plica.~cc. e.r 5F ic clecxp 7 rcc r rllg<
~
ID i0 ci pic > t're c.+o r 0f. Qu.a(it Pgg u ircc ~ ce. c lira c+e p 0 F Nu c./e ar Lcce <s<~y r
~ i J Ne. ~cc. er oF V/c ~~) Cc. wN < o~+v cafe Vl 0
0 z
cl C4 E
0 c
TOPICAL QUALITY ASSURANCE REPORT TQR 1. 0 Rev.
10 ORGANIZATION June 10, 1987 Page, 6 of 32 h) ta. t le ga p 7O wtp 6g sg C g 0- +s a ~
1.2.3.1 (Cont'd) 5y)+ Sr&
The ~Vice President-St. Lucie and~Vice President-Turkey Point Nuclear are accountable for the operation, maintenance, and modification of their respective nuclear plant, as well as the selection, development and direction of the assigned staff.
They will act as liaison between the plants and corporate headquarters, and are accountable for assuring that company policies and procedures are properly implemented and continued at the nuclear site.
I~C+ '
~ vggO g
) p The Manager Nuclear Energy Services is accountable for technical f staf support to the generating department and certain centralized special functions. This group consists of section supervisors and technical specialists, with functions including Health Physics, Chemistry, .Radiological Waste, Emergency Planning, .Plant Support, . and'Materials, Codes and Inspections.
The Maintenance Manager Nuclear is responsible for directing activities in support of major plant maintenance projects, modifications, and upgradings, as well as the development of work. methods, specifications and systems to promote increased productivity.
The Manager of Nuclear Training establish ~~
company policy regarding nuclear training and secure the necessary resources to ensure that Nuclear Energy personnel are adequately trained. 'hey must have adequate. technical and job related. skills to provide safe, efficient operation while complying with. NRC requirements.
TOPICAL QUALITY ASSURANCE REPORT TQR 1.0 Rev. 10 ORGANIZATION Date June 10, 1987 Page 7 of 32 4 ~ c f~ c. ~ Pa ~ c. Q ~~ e, ~a. +I 0 ~
v 1.2.3.1 (Cont'd)
The Plant Manager (Plant Manager Nuclear at PTN) through the Vice Presidents - Turkey Point Nuclear and St. Lucie Plants (as applicable) is responsible for the. oper'ation of the nuclear plant. The plant manager is additionally responsible for the establishment and implementation of plant QC policy which implements the quality control aspects of the Quality Assurance Program.
Reporting .directly to the Plant Manager is the plant Quality:
Control Supervi'sor who has the authority and freedom to administer the plant Quality Control program and, when necessary, for stopping activities adverse to quality. The QC Supervisor, his staff, and personnel performing QC inspection functions are required to be independent of groups or persons performing activities that they may be required to verify or inspect. QC effort includes preparation and review of plant procedures, PCMs, quality related inytructions and procurement 4, c. p~~sonpeI e.vc a/s~ ~spa~s/Pr /c Far documents; @he inspection, monitoring, surveillance, and review of plant activities to verify compliance with the provisions of the facility,.operating license and the Quality Assurance Manual. The QC Supervisor shall take corrective action for
-deficiencies identified, where applicable, and shall follow up on corrective action taken by other organizations 'until close out. He shall receive quality program .direction from the Director of Quality Assurance.
CO CV The Plant Nuclear Safety Committee (PNSC) at Turkey Point Plant or the Facility Review Group (FRG) at the St. Lucie Plant is comprised of key plant management and staff personnel as Vl C
0 z
Ol N
C 0
TOPICAL QUALITY ASSURANCE REPORT TQR 1.0 Rev. 10 ORGANIZATION June 10, 1987 Page 8 of 32 Q~ ~ f4' g py ~ g '( Q+%rk'4 +4 pl 0 lb'Cont'd) described in the plant Technical Specifications. The PNSC/FRG serves the plant manager in a technical advisory capacity for the review of all safety related procedures and activities that impact on plant safety. and the facility operating license.
] ~ c. ~ We ~mph The Quality Assurance Department shall be responsible for administering the FPL Quality Assurance Program. This includes developing and verifying implementation of corporate policies, plans, requirements, and procedures affecting quality. This is accomplished through the Quality Assurance Department. The Quality Assurance Department retains responsibility for delegated portions of the QA Program by performing initial evaluation and subsequent periodic audits of the contractors'A Programs. The QA Program responsibility further extends to the performance of audits within the Company to assure management that the established requirements and procedures are being implemented, and that, the. Program complies with the baseline document requirements.
~
The organizational freedom of the QA function is accomplished through the corporate structure, illustrated in Appendix A, which provides independence from those departments responsible for design, procurement, engineering, construction, and operation. With Quality Assurance as the sole function of this organizationally independent department, the Director of Quality Assurance and his staff, both on-s'ite and offsite, are completely free from the cost and scheduling pressures of
TOPICAL QUALITY ASSURANCE REPORT TQR 1. 0 Rev. 10 ORGANIZATION Date June 10, 1997 Page 9 of 32 1.2.3.2 design, procurement, construction, and operation. The Quality Assurance Department has the freedom and authority to: a) identify quality problems; b) initiate, recommend or provide corrective action; c) verify implementation of the corrective action; and d) recommend the stoppage of work or operations ionic adverse to quality, when necessary.
The Assurance reports to thq~ep Vice Director of Quality4ppggjrat.j'cgwwuvst.afro~acceds7o President of Nuclear Energy. He is responsible for the L/ i c e p'pc g w+ AJ ale Ic.a v technical direction and the administrative control (e.g.,
performance appraisal, salary review, hire/fire, position assignment) of all members of the Quality Assurance Department.
The Manager of Quality Assurance Services, the Manager of Quality Assurance Procurement 6 Reliability, the Superintendent of Quality Assurance - St. Lucie and the Superintendent of Quality Assurance - Turkey Point report administratively and functionally to the Director .of Quality Assurance. The Superintendents of QA receive technic'al direction from the Manager of QA Services.
gg n (0 V
-- The Director of Quality Assurance, the ~amp-Vice President~
Nuclear ~ee.~, and the Vice President ~ Nuclear
~ Ae.vp are each members of the Quality Assurance Committee. This reporting relationship and memberships on the QA Committee assure that the QA Department has direct access.to the levels ED Ol of management necessary to assure effective implementation of D
the QA Program. Further, the Operations QC Supervisors of both
~
C Turkey Point and St. Lucie receive quality program direction C
from the Director of QA.
0 z
Ol Ol
TOPICAL QUALITY ASSURANCE REPORT TQR 1.0 Rev. 10 Date ORGANIZATION one 10, 1gS7 10 o< 32 1.2.3.2 g << 'Cont'd)
~~~ v'o v"p>~+~< s ~(i The Manager of QA Services directs and administers the Corporate Quality Assurance Program, including developing and verifying implementation of policies, plans, requirements, procedures, and audits which assure compliance with the baseline documents listed in Appendix C of this Topical Quality Assurance Report.
The duties, responsibilities, and authorities of each Quality Assurance group are described in the sections which follow.
- a. Quality Assurance Services Group Quality Assurance Services is responsible for the development and maintenance of 'he overall QA Program, including the following:
0 Develop and maintain the QA Department Quality Instructions, QA Department Training S Organization Manual, and the corporat.e QA Manual; including the administration of the QA Program Review Committee (QAPRC)
Assist other departments in the development of Quality Instructions by review and comment and through interpretation of corporate Quality Assurance requirements; o Develop 'nd implement a Quality Assurance indoctrination program for FPL supervisory personnel, and a training program for the Quality Assurance Department;
TOPICAL QUALITY ASSURANCE REPORT T R 1.0 Rev.
10 Date ORGANIZATION June 10, 1987 11 0 32 1.2.3.2 p)
'Cont'd)
~/ < < (0 spy ea.) c pQf 6 o Prepare reports on Quality Assurance Program activities for presentation to the Quality Assurance Committee by the Manager of Quality Assurance
'ervices; o Maintain a file system for documentation of quality assurance activities performed by the QA Department; o Review Regulatory Guides, Codes, SAR Document Commitments and Standards for impact on the Quality-.
Assurance Program and recommend aPppropriate program'.
changes; o Review documents submitted to the Company Nuclear Review Board (CNRB) as requested 'by the QA Department CNRB member; o Plan, coordinate and implement a comprehensive system of periodic internal audits with support from the other Quality Assurance groups, when necessary; o Initiate, recommend or provide solutions and verify implementation of solutions for quality problems ident ifled~(
o Review FPL originated design specifications for inclusion of appropriate quality requirements.
b'. Quality Assurance Procurement and Reliability Group The Manager of Procurement and Reliability is responsible for assuring the quality of safety related items and lO C4 services, and their vendors, including the following:
D vl C
0 Z
Ol
~4 CV C
0
TOPICAL QUALITY ASSURANCE REPORT TQR 1. 0 Rev. 10 ORGANIZATION Dam June 10, 1987 Page 12 of 32 g~~/~ ~< +~ijowa.~c s~CF 1.2.3.2 (Cont'd) o Assist in the development and implementation of policies, plans, requirements~and procedures for the
~
requisition and purchas'e of materials, equipment and services related to nuclear power plants and to the acceptance and storage of equipment and material;
. o perform appropriate surveillance of hardware during manufacture; o Develop and implement a program for auditing of supplier QA/QC programs including architect/engineer/
NSSS Suppliers; o Review and approve FPL procurement documents, and changes to these documents to assure that the necessary quality requirements are impose+J o Assist other FPL departments in the identification of quality problems associated with procurement and storage; initiate, recommend, or provide solution; and verify implementation of solutions; o Review, approve~ and periodically audit the execution of FPL contractor quality assurance programs; o Maintain a file system for documentation of quality assurance activities performed by the QA Procurement group; o Evaluate the Quality Assurance capability of suppliers requested by Purchasing and Corporate Contracts and maintain the Quality Assurance Department "Approved Suppliers List".
The responsibility of this group, in terms of phases of.
procurement, .begins with the preparation of the procurement document, extends through bid evaluation,
TOPICAL QUALITY ASSURANCE REPORT TQR 1. 0 Rev. 10 Date ORGANIZATION June 10, 1987 Page 13 of 32 pJ
- /e A.v ~~go ~~~ ~Ft 1.2.3.2 (Cont'd) vendor selection, fabrication@ and shipment; and ends upon receipt of shipment at the operating plant or warehouse.
This group, through audits and surveillances, assures that the contractor's organizations performing QA functions
- have sufficient authority and organizational freedom to implement effective QA programs.
,c. Quality Assurance Group - Turkey Point The Superintendent of QA-Turkey Poi.nt has responsibility for on-site development and implementation of the Quality
.Assurance Program, including the following:
o Coordinate in the development and implementation of policies, plans, requirements, and procedures for portions of the quality assurance program related to the operation and modification of nuclear power plants at Turkey Point Units 3 and 4 (PTN);
0 Perform audits, assessments~and other observations at PTN to verify compliance with QA Program commitments, identify 'quality problems~ and ensure timely corrective actions are taken in the areas of plant operation, system turnover, . modificatio and maintenance; including such areas as refueling, inservice inspection and te'sting, procurement of Cl spare/replacement parts, material storage, health C4 0
physics, chemistry, plant security and fire
~I CC protection; Vl C
O Z
Ol E
0 IL
TOPICAL QUALITy ASSURANCE REPORT TQR 1.0 Rev. 10 Oate ORGANIZATION June 10, lg87 P89B ]4 of 32
+ ++6 1.2.3.2 'Cont'd)
/< a,r Ca wpoFa o Identify requirements, ensure inclusion of commitments in documents and verify implementation of the Quality Assurance Program during the backfit activities at PTN through audits of FPL and contractor organizations; o Recommend stoppage of work or operations adverse to equality at PTN in accordance with the appropriate Quality Procedures; o Review and comment 'n Quality Instructions or equivalent quality related administrative procedures prior to issue, with respect to the requirements of the FPL Quality Assurance Progr~> the PTN Final Safety Analysis Report > and the PTN Technical Specifications; o Assure that the status is tracked for all PTN open items .identified by the FPL QA Turkey Point group, and inform appropriate management when there is an indication that a commitment will not be met on time; o Maintain. a file system for documentation of quality assurance activities performed by the Turkey Point grou~ ~~
o Assure design related activities performed by the Architect/Engineer meet the quality aspects of the contract; o Review backfit procedures with respect to the FPL QA Program ( for procedure review requirements see TQR 5.Q):
o Review site generated FPL procurement documents and changes to procurement documents in accordance with the appropriate Quality Proceduresn .
TOPICAL QUALITY ASKJRANCE REPORT TQR 1.0 Rev. 10 ORGANIZATION June 10, 1987 Page 15 of 32 Q~ ~leww C o P 1.2.3.2 (Cont'd) o Perform audits of PTN architect(engineer(NSSS suppliers both on-site and off-site, in conjunction with QAPGR.
The interface with the QA Procurement 6 Reliability group ends with the receipt of a shipment of nuclear safety related equipment at the plant site. The Quality Assurance program for the shipment is then within the:
purview of the QA Turkey Point group.
Off-site interfaces for the resolution of quality related problems and NRC items age with Project Management, Power Plant Engineering, <~Nuclear Energy Staff, and the architectppngineer)(NSSS Quality Assurance Department.
. This group is called upon to audit the Turkey Point operating plant. The Turkey Point group interfaces with the Site Vice President and his staff on-site by assisting in the. resolution of quality related problems.
- d. Quality assurance Group St. Lucis (PZ I)
The Superintendent of QA St. Lucie has responsibility for on-site development and implementation of the Quality Assurance Program, including the following:
o Coordinate in the development and. implementation of ID requirements~ and procedures for IO ru policies, plans, portions of the quality assurance program related to the operation or modification of St. Lucie Unit 1 &
ul C Unit 2 (PSL);
0 Z
Ol cu C
0
TOPICAL QUALITY ASSUEUQKE REPORT TQR 1.0 Rev. 10 ORGANIZATION Oate June 10, 19S7 l
16 of 32 pJ et.g/g sm.( Ccs//Pip i'ss'fg 57 4.FF 1.2.3.2 (Cont'd) 0 'Perform audits, assessment~s and other observations at PSL to verify compliance with QA Program commitments, identify quality problems and ensure timely corrective action are taken in the areas of plant operation, system turnover, modif icatio~ and maintenance; including such areas as refueling, inservice inspection and testing, procurement of spare/repiacement parts, material storage, health physics, chemistry, plant securit+y and fire protection; o Identify requirements, ensure inclusion of commitments in documents and verify implementation of the Quality Assurance Program during. the backfit activities at PSL through audits of FPL and contractor organizations; o Maintain a file system for documentation of quality assurance activities performed by the St. Lucie Projects-QA group; 0 Assure design related activities performed by the hrchitec+t ngineer meet the gcalitp aspects ct the contract; o Review backfit procedures with respect to the FPL QA Program (for procedure review requirements see TQR 5.0);
o Review site generated FPL procurement documents and changes thereto, in accordance with appropriate Quality Procedures; o Perform audits of PSL architect/engineer/NSSS suppliers both on-site and off-site, in conjunction with QAPGRg s J
TOPICAL QUALITY ASSURANCE REPORT TQR 1. 0 Rev. 10 ORGANIZATION Date June 10, 19S7 Page 17 of 32 pJ + (~o ~ Qo pro ~fc 1.2.3.2 (Cont'd) o Recommend stoppage of work or operations adverse to quality at PSL in accordance with the appropriate Quality Procedures; o Review and comment on Quality Instructions or equivalent quality related 'dministrative procedures prior to issue, with respect to the requirements of the FPL Quality Assurance Program+> the PSL Final Safety Analysis Reports and the plant Technical:
Specifications; o Assure that the status is tracked for 'all PSL open items identified by FPL St. Lucie Projects QA group, and inform appropriate management when there is an indication that a commitment will not be met on time; 1
The interface with the QA Procurement 6 Reliability group ends with the receipt of a shipment of nuclear safety at the plant site. The Quality Assurance program for related'quipment the shipment is then within the purview of the St. Lucie Projects QA groupg Off-site interfaces'or the resolution of quality related problems and NRC items are with Project Management, Power Plant Engineering, Nuclear R eeg Energy Staff~ and the aruhiteetpngineerp1SSS Quality nssuranne Department. This Jf group is called upon to audit the St. Lucie operating plant.
The St. Lucie Projects QA group interfaces with the Site Vice President and his staff on-site by assisting in the resolution of quality related problems.
Vl C
O Z
gl c~
6 0
IL
'OPICAL QUALITY ASSUEULNCE REPORT TQR 1.0 Rev. 10 ORGANIZATION Date June 10, 1987 Page 18 of 32
/ Q g )i~ g g c. fee.p co vpo r a c ~ ~A ~~
((a>>T +)
.9-.9 Nuclear Licensing The Director of Nuclear Licensing is responsible for coordinating the NRC interface, distributing NRC documents requiring actions, evaluating potential impactg and responding to all NRC action items. He is also responsible for assuring that the status is tracked for all open items identified by the NRC or other federal, local an'd state agenciegs, and for informing appropriate management when there is an indication that a commitment will not be met on time.
1.2.4 Project Management Department The Project Management Department, through the Project General Manager, exercises management control of assigned projects.
This management control begins when a Project is assigned to the Project Management Department and continues until the facility is accepted for operation or the project is complete.
This management '. control . includes the responsibility for procurement,.'epair, construction and may include preoperational start-up and testing of power plant mod&Xcations'The Project Management Department-organization is shown in Appendix A, Figure 1-1.
Se,~ IO<
The Director of Projects, reporting to the Vice President has overall responsibility for the activities of the Project Management Department. A Project General Manager, reporting to the Director of Projects, is responsible for completing the assigned project in compliance with technical and other project
TOPICAL QUALITY ASSURANCE REPORT TQR 1.0 Rev. 10 ORGANIZATION Date June 10, 1997 Page 19 of 32 1.2e4 Project Management (Cont'd) specifications, and for the application of the provisions of the Quality Assurance Manual during the project. The Project General Manager is responsible for obtaining corrective action from any contractor's management when corrective action cannot be obtained at the project site management level and, when necessary, can exercise his authority to stop work on project activities adverse to quality.
The overall responsibility for Plant Changes and Modifications.
to operating plants is defined in each . plant's Technical Specifications. However, frequently the work of, installation and administration of Plant Changes and Modifications is ar f 8 g Pq eeg et assigned to FPI Prefect Management. The Pro]ect Site Manager will report to the appropriate nuclear site Vice President but will also receive guidance and advice from the Project General Manager. The Project Site Manager is additionally responsible for the functional direction of construction QC for the purpose of coordinating inspection activities which implement the quality control aspects of the quality assurance program for modifications of - projects assigned to project management.
'ctivities affecting quality may be performed by FPL, or contracted. Should any of these functions be contracted, the contractor may perform the activities under his own Quality Assurance Program, which must have prior approval by FPL Quality Assurance, or the contractor may directly adopt the cs requirements of the FPL Quality Assurance Manual. If the cs ol s
contractor implements the Quality Control function directly to the FPL QA Manual requirements, the contractor's Quality Control Supervisor shall have the authority and freedom to Vl C
administer the Quality Control program.
0 2
gl ce E
O
TOPICAL QUALITY ASSURANCE REPORT TQR 1.0 Rev.
10 ORGANIZATION June 10, 1987 Pege 20 0~ 32 1.2.4 Project Management (Cont'd)
Project Team Members are appointed by their home department heads as the departmental representative on the respective project, when requested by the Project General Manager. Team Members, other than Quality Assurance and Stores Department, report functionally to the Project General Manager, or the Project Site Manager, but continue to receive administrative support and technical direction from their home department.
Team members are responsible to the Project General Manager for home department support to the Project.
1.2.5 Corporate Contracts Department The Corporate Contracts Department is responsible for generation, negotiation and issuance of Contracts over specified time periods and dollar limits . for turbine generators, steam generators, nuclear steam supply systems (NSSS), new items, repairs, constructors, construction managers, and Architect Engineer (A/E) and consulting services. Corporate Contracts is also responsible for assuring that technical and quality requirements developed by others are incorporated in such contracts, as appropriate, and that these contracts have the required approvals. Details of the activities of the department in fulfilling this responsibility shall be delineated in the appropriate Quality Procedures. The Manager of Corporate Contracts reports to the Director of Corporate Contracts. The Corporate Contracts Organization is shown in Appendix A,'igure 1-1.
TOPICAL QUALITY ASSURANCE REPORT TQR 1. 0 Rev. 10 ORGANIZATION Date June 10, 1987 Page 21 of 32 1.2.6 Environmental Affairs Environmental Affairs is responsible for obtaining the federal and state environmental permits required for FPL facilities and operations. Environmental Affairs is responsible for overall coordination of non-radiological environmental monitoring (federal and state) programs at the nuclear power plant sites.
The Manager of Environmental Technical Services, the Manager of Environmental Resources and Planning~ and the Manager of Environmental Permitting and Programs report to the Director of Environmental Affairs as illustrated in Appendix A, Figure 1-1.
The Director of Environmental Affairs has overall responsibility for implementation of the Environmental Technical Specifications and Environmental Protection Plans at nuclear power plant sites.
The Environmental Affairs Department through its management of the Company Environmental Review Group (CERG) is responsible for overall coordination of environmental monitoring programs and requirements related to the Environmental Technical Specifications and Environmental Protection Plans. The CERG provides review of - proposed changes to the Environmental
-'-Technical Specifications and Environmental Protection Plans, review of any violations of monitoring and/or limitation requirements and review of proposed plant changes and modifications for environmental impact effects as requested by the plant manager(s).
lO C4 D
CC C
0 z
Ol C4 6
0 U
TOPICAL QUALITY ASSURANCE REPORT TQR 1.0 Rev. 10 ORGANIZATION Date June 10, ].9@7 Page 22 of 32 1.2. 6 Environmental Affairs (Cont'd)
The CERG 'provides information to the Director of Environmental Affairs and the Chairman of the CNRB on environmental matters for which requirements are included in the Environmental Technical Specifications and Environmental Protection Plans.
1.2.7 Power Plant Engineering The Power Plant Engineering Department (JPE) is responsible for power plant design related aspects of the FPL QA Program throughout all phases of plant life except as specified for the Fuel Resources Department in Section 1.2.13. This responsibility extends from initial engineering evaluations of plant design related site characteristics, through preliminary and detailed design, const'ruction, operation and decommissioning.
JPE performs design related activities and delegates design related activities to qualified contractors. For activities performed by JPE, the work is governed by FPL's QA Program, and JPE is responsible for approval of the design output.
Delegated activities are performed in accordance with an FPL approved QA Program and the contractor is responsible for approval of design output. JPE is responsible for defining the scope of delegated activities and the responsibilities of the contractor. Prior to the release of design outputs by contractor organizations, JPE ensures that the contractor is technically qualified to perform the design related activity.
TOPICAL QUALITY ASKJMHCE REPORT TQR 1.0 Rev. 10 ORGANIZATION Date June 10, ].987 Page 23 of 32 1.2.7 Power Plant Engineering (Cont'd)
JPE is responsible for development and maintenance of the design control program governing design related activities performed by JPE and for providing technical support to the Quality Assurance Department for assessing the adequacy, implementation and effectiveness of contractor design control programs.
JPE is responsible for the preparation, revision, approval and distribution of plant design drawings that are identified to be maintained as "asconstructed" drawings during plant operation.
I Sc~ iOy.
The Chief Engineer - Power Plants reports to the<Vice President as shown in Appendix A, Figure 1-1.
1.2.8 Purchasing The Purchasing Department is responsible for the purchase of materials and services by FPL for its nuclear power plants with the exception of those materials and services secured by
.,Corporate Contracts -and Nuclear Fuels. Materials and services for nuclear safety related application are secured only from approved suppliers, or as commercial grade, as applicable.
The Department is responsible for assuring that technical and o v @-
ID quality requirements developed by others~ -a@i- reviewed and N approved by th'e designated quality departments as applicable, D
C are incorporated in the procurement document which the departments authorizes. It is responsible for maintaining C
0 Z
Ol N
E 0
U.
TOPICAL QUALITY ASKGRNCE REPORT TQR 1. 0 Rev. 10 ORGANIZATION " June 10, 1987 Page 24 0~ 32 1.2.8 Purchasing (Cont'd) traceability of purchase records from acceptance of requisitions through payment of the purchase order invoices.
The Manager of Purchasing reports to the Director of Procurement and Materials Management who reports to the Vice President of Corporate Services, Chief Financial Officer as shown in Appendix A, Figure 1-1.
1.2. 9 Construction The Construction Department is responsible for providing direction and coordination regarding construction, supervision and management, equipment utilization, quality control, welding, NDE and other construction support activities.
The Director of Construction reports directly to the Vice President of Engineering, Projects and Construction. He is r esponsible for directing and administering ef fective management of the Construction Department to ensure compliance to the corporate policies, pgactices and procedures. Reporting to the Director of Construction are the Manager of Plant II Construction and the Manager of. Construction QC, Welding and NDE.
The Manager of Plant Construction is responsible for providing qualified construction support personnel to the Project Site Manager. Reporting administratively to the Manager of Plant Construction are the Construction Superintendents.
TOPICAL QUALITY ASSURANCE REPORT TQR 1.0 Rev. 10 ORGANIZATION June 10, 1987 P>9~, 25 <<32 1.2.9 Construction (Cont'd)
The Construction Superintendent is responsible for conformance of project construction activities to the requirements of specifications, codes, regulations and site procedures. He supervises the construction personnel assigned to the project, coordinates construction activities including the scheduling of construction personnel requested by the Project Site Manager.
The Manager of. Construction Quality Control, Welding and NDE is; responsible for directing and administering the Constr'uction QC and Welding Programs and for the technical direction and administrative control of all personnel within the Construction QC and Welding organizations. This includes the 'development and implementation of policies, plans, and procedures to meet the requirements of the QA program, codes and standards.
Reporting to the Manager of Construction QC, Welding and NDE are the site Project QC Supervisors, NDE Level III Supervisor, FPL Welding Superintendent and a staff of QC Coordinators.
The Construction QC Department is responsible for providing quality inspection as required, to assure that backfit activities meet the requirements of engineering plans,
. specifications, codes and 'standards. This responsibility extends from receipt- inspections of material on-site to acceptance of the installed items prior to turnover to the Nuclear Energy Department. It also includes verification of conformance of an item or activity accomplished during this CO C4 D
period to quality requirements (e.g., records review, NDE, inspections).
Ill C
0 Z
Ol
~4 N
C 0
TOPICAL QUALITY ASSURANCE REPORT TQR 1. 0 Rev.
10 ORGANIZATION June 10, 1987 P~ge 26 of 32 Construction (Cont'd)
Each nuclear power plant is assigned a Project Quality Control Supervisor, who directs the on-site backfit QC organization.
The Project QC Supervisor reports administratively and technically to the Manager of Construction Quality Control, Welding and NDE, however, he,also reports functionally to the Project Site Manager for the purpose of coordinating and scheduling inspection activities. The functional/
administrative reporting roles provide the necessary independence of the site Construction Quality Control organization and also maximizes the communication between the Construction staff, the QC staff and the Nuclear Energy staff.
The Project QC Supervisor is responsible for first line verification of the conformance of backfit activities to quality requirements, specifications, code~s and local, State and Federal regulations. He directs on-site implementation of the Construction QC Program which includes supervision>and daily coordination>and scheduling of inspection activities, and I
review of inspection results. The freedom and independence of the on-site QC organization to assure the effectiveness of the QC Program from pressures of cost and scheduling is derived frcm.-the Project QC Supervisors administrative and technical reporting relationship. to the Manager of Construction QC, Welding and NDE.- Both the Manager of Construction Quality Control, Welding and NDE, and the Project Quality Control Supervisor have the authority to stop work or operations adverse to quality if the need arises.
TOPICAL QUALITY ASSURANCE REPORT TQR 1.0 Rev. 10 ORGANIZATION Date June 10, 1987 Page 27 Of 32 1.2.9 Construction (Cont'd)
The NDE Level III Supervisor is responsible for directing and monitoring the NDE+ activities performed under the control of the Construction Department. He is responsible for preparation, revision and implementation of NDE procedures, and the training, testing and qualification of the NDE personnel performing these activities. He is also responsible for providing the programs and direction for performance of NDE activities meeting the ASME, AWS and other:-
NDE code requirements.
The Quality Control Coordinators provide staff technical and administrative support to the Manager of Construction QC, Welding and NDE in the preparation, review, issue and monitoring of the Construction QC program to ensure effective implementation.
The FPL Welding Superintendent reports to the Manager of Construction QC, Welding and NDE. His responsibilities are to develop, maintain and c'ontrol the.FPL Welding Control Manual with assistance from Power Plant Engineering to originate and qualify welding 'rocedure specifications and qualification of
'elders and welding operators to meet the - applicable code requirements,. He provides administrative and technical direction to the personnel within the FPL welding control program to meet engineering welding standards and code requirements. Reporting to the FPL Welding Superintendent are the Welding Supervisors at each Nuclear site.
The organization structure of the Construction Department is Vl C
0 illustrated in Appendix A, Figure 1-1.
z Ol CV 0
TOPICAL QUALITY ASSURANCE REPORT TQR 1.0 Rev. 10 ORGANIZATION Date June 10, 1997 Pege 28 of 32 1.2. 10 Power Supply Within the Power Supply Department only equipment and services provided by the System Protection Group and Power Supply Technical Services are subject to the requirements of the Quality Assurance Program. Appendix A Figure 1-1 illustrates the reporting relationship.
System Protection is responsible for test, calibrationg and maintenance of certain high voltage electrical protective relays for safety related systems of the nuclear plant.
Activities of System Protection include final wiring connection checks, preoperational check-out and test of system protection device~s and providing inspection of equipment under their cognizance.
Power Supply Technical Services is responsible for providing to System Protection certain setpoint and checkpoint values for protective devices.
1.2.11 Inventory Resources The ,Inventory Resources" Department is responsible for the receipt, handling, storage, shippin and issue of items received at the plant site for control by Inventory Resources.
This responsibility encompasses spare and replacement parts and components for plant equipment through all phases of plant life.
TOPICAL QUALITY ASSURANCE REPORT TQR 1. 0 Rev.
10 ORGANIZATION June 10, 1987 Paga 29 of 32 (Cont' J
1.2.11 Inventory Resources During operations, Inventory Resources also performs additional quality related activities such as handling and segregation for nonconforming items received for stores control. The Manager of Power Plant Stores reports to the Manager of Inventory Resources who reports to the Director af Procurement and Material Management as shown in Appendix A, Figure 1-1.
1.2.12 Company Nuclear Review Board The Company Nuclear Review Board (CNRB) reviews or directs the performance of reviews of activities concerning the technical aspects of the operating nuclear power. plant insofar as they impact on plant safetyg> the health and safety. of the pnhlicgi and laws, regulationsg and licensing commitmerits. In addition, audits of these areas are performed under the cognizance of the CNRB. Where necessary, the Board may use consulting services to perform required reviews. The management level to which the CNRB reports is illustrated in Appendix A, Figure 1-1. Its I composition is delineated in Section 6.0 of each facility's Technical Specifications. 5 asa o I V cs- pre S s s s l e ++ rC s f p>~~r cd <<s.fr~c+po~, To~e.r V~+
~~ g y ~~~~CrSA lp CJ~ACP S A1 PeeP Crr+ sa]+ V<CZ Pr+ i Vga,(sue.v pc,r cprm Sh e nels Sub)ects within the purview of the Board. are listed in the appropriate plant Technical Specifications. The CNRB has the authority to carry out its responsibilities by way of written action letters, verbal direction, minutes of meetings or cs appointed subcommittees.
es ce D
Vl C
0 Z
Ol cII E
h 0
TOPICAL QUALITY ASSURANCE REPORT TQR 1. 0 Rev, 10 ORGANIZATION Date June 10 i ].9S7 Page 30 of 1.2.13 Nuclear Fuel The Nuclear Fuel Section (FRN) of the'Fuel Resources Department is responsible for the procurement, management, and accountability of FPL's nuclear fuel assets, and for providing technical support to fuel users within FPL. The Nuclear Fuel Section is under the direction of the Manager of Nuclear Fuel who has the responsibilities described below:
o Forecasting FPL's nuclear fuel requirements and the availability and price of nuclear fuel; 0 Preparing the procurement specifications for components of the nuclear fuel cycle; o Determining sources of supply and evaluating alternatives; o Making commercial arrangements, . including contract negotiations with vendors for acquisition, processing and delivery of nuclear fuel and related services for the nuclear fuel cycle; 0 Assuring that technical and quality requirements including inputs from other FPL departments are incorporated in fuel contracts and letters of authorization and that these documents have the necessary approvals; io Administering and managing contracts for nuclear fuel and related services to assure that contractual obligations are met, and serving as FPL liaison in all matters of nuclear fuel and fuel related contracts; o Performing audits and coordinating accountability reporting on all nuclear fuel; 0 Providing support to the QA Department for their auditing of nuclear fuel design and fuel assembly manufacturing;
TOPICAL QUALITY ASSURANCE REPORT TQR 1.0 Rev. 10 ORGANIZATION June 10, 1987 Page 3] of 32 1.2.13 Nuclear Fuel (Cont'd) o Performing fuel management and safety analyses of nuclear cores to support plant licensing; o Development and/or . review of fuel and nuclear physics design; o Performing the pro)ect management function with respect to nuclear fuel; o Provide and maintain benchmarked computer codes and procedures available for Fuel Resources line functions and-other departments for daily use in maintaining records, performing safety analysis and core design, reporting of off-site nuclear fuel management activitiesg and providing economic data; o . Maintain effective and controlled computer access to Nuclear applications systems; o Develop and provide, to appropriate FPL groups, information necessary to determine FPL's fuel. related costs and to finance fuel related expenditures; o Reviewing core related changes to Safety Analysis Reports and Technical Specifications for compliance with design criteria and regulatory requirements; o Participating kn start-.up physics tests'nd providing other technical support for operating nuclear power plantsg s o Planning, maintenance and implementation of the Corporate Special Nuclear Materials program.
Cu The Manager of Nuclear Fuel reports to the Director of Fuels as
~s shown in Appendix A, Figure 1-1.
lh C
0 Z
ce E
~ 0 IL
TOPICAL QUALITY ASSURANCE REPORT TQR 1.0 Rev. 10 ORGANIZATION June 10, 1987 Pa9e 32 of 32 1.2.14 Corporate Records Services The Manager of Corporate Records Services is responsible for:
ensuring the QA records program activities are managed in accordance with applicable laws and regulations; assisting with the development and implementation of effective and compatible records and micrographics programs; developing, approving and maintaining record retention schedules; establishing parameters for indexing in the corporate records computerized Record Management System (RMS); locating acceptable record storage areas when requested; storage, retrieval and control of records/documents as reqested by other departments; leading the evaluation of specially designated "QA approved" storage facilities and maintaining the records of this evaluation. The Corporate Records Services organization is shown in Appendix A, Figure 1-1.
1.2.15 Documentary Files The Supervisor of Pocumentary Files is responsible for receiving, maintaining, .retrieving and storing the QA recor'ds in connection with licenses and contracts received from other departments. The Documentary Files organization is shown A, Figure 1-1. in'ppendix
TOPICAL QUALITYASSURANCE REPORT TQR 10.0 R ev.
INSPECTION 3une 10, 1986 A POWER 8 LIGHT COMPANY Page 2 Of 5 10.2.1 Inspection Responsibilities (Cont'd)
~a el CLQ C. ~ e+
C For these plant modifications, the Construction Department may delegate the establishment and execution of this program to a contractor or other designated FPL representative, but shall retain ultimate responsibility for the program. For preoperational start-up and testing of plant modifications, Nuclear Energy personnel may report functionally to the Project Site Manager and establ>sh plans, schedule@and procedurally required inspection, witness or hold points. In all cases, the personnel performing the inspection shall be independent of the group performing the work. The Construction ypg~ eqcjgg N4 H7 Department shall also be responsible for performing receiving and process verification inspections for work under the jurisdiction of the Project Ceneral Manager, or as requested by the Plant Manager.
P ' 'I"'P within their purview during operations. Inspections shall be performed in accordance with approved, written procedures by qualified personnel.
Quality Procedures and Quality Instructions shall be written which delineate the requirements and responsibilities for the performance of inspections.
10.2.2 Inspection Plans and Schedules Documented inspection plans may be either a separate document or an integral part of work instruction documents. The plans shall be based on design specifications, procurement documents, drawings, other specificationgsor previous experience; as appropriate. Inspections shall be scheduled to assure that sufficient time and resources are available; and to assure inspections are not inadvertently omitted or bypassed.
TOPICAL QUALITYASSURANCE REPORT 10.0 TQR Rev.
INSPECTION Date June 10, FLORIOA POWER 4 LIGHT COMPANY Page I rf 5 10.1 GENERAL RE UIREMENTS A program for inspection shall be established and executed by or for FPL to verify conformance with the documented instructions, procedure~cd drawings
. for accomplishing an activity. Such inspections shall be performed by individuals or groups other than those who performed .the activity being inspected.
Examinations, measurement~and tests of materials or products processed shall be performed for each work operation, where necessary, to assure conformance to established requirements. If direct inspection of processed materials or products is impossible or disadvantageous, indirect control by surveillance ar-monitoring shall be provided. Mandatory inspection, witness, or hold points beyond which work shall not proceed without the consent of FPL or a designated representative shall be indicated in the appropriate documents.
10e2 IMPLEMENTATION l0.2.1 inspection Responsibilities For plant operations activities, a program for on-site inspection of activities affecting quality shall be established by the Nuclear Energy Department.
Nuclear Energy shill perform inspections, surveillance~and monitoring of plant activities and plant operations as required by established plans, schedule~and/or procedurally required inspection, witnes@or hold points.
I IN all cases, the personnel performing the inspection shall be independent of the group performing the work.
For plant modifications assigned to Project Management Department or when requested by the Plant Manager, a program for on-site inspection of these activities affecting quality shall be established and executed by the Wgg srs ~5'r ~m C M, Construction Department to ensure conformance with documented instructions, procedures and drawings.
TOPICAL QUALITYASSURANCE REPORT T R l00 Rev.
INSPECTION Oate FLORIDA POWER S LIGHT COMPANY 3une l0, 1986 Page of I0.2e3 Inspection Personnel aa Inspections shall be performed by individuals other than those who performed or directly supervised the activity being inspected.
Inspection personnel shall be qualified and certified in accordance with appropriate codes, standard~ and/or company training programs.
Qualifications and certifications shall be kept current.
- b. Prior to performing inspections, inspection personnel shall have access to the drawings, procedures, specification~ or other documented criteria necessary for performance of the inspection.
10.2.0 Inspection Procedures aa Required inspection, surveillanc~or monitoring activities shall be performed and documented according to written, approved instructions or procedures. Inspection procedures, instruction~or checklists shall contain the following:
o Identification of characteristics to be inspectedo o Identification of the individual or groups responsible for performing the inspectio~ '
Acceptance criteria or reference to the acceptance criteria '
A description of the method of inspection~ '
Verification of completion and certification of inspection.
- b. Inspection records shall identify:
o Inspector or data recorder~
~
TOPICAL QUALITYASSURANCE REPORT Rev.
INSPECTION Date FLORIDA POWER a LIGHT COMPANY 3une 10 1986 Page of 5
10.2.0 Inspections Procedures (Cont'd) o Method or type of observationsg
~
o Test or inspection results' o Statement of acceptabilityg '
Date of observation@
o Deficiencies and nonconformances, and the action taken in connection with these deficient conditions, either by inclusion or by reference to other documents.'
Inspection procedures shall be reviewed by QC personnel to determine the need for an independent inspection and the degree and method if such an inspection is required, and to assure the identification of inspection personnel 'and the method of documentation of inspection results.
- d. Written approved instructions shall specify sQrveilhnce or monitoring of. processing methods, or'testing and operation of equipment when inspection is impossible, inaccessible or not applicable.
r
- e. Modification, repair, replacement or rework items shall be inspected in accordance with original inspection requirements or acceptable alternatives.
TOPICAL QUALITYASSURANCE REPORT I 0.0 TQR Rev. 7 INSPECTION gune IP, I936 FLORIDA POWER 1 LIGHT COMPANY Page 5 of 5 I0.2.5 Inspection, Witness, and Hold Point Identification Appropriate inspection, witnes~sor hold points shall appear in process documents (e.g., construction, testing, operating and maintenance procedures). These process procedures are subject to the review of the appropriate Quality Control organization for adequacy of inspection, witness, and hold points.
IVtandatory hold points shall be used when witnessing and inspecting must be performed and signed-off by the responsible personnel before work can proceed.
FPL shall indicate FPL witness or hold points applicable during the manufacture of an item in procurement documents. A distinction shall be made between witness points and mandatory hold points.
I C
TOPICAL QUALITYASSURANCE REPORT TQ'R 15.0 Rev.
NONCONFORMING MATERIALS, Date 3une 10, 1986 FLORIOA POWER 4 LIGHT COMPANY PARTS OR COMPONENTS of Page 1 15.1 GENERAL RE UIREMENTS Measures shall be established to control materials, parts, or components which do not conform to requirements in order to prevent their inadvertent use or installation. These measures shall include, as appropriate, procedures for identification, documentation, 'egregation, dispositio~ and notification to affected organizations. Nonconforming items shall be reviewed and accepted, rejected, repaired or reworked in accordance with documented procedures.
15.2 IMPLEMENTATION 0 15.2.1 Program Quality Procedures and Quality Instructions shall define the responsibilities and methods for identifying, documenting,. segregating and dispositioning nonconforming items. For procedure review requirements, see TQR 2.0 and TQR 5.0. Each department shall be responsible for the identification, controg and disposition of nonconformances within the scope of their departmental responsibilities.
Throughout plant life, FPL may delegate any portion of the identification .
and control of nonconforming items and services to an Architect/Engineer (A/E), constructor, NSSS vendor or other'contractors. In any case, the responsibility for assuring that requirements are met, and shall FPL'etains assure that the contractor's actions conform to requirements set by'FPL.
TOPICAL QUALITYASSURANCE REPORT TQR 15.0 Rev.
NONCONFORMING MATERIALS, Date 3une 10, 1986 FLORIDA POWER d LIGHT COMPANY PARTS OR COMPONENTS of Page 2 15.2.2 Documenting and Controlling Nonconformances All nonconformances in safety related items shall be documented and reported for corrective action. Measures shall be delineated in Quality Procedures and Quality Instructions which control further processing, installation, or operation of nonconforming items. These measures shall include:
- a. Physical identification of the item as nonconforming.
- b. Segregation of nonconforming items until properly dispositioned.
)Vhere physical segregation is not practical, suitable tags, marking or documentation shall be used to assure control.
15.2.3 Documentation Documentation of the nonconforming item shall: identify the item; describe the nonconformance; show disposition of the nonconformance and inspection requirements; and include the signature of the person approving the disposition.
15.2.0 Evaluation and Disposition Ei**" "*' 'E~
or the delegated contractor organization, as specified by procedure, shall evaluate nonconformances and disposition them based on tlie results of the evaluations. These evaluations and dispositions shall be reviewed, approved and documented in accordance with procedures.
TOPICAL QUALITYASSURANCE REPORT l 5.0 TQR R ev.
NONCONFORMING. MATERIALS, Da<<3une l0, l986 FLORIDA POWER 4 LIGHT COMPANY PARTS OR COMPONENTS of Page 3 15.2.0 Evaluation and Disposition (Cont'd)
An evaluation to determine the disposition of nonconforming items shall be performed. The evaluation shall determine whether an item is to be accepted as-is, repaired, reworke+or rejected. A technical evaluation shall be performed when an item is accepted as-is or is repaired to an acceptable condition. Records of the disposition of these items shall be made part of the nonconformance report. This evaluation shall assure that the final condition does not adversely effect safety, operability or maintainability of the item, or of the component or system in which it is installed.
The A/E, or other contractors on-site, shall be required to inform the FPL pfggaapc Mc H P Construction or Nuclear Energy Department prior to use or installation of a nonconforming item. The nature and extent of a nonconformance and the reason for proposing its use or installation shall be jus'tified. Nonconforming items dispositioned "accept as-is", or repaired to an acceptable condition, shall be so identified. Nonconformance reports for those items shall be made part of the item records and forwarded with the material to FPL.
Thc deter Inina tion of the need and the advisability o f releasing nonconforming materials~ is made by the Power Plant Engineering, gaaapam e w I items, Construction+or Nuclear Energy Departments. The following factors may be appropriate considerations in making this determination:
- a. Effect on the orderly progress of work if material or items are released;
- b. Safety of personnel; c, Suitability of material or items in "as-is" condition, i.e, probability of eventual satisfactory resolution of the nonconformance without repair, rework, or replacement; Z
Ol
~ ~
CV a
O 4
TOPICAL QUALITYASSURANCE REPORT TqR S5.O Rev.
NONCONFORMING MATERIALS, Oate June 10, 1936 FLORIDA POWER 8 LIGMT COMPANY PARTS OR COMPONENTS Page of Q
15.2.0 Evaluation and Disposition (Cont'd)
- d. Accessibility of material or items after release;
- e. Cost of removal and repair of replacement should material or items eventually have to be removed, repaired, or replaced;
- f. Impact on plant safety.
Items shall be reworked or repaired in accordance with documented procedures and shall be verified by reinspecting the item as originally inspected or by a documented method which is at least equal to the original inspection method.
Quality Assurance or Quality Control personnel shall periodically review nonconformance reports to identify quality trends. The results of these analyses shall be reviewed with appropriate members of upper level management.
tw S IDEN I CICCUf TICE t14$ IDlsl ill VICE taCSIDEN'I TICC SINIOA tal ~ IDENT TICE COAOAA C AESIOENT NAIICCS AN0 f IWAIC AICNIEF OFFICE ~
Se. I Or Ulcc tMSIDcaf OUALITI ASSVAMCE CDM I'IIEC
~
NWLCAA UICC tal ~ IDlsl ONOAOI
~CO DIAICfOA FO /C Cow f AAC I 5 TICC talllolal
~
OIAECIOA OF
~ AOCUAINEST lsfla Aao AL I CoatlsAIE SAaASL 1 SCCAEIM'I NAaslla Of tVACUA5 I IN ylct PrtD,la~ f el Coatoaalc CONIAACI0 Pf,~a Pt Pfst 5 4 ~
ISA J.a ~ I ~ SANALEA Of Neo ~ UUUAINIIIN 4 I Iselsfoae NANALIA of SUtlarlfoa of ACSOUACES Eoatoaaf AECOAOS 4
541IICCS OOCINICNIMT I Illl Coatasf NWLEM OISEC'Ioa Of 1Cellr 40110 SlCLO NANALEA Of r OIAEC'los Of CNIEF lallaCIA DUTEIDC 0114CTOA Of toela tLANI Coal IAWT ION toe41 tLAsf C Os 5VL IMI 5 taoUECIS OI1ICfOA OS 5 IDAE5 lael1oalCNIAL ASSAI 1 ~
aawsla of NUCLCAA SWL Nass441 Of NANALI1 taorccf CINEMA Coat AN' NANA541 OI
~ LMI CONS I 1 W I I ON SANASC 1 IN'I I 1 DMIN IAI. I NI I aowsl N I AL Ol ~ ECIDO coslfawlloN OC, elLO Alro NOI Iw siffle aaout ECNNICAL $ 41IIC45 toela SWtLT ga cosSfawf los 5 IAF f OC SAOUECT 'ICAa 4 SWEOINTESOESI Cooaolsafoa NMASIA Of NANASIA OI CT I 4 sr I 1 ossl s fAL ItCAalfllso Ne I aolsll s I AL AISOUACI5 ~ ~
~ \ AMIN4 taolaasl SANIS I 4 5'elf taollllcalos CON 5 I1 VC I I oa ~ 10ACI 00 tEASONNEL SWEAT I 501 NANASEA OIACCIM DIAECIOA tLMNI NO aw NUCLEAA NUCLlw 4UAL I I I CONTAOL LICENEIW ASSVAANCC MMSIA Of toeC1 SWtLT IECNN ICAL SlarlCES INE Llell III SW41elloa Csf A
~ ELDINS SW C 1 I 1 I4 sol 1 f 5JVC et IVALEI toINf NANASCO NUCLCM Si Let raalsmIANCE Nasally M
ENCMT SEATICll Sf LLCIE
~ SWEE IWCLEM 4AM I IN SFEC If C ~ Ill Isl 5 AS I ~ I I os Iflf Fs Stlclflc SIIE DAASAANIIAIIDN NIINSNEMTIM lb) Safer assasla of INOE N I I IEAINNAEAA SWI1 I Nfl INLNI EWE 1 I N I NANASI 1 MENSA Ol SIC IE ovAL I le ASIUAANCI rase 41 taocsalalsl ~
$ 41elCES IUALET SOINI AIL I IN I L I I I NU Ear 5 OUAI I I 'I A55UAANCI I SNSSAAN alelcs LI I Iae COMI I'lC AEVI I OAFAC I TOPICAL QUALITY ASSURANCE REPORT OALMIIAIIONOf OESMINESI ~
III I~
AFFECT INO OVALITT Ml~ Ill~ Il SISUAC I I acre ~ rl, ~
attCINIE 1 CAO OC SA'I'Iltllal
~ lit~tf TICE Patslaal POINT PLMT NANAOEN st1TICts NANAOEN OITE PAILNCT Sift ENOINEE1IW WCLTM NOCLEM NANAOE1 NANAOE1
~ LMT SECNNIIT SINE MONCIIM ETT ENOINEEOI
~ IptafloM SNPE NT I SM ~ AOW CNAIMM MCLEM MEIT COMITTtt OPEMTIOW ~ NALITT TtOel I CaL TMINIW Nalanaaatt t
SINE 0 I 4 I WE 1 I CMTML OEPMTMNT ~TIOM MStalaf tMENf NNCLEM OIPEOTI Ma ~ NPEAT I OM NNCLEM NEAl f1
~ ATTICS MAC f01 SINEATISM OPEMTIOW soptaf lsoa Catalsfaf ONPENT I Ma ItOTASS CNI I CAL I WTNOMNT ~ INEAIN EINNNT SNPEOINTEMENT SOPEAT I SM AW CMTAOL MCNMICAI. tltCTAICAL soft sf I soa NAINTENANCE NalaftNANCE WCLEM WCLEM M
NAO I A f I ON 1EACION Oust AT I sos MO I 4 MIST 410 I t C I I ON EWINIEN MCltM CMNI~ I TECW ICAL I SMI NOT I SM IWCLEM NATCN EWINEEN I MO I NNCLEA1 Csaf10L CtNIl1 OPtAA'lsa IAOI INN. I Ct Alto OPEMTMS TOPLCAL QUALITY ASSURANCE REPORT TUNEET POINT NUCLE4h I SITE OhsaNIZATION S/lo/M FISUNE I 4PPENOIX 4 PAM ~I C40 OC G4-1 424$ 240
I t KER ~
~
KEE MRS
~
~ ~
s r I
e
+'
TOPICAL QUALITYASSURANCE REPORT APPENDIX E Rev.
9 LIST OF CORPORATE QUALITY Date F LORIOA POWER d LIGHT COMPANY ASSURANCE PROCEDURES 3une 10 1986 lo P NUMBER/TITLE SECTION DESCRIPTION
- l. l CANCELLED 2.1 CANCELLED (Terms and Definitions contained in the QA Manual Glossary) 2.2 REVISION OF THE TOPICAL QUALITY Provides instructions for the revision of ASSURANCE REPORT the Florida Power R Light Company Topical Quality Assurance Report .
(FPL TQAR).
2.3 Describes the instructions and methods QUALITYASSURANCE PROGRAM used for establishing, preparing, issuing, REVIEW revising and controlling Quality Procedures employed in supporting quality requirements.
2.0 PREPARATION AND REVISION OF Provides the responsibilities, guidelines QUALITYINSTRUCTIONS and methods used for developing and revising Quality Instructions, based upon QP's, that involve quality activities within a department or organization and are unique to that activity.
2.5 QUALITYASSURANCE INDOCTRINATION Describes the requirements for the AND DEPARTMENTAL TRAINING indoctrination and training of personnel r
who perform, or are responsible for activities that af feet quality.
2.6 CANCELLED 2.7 IDENTIF!CATIONOF NUCLEAR SAFETY Describes the development and approval RELATED AND SAFETY RELATED DESIGN of documents identifying safety related FEATURE STRUCTURES, SYSTEMS and safety related design feature COMPONENTS AND SERVICES structures, systems and components.
TOPICAL QUALITYASSURANCE REPORT APPEN E R ev.
LIST OF CORPORATE QUALITY Date FLORIDA POWER k LIGHT COMPANY -
ASSURANCE PROCEDURES 3une 10 Page of 2 10 P NUMBER/TITLE SECTION DESCRIPTION 2.8 CLEANLINESS CONTROL METHODS Provides criteria for securing good house-keeping. Assigns responsibilities for assuring that the cleanliness of material, systems and structures is maintained.
2.9 QUALIFICATIONOF QA AUDIT, QC Describes the personnel qualifications that INSPECTION AND CONSTRUCTION TEST are required to assure that competent QC PERSONNEL inspectors, QA auditors, and construction test personnel perform these respective functions.
2.10 HOUSEKEEPING FOR Describes the responsibilities and controls OPERATING PLANTS for housekeeping at operating nuclear power plants.
2.11 CANCELLED 2.12 FPL QA PROGRAM APPLICABILITY Identifies the applicability of the FPL FOR FIRE PROTECTION SYSTEMS Quality Assurance Program for Fire Protection Systems.
2.13
'PROCESSING OF NRC CORRESPONDENCE Describes the system for providing responses to NRC initiated action requests.
2.10 IMPLEMENTATIONOF ASME XI Describes the program and responsibilities g
t l7 En~nonmenhaI Qualgiach~(Q) for controlling activities defined by ASME Section XI.
~~I EI"'P"~
3.1 ~ate+~
J+~ +emOinR~winq~e trier f ~~Qhoi)iKec OIt J t+pIl C.
m~VIVOnn chal CANCELLED
)ukfACdtbi~ d0 Augmf ~~1~ ~Q~MI~>>- ~
3.2 Q IDENTIFICATIONAND CONTROL OF Describes measures employed for 4
, DESIGN INTERFACES identifying and controlling design I
K interfaces, changes in design II interfaces, and modifications that cn af feet documents.
II Z
e
TOPICAL QUALITYASSURANCE REPORT APPENDIX E Rev. ~
. LIST OF CORPORATE QUALITY Date FLORIDA POWER a LIGHT COMPANY ASSURANCE PROCEDURES
'une 10 1986 Page of 5 lo 6i7 Go<<o/
tel o w u a I a o,
ev ov
~oI'o+o/0 r (Qg c+\ I CJ fest'rc~c~ h +r ega Vo vHA<4~$ 4ropcrWOs+cpgggrq+(gee ~
'etrft ~ I/7~ 4
~
Scca /laic<< I X Kf op~<< 1 l4% 7&4 7 I DESCRIPTION&7'ECTION 7.1 RECEIPT INSPECTION OF MATERIALS, Provides instructions for receipt PARTS AND COMPONENTS AT THE PLANT in'spection of materials, parts and SITE components which have been obtained for use in nuclear safety applications at the operating plant site.
7.2 CANCELLED 7.3 CANCELLED 7.0 EVALUATIONOF SUPPLIERS OF SAFETY Provides standards, measures, and guide-RELATED ITEMS OR SERVICES lines for the evaluation of QA Programs of contractors or suppliers supplying items or services.
7.5 CANCELLED 7.6 ACCEPTANCE OF ITEMS u SERVICES Describes the responsibilities and I
requirements for accepting nuclear safety related items or services that are being procured for nuclear power plants.
7.8 REVIEW AND DISPOSITION OF Describes the responsibilities and SUPPLIER DEYIATION NOTICES requirements for the review and disposition of nonconformances identified within a supplier's facility which have resulted or will result in an item which does not fully comply with the FPL procurement document quality and technical requirements. This procedure applies to purchased items which have not yet been shipped.
3.1 IDENTIFICATION8 CONTROL OF Delineates measures for assuring trace-MATERIALS, PARTS AND COMPONENTS ability, identification and control of.
AT THE PLANT SITE items from the time they are received through usage at operating plants.
ge ~ Jo r $ 0%<ctg r 4
co~ Pro, o o n- s e~@
- a. S g+c~ 0 sJ<<vC pa ~ vw ~o(o (S p ro c~ ot 4.(e prov 4c'a i'd@
/ y co~Vra c o r l o&o pfov~ e ~ Te
/ +S 4 q~/A 4.
TOPICAL QUALITYASSURANCE REPORT Rev.
LIST OF CORPORATE QUALITY Date FLORIDA POWER aL LIGHT COMPANY ASSURANCE PROCEDURES June 10 1986 Page of 6 10 P NUMBER/TITLE SECTION DESCRIPTION 8.2 CANCELLED 9.1 CONTROL OF SPECIAL'ROCESSES Delineates the responsibilities of organ-izations and personnel, and the control and
,documentation of special processes that.
are applied to safety related items.
9,2 C a n c.w /few (~ I 'ag Des es measures to assu equate control o s eci cesses applied to,.
safety rela s during the operating ph nuclear po lants.
9.0 CONTROL OF iVELDINC FOR NUCLEAR POPOVER Delineates responsibilities and require-PLANTS ments for control FPL welding processes for nuclear power plants.
10.1 CANCELl,ED 10;2 CANCELLED 10.3 INSPECTION AND SURVEILLANCE Delineates responsibilities and requirements for the inspection and surveillance of safety related plant maintenance activities, operation of
'afety related systems, and fuel handling activities.
10.0 CANCELLED 10.5 CANCELLED 10.6 CANCELLED
TOPICAL QUALITYASSURANCE REPORT APPENDIX E Rev.
9 LIST OF CORPORATE QUALITY Date FLORIDA POWER d LIGHT COMPANY ASSURANCE PROCEDURES 3une 10, 1986 Page of P NUMBER/TITLE SECTION DESCRIPTION pe+ (c. ~( <<'~ ~eW jf, Q) s 'es measures to assure contractor 'n of sa related material durin phase is rolled, accom 'd, t construction and II 2 c.~ ce ~~~CI (c.o 6, ~~ m i+ II 'I) ented.
cription of the procedures and pra 'mployed b 's to control testing of plant and material that are with e scop the QA Progra ring the plant opera e.
A
(( ~~Xi( a4I ~(Q II ')I the procedures actices employe ate the capabilities of a nuc ant isfy safety related rmance specifications.
11.0 TEST CONTROL Defines the measures for control of proof test prior to installation, construction tests, preoperational tests, startup tests, operational tests and retosts following repairs, replacements or modificatioI(s for nuclear safety related systems, structures, and components.
12.1 CALIBRATIOHAND CONTROL OF Delineates the responsibilities for MEASURING AND TEST EQUIPMENT implementing the described program for maintenance, calibration and control of measuring and test equipment (MATE).
12.2 CALIBRATIONCONTROL OF INSTALLED De'scribes the calibration program, PLANT INSTRUMENTATION AND CONTROL delineates responsibilities, and ..
EQUIPMENT. establishes procedures for control over the calibration of installed instrumentation and plant control equipment.
C 4
Z Ol Cll e
0 4
TOPICAL QUALITYASSURANCE REPORT APPE Rev.
9 LIST OF CORPORATE QUALITY Date FLORIDA POWER 4 LIGHT COMPANY ASSURANCE PROCEDURES 3une 10 1986 Page of 8 10 P NUMBER/TITLE SECTION DESCRIPTION 13.1 HANDLING, STORAGE AND SHIPPING OF Establishes responsibilities and procedures MATERIALS, PARTS AND COMPONENTS to assure that measures are employed by FPL and contractors to: (1) control the handling, shipping and storage of material; (2) protect the quality of material by using proper handling, shipping, and storage techniques; (3) effectively control the disposition of discrepant items.
13.2 CANCELLED 13.3 CONTROL OF RESERVED CENTRALLY STORED Provtdes the requirements for the issuance ELECTRICAL CABLE and controls of centrally stored electrical cable for use in all operating nuclear power plants.
10.1 INSPECTION, TEST, AND OPERATING Specifies the respective responsibilities STATUS DURING PLANT OPERATION of FPL personnel and the measures employed for iden ti fy ing the s ta tus (Inspection-Test-Operation) of plant structures, systetns and coInponents.
10.2 t INSPECTION TEST AND OPERATING Provides requirements and responsibilities STATUS DURING PLANT CONSTRUCTION for the identification of the inspection, test and operating status of plant equipment up to turnover of the plant 4c v LeffeCX CC~>I 1~/ to the operating organization.
cifies the responsibilities of depar ts and the proc or exercising c 1 ov aterials, structures, or a ' that do not conform to ecifications at inadv nt use or installation ot le