gC~CVMRATED DISIBUTION DEMONSTRXOON SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR: 8803250178 DOC. DATE-88/03/14 NOTARIZED: NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power. and Light C AUTH.NAME AUTHOR AFFILIATION JULIAN,C.A.
Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION Florida Power E Light Co.
SUBJECT:
Forwards Exam Rept 50-250/OL-88-01 administered on 880126-28.
DISTRIBUTION CODE:
IE42D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Operator Licensing Examination Reports DOCKET 05000250 05000251 NOTES RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: AEOD/DSP/TPAB Q~DLBQ HFB10D RE FILE 02 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1
1 1
'1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME EDISON,G NRR MORISSEAU,D NRR/DLPQ/OLB10D RGN2 FILE 01 NRC PDR COPIES LTTR ENCL 1
1 1
1 2
2 1
1 1
S i'
'A TOTAL NUMBER OF COPIES REQUIRED:
LTTR 12 ENCL 12
March 14, 1988 Florida Power and Light Company ATTN:
Mr. C. 0.
h'oody Group Vice President Nuclear Energy Department P. 0.
Box 14000 Juno Beach, FL 33408 Gentlemen:
SUBJECT.:
TURKEY POINT NUCLEAR PLANT EXAMINATION REPORT 250/OL-88-01 I
The NRC administered examinations on January 26-28, 1988, to employees of your company at the Turkey Point Nuclear Plant; At the conclusion of the written examination, a copy of the exam was left with your staff; at the conclusion of the site visit, preliminary findings on the operating tests were discussed with those members of your staff identified in the Examination Report, Enclosure 1..
Copies of the written examination questions and answer key are included in this report as Enclosure 2.
Facility comments regarding the written examination are included in this report as Enclosure 3.
In accordance with 10 CFR. 2.790(a),
a copy of this letter and its enclosures will be placed in NRC's Public Document Room'.
Should you have any questions concerning this letter, please contact us..
Sincerely, (ORIGINAL SIGNED BY C. A. JULIAN)
Enclosures:
1.
Exam Report 50-250/OL-88-01 2.
SRO Exam guestions 5 Answer Key 3.
Facility Comments cc w/encls 1
Im 3:
- 0. Karch, Corporate Training Dir.
C; J. Baker, Plant Manager cc w/encls 1, 2, 5 3:
T. Finn, Site Training Director Caudle A. Julian, Chief Operations Branch Division of Reactor Safety bcc w/encls:
(See page 2) 880325017'g031~
PDR ADOCK 050002 0
V Dt".D
Florida Power and Light Company March 14, 1988 bcc w/encl 1:
D. McDonald, Project Manager, NRR B.
A. Wilson, Section Chief, DRP D.
Senior Resident Inspector 0 erator Licensing Branch, DLPg:NRR ocument Control Desk Battelle (PNL), Contractor RShaw:ht 2/~/88 RII DLew
/88 3 5 RI JAri ldsen g/P/88 UFMunro g/ P/88 RI C
ian
~88 g(((e