Advises That Rev 16 to Radiological Emergency Plan (REP) Consistent W/Provisions of 10CFR50.47(b) & Acceptable W/ Listed Exceptions.Faultily Worded Statement Exists in Section 4.6 Re Locations of Notification Telephones
ML17347A478
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/08/1987
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
References
NUDOCS 8705190267
Download: ML17347A478 (2)


Text

orida Power and Light Company

~

~

~

~

~

ATTN:

Mr. C. 0.

Woody Group Vice President Nuclear Energy Department P. 0.

Box 14000 Juno Beach, FL 33408 Gentlemen:

SUBJECT:

DOCKET NOS. 50-250 AND 50-251 TURKEY POINT PLANT RADIOLOGICAL EMERGENCY PLAN REVIEW We have completed our review of Revision 16 to the Turkey Point Plant Radiological Emergency Plan (REP).

The review indicated

that, with two exceptions, the changes contained in this revision are consistent with the planning standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR Part 50.

The referenced exceptions are (1) a faultily worded statement in REP Section 4.6 regarding locations of Emergency Notification System telephones, and (2) the apparently inadvertent deletion of the Technical Support Center (TSC) from the listing in REP Section 5.3.3 of areas in which frequent surveys are to be performed during emergency response.

In a telephonic discussion with Mr. J.

L.

Kreh of our staff on May 1,

1987, Mr.

G.

A. Casto of your staff committed to the incorporation of appropriate corrections to the cited discrepancies in the next REP revision.

Please be reminded that 10 CFR 50.54(q) requires that proposed changes which decrease the effectiveness of your Emergency Plan shall not be implemented without application to and approval by the Commission.

However, changes may be made without Commission approval if such changes do not decrease the effectiveness of the Plan, and if the Plan, as
changed, continues to meet the standards of 50.47(b) and the requirements of Appendix E to 10 CFR Part 50. If a change is made without approval, you should furnish copies in accordance with 10 CFR 50.54(q).
Also, any changes to the Emergency Plan Implementing Procedures should be made in accordance with the requirements of Section V of Appendix E to 10 CFR Part 50.

8705190267 870508 PDR ADOCK 05000250 F

PDR 0

Florida Power and Light Company Should you have any questions regarding this letter, please contact Mr. Thomas R. Decker of our staff on 404-331-2559.

Sincerely, ORfCrlNAL SIGN"D "Y D~Ut-LAS M, CC l.'lh,iS Douglas M. Collins, Chief Emergency Preparedness and Radiological Protection Branch Division of Radiation Safety and Safeguards cc: Q.

M. Wethy, Vice President Turkey Point Nuclear Plant W. J.

Baker, Plant Manager Turkey Point Nuclear Plant M. W. Bladow, Plant gA Superintendent P. Arias, Jr., Regulatory and Compliance Supervisor bcc:i/NRC Resident Inspector Document Control Desk State of Florida R

reh 5/OS'/87 RII~

TDecker fp/! 5/pA/87 RII

~

~v~

W lson 5/7 /87