ML17347A475

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-250/87-17 & 50-251/87-17 on 870406-10.No Violations or Deviations Noted
ML17347A475
Person / Time
Site: Turkey Point  
Issue date: 05/01/1987
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
Shared Package
ML17347A476 List:
References
NUDOCS 8705190215
Download: ML17347A475 (3)


See also: IR 05000250/1987017

Text

Docket Nos. 50-250,

50-251

License

Nos.

DPR-31,

DPR-41

Florida Power and Light Company

TN:

Nr.

C. 0.

Moody

Group Vice President

Nuclear Energy Department

P. 0.

Box 14000

Juno Beach,

FL

33408

Gentlemen:

SUBJECT:

NRC INSPECTION

REPORT

NOS. 50-250/87-17

AND 50-251/87-17

This refers to the Nuclear Regulatory Comission

(NRC) inspection

conducted

by

W. J.

Ross

on April 6-10,

1987.

The inspection

included

a review of activities

authorized

for your

Turkey

Point facility.

At the

conclusion

of the

inspection,

the findings

were

discussed

with those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined

during

the inspection

are identified in the report.

Within

t

these

areas,

the inspection

consisted

of selective

examinations

of procedures.

and

representative

records,

interviews with personnel,

and observation

of

activities in progress.

Within the

scope

of the

inspection,

no violations

or

deviations

were

identified.

In accordance

with Section 2.790 of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosure

will be placed in the

NRC Public Document

Room.

Should you have any questions

concerning this letter, please

contact us.

Sincerely,

t

Enclosure:

Inspection

Report

Douglas

M. Collins, Chief

Emergency

Preparedness

and

Radiological Protection

Branch

Division of Radiation Safety

and Safeguards

8705190215

870501

PDR

ADOCK 05000250

8

PDR

Florida

Power and Light Company

c

w/encl:

.

M. Wethy, Vice President

Turkey Point Nuclear Plant

. J.

Baker, Plant Manager

Turkey Point Nuclear Plant

A..

W. Bladow, Plant

gA Superintendent

A. Arias, Jr., Regulatory

and Compliance

Supervisor

bcc w/encl:

PRC Resident

Inspector

Document Control

Desk

State of Florida