ML17347A433

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-250/87-10 & 50-251/87-10 on 870209-0309.No Violation or Deviation Noted.Attention Directed to Paragraph 11 in Rept & Concerns That Address Adequacies of Engineering Evaluations
ML17347A433
Person / Time
Site: Turkey Point  
Issue date: 04/16/1987
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
Shared Package
ML17347A434 List:
References
NUDOCS 8705010180
Download: ML17347A433 (4)


See also: IR 05000250/1987010

Text

1

Docket Nos.'0-250,

50-251

License

Nos.

DPR-31,

DPR-41

~Florida Power

and Light Company

ATTN:

Mr. C. 0.

Woody

Group Vice President

Nuclear Energy Department

P. 0.

Box 14000

Juno Beach,

FL

33408

Gentlemen:

SUBJECT:

NRC INSPECTION

REPORT

NOS. 50-250/87-10

AND 50-251/87-10

This refers

to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

D. R. Brewer

on February

9 - March 9,

1987. 'he

inspection

included

a

review of activities

authorized

for-your Turkey Point facility.

At the

conclusion of the inspection,

the findings were discussed

with those

members of

your staff identified in the enclosed

inspection report.

1

Areas

examined

during the inspection

are identified in the report.

Within

these

areas,

the inspection

consisted

of selected

examinations

of procedures

and .representative

records,

interviews with personnel,

and observation

of

activities in progress.

Within the

scope

of the

inspection,

no violations

or deviations

were

identified.

Your attention is directed to Paragraph

11 in the report and the concerns that

address

the adequacies

of engineering

evaluations.

In accordance

with Section

2.790 of the

NRC's

"Rules of Practice,"

Part 2,

,Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosures

will be placed in the

NRC Public 'Document

Room.

Should you have

any questions

concerning this letter, please

contact us.

Sincerely,

87p5pi

c+ psppp25p

p1Sp 87p41~

PDR

ADO

PDR

8"

Original signed

by V. L. Brownlee

Luis A.'eyes, Director

Division of Reactor Projects

NRC Inspection

Report

cc w/encl:

(See

page 2)

ul

A,)

v

Florida Power and Light Company

APR i 6 io87

cc w/encl:

QC. N. Wethy, Vice President

Turkey Point Nuclear

Plant

C. g. Baker, Plant Nanager

Turkey Point Nuclear Plant

~L. W. Bladow, Plant gA Superintendent

B J. Arias, Jr., Regulatory

and

Compliance Supervisor

bcc-w/encl:

~NRC Resident

Inspector

Document Control

Desk

State of Florida

t

RII

RII

ristensen: vyg

ilson

I/@lBT

y/CIBT

0