I ~
.
April 16,
1987
Docket Nos.
50-250,
50-251
License
Nos.
f
Power and Light Companv
ATTN:
Mr. C. 0.
Woody
Group Vice President
Nuclear Energy Department
P. 0.
Box 14000
Juno Beach,
FL
33408
Gentlemen:
SUBJECT:
NRC INSPECTION
REPORT
NOS. 50-250/87-02
AND 50-251/87-02)
This refers
to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
C. Smith
on
January
12-16
and
January
26-30,
1987.
The inspection
included
a review of activities
authorized
for your Turkey Point facility.
At the
conclusion of the inspection,
the findings were discussed
with those
members of
your staff identified in the enclosed
inspection report.
l Areas
examined
during the inspection
are identified in the report.
Within these
areas,
the
inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and observation of activities
in progress.
Within the scope of the inspection,
no violations or deviations
were identified.
Your attention
is invited to
an unresolved
item identified in the inspection
report.
This matter will be pursued
during future inspections.
In accordance
with Section 2.790 of the
NRC's
"Rules of Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and its enclosure
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this letter,
please contact us.
Sincerely,
DOCy. 05000250
00041
87041b
A
G
Enclosure:
(See
page
2)
(Original signed
by C. Julian)
I
Caudle A. Julian, Chief
Operation
Branch
Division of Reactor Safety
Florida Power and Light Company
April 16,
1987
Enclosure:
NRC Inspection
Report
j
cc w/encl:
C.
M. Wethy, Vice President
Turkey Point Nuclear Plant
J C. J. Baker, Plant Manager
Turkey Point Nuclear Plant
L.
W. Bladow, Plant
gA Superintendent
J. Arias, Jr., Regulatory
and Compliance
Supervisor
bcc w/encl:
NRC Resident
Inspector
Document Control
Desk
State of Florida
RII
C
i
- es
3//7/87
RMoore
RGibbs
3/ I l/87
3/ i )/87
RI I
GBelisle
3/( I/87
RI I
CJu, ian
3IIjl>>
3//0/87