Establishes Schedule for Implementing Fire Protection & Alternate Safe Shutdown Mods Required to Meet 10CFR50.48,per Generic Ltr 86-10.Mods to Be Completed by Unit 4 Refueling Outage,Currently Scheduled for May 1988
ML17347A394
Person / Time
Site: Turkey Point  
Issue date: 04/08/1987
From: Novak T
Office of Nuclear Reactor Regulation
To: Woody C
FLORIDA POWER & LIGHT CO.
References
GL-86-10, NUDOCS 8704140553
Download: ML17347A394 (6)


Text

Docket No. 50-250 and 50-251 Mr. C. 0.

Woody, Group Vice President Nuclear Energy Department Florida Power and Light Company Post Office Box 14000 Juno Beach, Florida 33408

Dear Mr. Woody:

Apri,l 8, 1987 DISTR I.BUT.ION NO1 NRC PDR ACRS (10)

Local PDR Gray File PADP2 Rdg.

T. Novak OGC-Bethesda E. Jordan B. Grimes J. Partlow N. Thompson D. McDonald

Subject:

Implementation Schedules for 10 CFR 50.48 Fire Protection Modifications - Turkey Point Plant, Units 3 and 4

Generic Letter 86-10, "Implementation of Fire Protection Requirements" stated that the NRC would (1) review the dockets of plants covered by 50.48 to determine the schedule deadlines for those plants and (2) inform licensees of those schedule deadlines.

We have reviewed the docket 'related to the schedule for implementation of 10 CFR 50.48 for Turkey Point Plant, Unit 3.

Based on that review, we have determined that the fire protection and alternate shutdown system modifications required to meet 10 CFR 50.48 are scheduled to be completed by the startup from the current refueling outage which is scheduled for May of this year.

We have.granted a schedular exemption for alternate shutdown common areas and procedures which are scheduled to be completed by startup of the Unit 4 refueling outage which is currently scheduled for May 1988.

Delays in completion of implementation beyond the schedular requirements of 10 CFR 50,48 will be allowed only under the exemption provisions of 10 CFR 50.12 explained in Generic Letter 86-10.

We have reviewed the docket related to the schedule for implementation of 10 CFR 50.48 for Turkey Point Plant, Unit 4.

Based on that review, we have determined that the fire protection and alternate shutdown system modifications required to meet 10 CFR 50.48 are scheduled by Florida Power and.Light Company to be completed by the startup of the Unit 4 refueling outage which is currently scheduled for May 1988.

Although the modifications'or alternate shutdown common areas and procedures were not completed consistent with the schedule requirements of 10 CFR 50.48, the plant has been allowed to operate because of your compensatory measures which have been approved by the NRC.

8704140553 870408 PDR ADOCK 05000250 F

PDR

H

'N'fj 'Ct wt'w "lw' 1

hl'h h

1 l Wh 1'

I'I'ITIttlv" Fw iw N II'l

~ F i<<P

<<N 1

\\

-,f

<<(

W.W'I N

h r" I N

l e

NMP I" I',,j

'P 11 N.,

W

~ ')

v I'pt N

P I"

N'I PW i I,

'r W

I t, ih t

h ~

.Hf n

1

~ l N ~

I W)'1 fl Itlt N

III Ph I<<t li W

llf. P P

i'

~ =yth PW, P' hNVMN II

<<MP I

It IP N rlt'I ll 1

w

,'1 h

ll t II (lt e

h. ~

W NN it N'

1 PM ii h

lh ll MN P

It I,

')hg IN'.

F'5 I NM

~

I N,

NIP>

Ntwvt hl hr',

,<<P/

lN

Mr. C. 0.

Woody 2

If the schedules are not correct, please contact the NRC Project Manager in writing within 30 days.

In addition, please notify the NRC Project Manager in writing if schedule delays develop and after you have completed the 50.48 modifications.

Sincerely, cc:

See next page oriR~na1 sLgn0Q by

+<~ la. R0v Thomas M. Nova%', Acting Director Division of PWR Licensing-A Office of Nuclear Reactor Regulation L:

P2 D

er 4/

87 M:PADg2 A

D A

DMcDonald:hc LRubenstein T

v 4/1 /87 4/ 8'/87 4/

/87

'll')

g/'f f1'E Elf I II 'f I

1 V'll

, I"fl'1 I~:)"'",

EE' f

EI'f) I 't 1

I 1

l f

~ II

'1ff Il P

~

IEE IPE Eq r,

I I'1E'I I

Mr. C. 0.

Woody Florida Power and Light Company Turkey Point Plant CC'arold F. Reis, Esquire Newman and Holtzinger, P.C.

1615 L Street, N.W.

Washington, DC 20036 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Norman A. Coll, Esquire

Steel, Hector and. Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Mr. C.

M. Wethy, Vice President Turkey Point Nuclear Plant Florida Power and Light Company P.O.= Box 029100 Miami, Florida 33102 Mr. M. R. Stierheim County Manager of Metropolitan Dade County Miami, Florida 33130 Resident Inspector'J.S.

Nuclear Regulatory Comnission Turkey Point Nuclear Generating Station Post Office Box 57-1185 Miami, Florida.

33257-1185 Mr. Allan Schubert, Manager Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.

Tallahassee, Florida 32301 Intergovernmental Coordination and Review Office of Planning Im Budget Executive Office of the Governor The, Capitol Building Tallahassee, Florida 32301 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Regional Administrator, Region II U.S. Nuclear Regulatory Commission Suite 2900 101 Marietta Street Atlanta, Georgia 30373 Martin H. Hodder, Esquire 1131 NE, 86th Street Miami, Florida 33138 Joette Lorion 7269 SW, 54 Avenue Miami, Flori da 33143 Mr. Chris J. Baker, Plant Manager Turkey Point Nuclear Plant" Fl.orida Power and Light Companv P.O.

Box 0?9100 Miami; Florida 33102 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304

~

~

i,