ML17346B262
| ML17346B262 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 10/28/1986 |
| From: | Walker R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Woody C FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17346B263 | List: |
| References | |
| NUDOCS 8611040401 | |
| Download: ML17346B262 (4) | |
See also: IR 05000250/1986037
Text
October
28
,1986
Docket Nos. 50-250,
50-251
License
Nos.
lorida Power and Light Company
ATTN:
Mr. C. 0.
Woody
Group Vice President
Nuclear Energy Department
P. 0.
Box 14000
Juno Beach,
FL
33408
Gentlemen:
SUBJECT:
(NRC INSPECTION
REPORT
NOS. 50-250/86-37
AND 50-251/86-37)
This refers
to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
F.
R.
McCoy
on
August 25-29,
1986.
The
inspection
included
a
review of
activities authorized for your Turkey Point facility.
At the conclusion of the
inspection,
the findings
were
discussed
with those
members
of,your staff
identified in the enclosed
inspection report.
t
Areas
examined during the inspection
are identified in the report.
Within these
areas,
the
inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and observation of activities
in progress.
The inspection findings indicate that certain activities appeared
to violate
NRC
requirements.
The violation, references
to pertinent requirements,
and elements
to
be
included
in your
response
are
described
in the
enclosed
Notice of
Violation.
Your attention
is invited to an unresolved
item identified in the inspection
report.
This matter will be pursued
during future inspections.
In accordance
with 10 CFR 2.790(a),
a copy of this letter, its enclosures,
and
any reply wi 11
be
placed
in the
NRC Public
Document
Room.
If you wish to
withhold information contained
therein,
please
notify this office by telephone
within ten
days of the date of this letter
and submit
a written application to
withhold information contained
therein
promptly thereafter.
Such application
must
be consistent with the requirement of 10 CFR 2.790(b)(1).
If we do not hear
from you in this
regard within the period specified
above,
this letter, its
enclosures,
and any reply will be
made available to the public and will be placed
in the
NRC Public Document
Room.
The responses
directed
by this letter
and its enclosures
are not subject to the
clearance
procedures
of the Office of Management
and Budget
as required
by the
Paperwork
Reduction Act of 1980,
PL 96-511.
861104040i
861028
ADOCK 05000250
G
QW
~
R
0
R
'
~
E
P
IItl
f
E/
tf
,lh
~
~
"
C
rw
K,
Hr
t ~
ll
~
~
II
~
II
~
~
r
'
I rttw
w,
ht
H
w
't'
h
>W,RR
".I .
4
W)r w
E
O'
~
~
rh
WEKR
H
I WIRE II
'I
w
w
,rr
w
~
w
I I ~
I
I'
t
I
lt
I
w
'Ih
IQ,
~ t
I
I 't
t
$
Ih Il
ltl
g
H
lh'7i
w RW
tl
r
~:
rw
ll
~
'
E
1
I
w
w
lh
~
w
w
R H
(ttt,
w
w (','I
I
h
I
h tt
ill I
lt9
w
W" r
w 3
~,
WW
Hw
~ I
~ 'I
'E
W
'h
'
E
Rrll
'
ti
W
I
Hr
II
Il wrt
W
Florida Power and Light Company
October
28,
19S6
Should you have
any questions
concerning this letter, please .contact
us.
Sincer ely,
(original, signed
by
DM<<er~elli)
Roger D. Walker, Director
Division of Reactor Projects
Enclosures:
1.
2.
NRC Inspection
Report
~
~
w/encls:
f
C.'. Wethy, Vice President
Turkey Point Nuclear Plant
C. J.
Baker, Plant Manager
Turkey Point Nuclear Plant
J
.
W. Bladow, Plant gA Superintendent
J. Arias, Jr.,
Regulatory
and Compliance
Supervisor
t
yacc w/encls:
PNRC Resident
Inspector
Document Control Desk
State of Florida
t
FMcCoy:lb
/86
t
BWilson
W/(6 /86
(o
RII
CJu
an
09/
/86
ID/i</@
RII
ciera
l0 ib/g(
RIIA
RII
SElrod
D
r
1'9/IE.
/ 6
'
T
IDI7
9
t
E