ML17346B258

From kanterella
Jump to navigation Jump to search
Insp Repts 50-250/86-40 & 50-251/86-40 on 860928-29. Violation Noted:Inadequate Compensatory Measures.Details Withheld (Ref 10CFR2.790 & 73.21)
ML17346B258
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/23/1986
From: Masnyk O, Mcguire D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML17346B257 List:
References
50-250-86-40, 50-251-86-40, NUDOCS 8610310200
Download: ML17346B258 (2)


See also: IR 05000250/1986040

Text

~FEGUAR98 INI'Oi>g)AT~Qy~

License

Nos.:

DPR-31

and

DPR-41

~8 >EGA

UNITED STATES

NUCLEAR REGULATORY"COMMISSION

REGION II

o<,

101 MARIETTASTREET

N W

iI

'

ATLANTA,GEORGIA 30323',~

l

P

">>*<<"

"

OCT 2B 1986'

I

FI

Report Nos.:

50-250/86-'40

and'50-251/86'-'40

I

Licensee:

Florida Power and Light Company

9250 West Flagler Street

Miami, FL

33102

Docket Nos.:

50-250

and 50-251

Facility Name:

Turkey Point

3 and 4

Inspection

Conducted:

September

28-29,

1986

Enforcement

Conference:

October 1,

1986

a

k, Physical

curity Specialist

Inspector:

Orysia

M.

Approved by:

D.

R. McGuire, Chief, Physical Security Section

Nuclear Materials Safety

and Safeguards

Branch

Division of Radiation Safety

and Safeguards

0-83-Pd

Date Signed

o-z3- b

Date Signed

SUMMARY

Scope:

This nonroutine,

special

inspection

involved

a review of scaffolding

which provided

a pathway

from the protected

area into a vital area,

discovered

by the Senior Resident Inspector

on September

25,

1986.

Results:

A violation of regulatory

requirements

was identified:

86-38-04,

Inadequate

Compensatory

Measures.

t

Sb10310200

PDR

ADOCK

8

Bb1023

05Q00250

PDR

]@~~~

sp

E~Mi'ifif ~ )'~j

I j7I

'<Vj'g

~~WE CONTAT~tp

~?ARA'PZOg pe.;

~ <~"~ E< OEC081'RO~gg

> ~ y w

kg

(, ~ q

~ 5

y