October 2, 1986 Docket Nos.:
50-250/251 Mr. C. 0.
Woody, Group Vice President Nuclear Energy Department Florida Power and Light Company Post Office Box 14000 Juno Beach, Florida 33408
Dear Mr. Woody:
DISTRIBUTION:
t;Docket Fi1e>
NRC PDR Local PDR PAD¹2 Reading T. Novak OGC-Bethesda E. Jordan B. Grimes J. Partlow N. Thompson D. McDonald D. Miller ACRS (10)
Tech Branch Gray File
SUBJECT:
GENERIC LETTER 85-15, "ENVIRONMENTAL qUALIFICATION OF ELECTRICAL EQUIPMENT IMPORTANT TO SAFETY FOR NUCLEAR POWER PLANTS"
REFERENCE:
TAC Numbers 60365 and 60366 By letter dated November 26, 1985, you requested clarification of Generic Letter 85-15, Information Relating to the Deadlines for Compliance With 10 CFR 50.49, "Environmental gualification of Electrical Equipment Important to Safety for Nuclear Power Plants."
On September 22, 1986, the staff issued Generic Letter 86-15, Information Relating to Compliance with 10 CFR 50.49, "Environmental gualification of Electrical Equipment Important to Safety for Nuclear Power Plants," which is enclosed.
The purpose of the Generic Letter is to provide additional guidelines on appropriate licensee actions in situations where environmental qualification of equipment is suspect.
The enclosure to the letter provides guidance in regard to the enforcement of 10 CFR 50.49.
I would like to note that the guidance provided for the actions to be taken has been approved by the Commission and the guidance relating to the enforcement aspects of 10 CFR 50.49 reflects the current Commission policy.
I trust you find this responsive to your concerns.
This completes our action related to the above TAC numbers.
Sincerely,
Enclosure:
As stated cc:
See next page Daniel G. McDonald, Project Manager PWR Project Directorate ¹2 Division of PWR Licensing-A AD ler:pab (S)$ i86 AD¹2:PM DMcDonald le/ t /86 PAD D
LRubensetin y/ S /86 sacoiooaae SS>00'DR ADOCK 05000250 lt PDR
~ ~
t lh CJ p
Mr. C. 0.
Woody Florida Power and Light Company Turkey Point Plant cco Harold F. Reis, Esquire Newman and Holtzinger, P.C.
1615 L Street, N.W.
Washington, DC 20036 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Norman A. Coll, Esquire
- Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Mr. C.
M. Wethy, Vice President Turkey Point Nuclear Plant Florida Power and Light Company P.O.
Box 029100 Miami, Florida 33102 Mr. M. R. Stierheim County Manager of Metropolitan Dade County Miami, Florida 33130 Resident Inspector U.S. Nuclear Regulatory Commission Turkey Point Nuclear Generating Station Post Office Box 57-1185 Miami, Florida 33257-1185 Mr. Allan Schubert, Manager Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.
Tallahassee, Florida 32301 Intergovernmental Coordination and Review Office of Planning 5 Budget Executive Office of the Governor The Capitol Buildinq Tallahassee, Florida 32301 Administrator Department of Envirohmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Regional Administrator, Region II U.S. Nuclear Regulatory Comnission Suite 2900 101 Marietta Street Atlanta, Georgia 30323 Martin H. Hodder, Esquire 1131 NE, 86th Street Miami, Florida 33138 Joette Lorion 7269 SW, 54 Avenue Miami, Florida 33143 Mr. Chris J. Baker, Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company P.O.
Box 029100 Miami, Florida 33102 Attorney General Depar tment of Legal Affairs The Capitol Tallahassee, Florida 32304