ENCLOSURE 1
NOTICE OF VIOLATION Florida Power and Light Company Turkey Point 3 and 4
Docket Nos.
50-250 and 50-251.
License Nos.
DPR-31 and DPR-41 The following violation was identified during an inspection conducted on February 12-15, 1985.
The Severity Level was assigned in accordance with the NRC Enforcement Policy
10 CFR 50.55a(g) requires that inservice testing, to verify operational readiness, of pumps and valves whose function is required for safety, be accomplished in accordance with Section XI of the ASME Boiler and Pressure Vessel (B
and PV)
Code.
ASME B and PV Code,Section XI, 1980 edition through Winter 1980 addenda, has been identified as the applicable code for inservice testing.
ASME B and PV Code,Section XI, Paragraph IWV-3415, requires fail-safe valves be tested by observing the operation of the valves upon loss of actuator power.
The Main Steam Isolation Valves have been identified as fail-safe valves.
Contrary to the above, inservice testing of pumps and valves and inservice inspection of components were not accomplished in accordance with ASME B and PV Code,Section XI, in that the Main Steam Isolation Valves were fail-safe tested with the instrument air actively connected to the valve actuators.
This is a Severity Level V violation (Supplement I).
Pursuant to 10 CFR 2.201, you are required to submit to this office within 30 days of the date of this Notice, a written statement or explanation in reply, including:
(1) admission or denial of the alleged violation; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved.
Security or safeguards information should be submitted as an enclosure to facilitate withholding it from public disclosure as required by 10 CFR 2.790(d) or 10 CFR 73.21.
MAR 6 1985 Date:
8504l60509 850306 PDR ADOCK 05000250 6
I
~
WP>>
W<<W>>
lr f>>
4 I II WI I II
~
'll
,f<<
IW, I"I V
))t '>>
IlP 1 J tt 1()l I 'I V-I I
Ij' hit I
j It tf)
I I'M ""
II)i tg IW f P
V fQ
'>>I 1>> 'r 1 W) W w<<
r>>'8hw
l' f
I WL V'
4t
" '+
l,l
~
'>>1 I I i' I.) 1'"'<<<
If'I lf >>
I W,tt' l Ill1, 1 l gf>>i hf I llw llI,'.>>
/>>Wc~ g
>>III9.
f>>
Wf )
ll 1 "4"
)Wtl ~
II.
1 "II"t'>>')
I V,W) A t
lt I
+
f "I 1,) I~Vgg>>>>
4 l>>MY W I, ll i g>>M'I; I
ll tf Nl M>>g
'Ip,)
4 J r<<r 1 g)ll IC>>>> ff'IMVW I
I) lt t-Wr.lq If I,
lI 1 1,>>!'gl
)I 1 )
4 fl'II',
Wt!
I I1 Vl nl)
>>II lIII II I lf
>> )
I I>>I'
~ 'P I
>>I W>>f 3>>'
It
) I'>>
I 4
WWI' WM P'll
."'I >>
S <<l 1
)
. I f ~ f
.->>>M>>
I r*
El