ML17346A715
| ML17346A715 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 12/14/1984 |
| From: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Williams J FLORIDA POWER & LIGHT CO. |
| References | |
| NUDOCS 8501180222 | |
| Download: ML17346A715 (5) | |
Text
Florida Power and Light Company ATTN:
Mr. J.
W. Williams, Jr.
Group Vice President Nuclear Energy Department P. 0.
Box 14000 Juno
- Beach, FL 33408 Gentlemen:
SUBJECT:
CONFIRMATION OF MEETING ARRANGEMENTS - TURKEY POINT DOCKET NOS. 50-250 AND 50-251 This confirms the telephone conversation between Mr. J.
A. Olshinski of my staff and Mr. K. N. Harris of your staff on December 6, 1984, concerning an enforcement conference to be conducted in the Region II Office on December 18, 1984, at 9:30 a.m.
We requested this meeting to discuss the auxiliary feedwater pump failure of December 3,
- 1984, and resulting issues identified in the enclosure to this letter.
A proposed meeting agenda is enclosed.
Should you have any questions regarding these arrangements, we will be pleased to discuss them.
Sincerely, ORIGIN4l SIGNED BV RICHARD C. LEWIS James P. O'Reilly Regional Administrator
Enclosure:
Proposed Meeting Agenda cc w/encl:
K. N. Harris, Vice President Turkey Point Nuclear Plant C. J. Baker, Plant Manager Turkey Point Nuclear Plant K. N. Jones, Plant gA Superintendent bcc w/encl:
NRC Resident Inspector Document Control Desk State of Florida 0$ $ 80p2Q 84 PDR ADOCK 05000250 8
- NOTE FOR CONCURRENCES, PLEASE SEE ATTACHED SHEET RII RII RII RII RII SElrod:km 12/
/84 VBrownlee JMPuckett JOlshinski RLewis 12/
/84 12/
/84 12/
/84 12/
/84
1<<
-gp 4
j 1
11" rhl P
~g 4
~ 4 k
f)P<<y<}il f
.'f (ii')
f )
I'.r f;),)
.}(<
1, I,
1
~ r}r.k<<"<<P<< f'
'I 4'Y 14
<< ~I}
h I V hk'4<<
}P
'"k
)
~ k "I"kf ll I
1 IO Iikt
}4.,
Pf I )'f 1
lip 1
4 krh Il 8
<<) }
<<1
~ N II
~ f
}<<I}
P}$
~
C 14"
~ <<}
. ")I..i
'1
vf 1'I
'1 1 }
C
., 4 }
1' I Q'4 4
II' l
'I Il
', 'r)"r,r i
- " fI
}:rk }}iii ) k-k '<<I "kk ~ kn
- f
- , Ir~
Il 4 ) Pk f <,'i g r, I', r}ati! +ah ) J 1 1 '}.kq} 1<<)Q I' 'i h <<P~h} -q } g <<4} I )F ) '4*) f<<11) JL 4 I<<
Florida Power and Light Company ATTN: Mr. J. W. Williams, Jr. Group Vice President Nuclear Energy Department P. 0. Box 14000 Juno
- Beach, FL 33408 Gentlemen:
SUBJECT:
CONFIRMATION OF MEETING ARRANGEMENTS - TURKEY POINT DOCKET NOS. 50-250 AND 50-251 This confirms the telephone conversation between Mr. J. A. Olshinski of my staff and Mr. K. N. Harris of your staff on December 6, 1984, concerning an enforcement conference to be conducted in the Region II office on December 18, 1984, at 9:30 a.m. We requested this meeting to discuss the auxiliary feedwater pump failure of December 3,
- 1984, and resulting issues identified in the enclosure to this letter.
A proposed meeting agenda is enclosed. Should you have any questions regarding these arrangements, we will be pleased to discuss them."
Enclosure:
Proposed Meeting Agenda cc w/encl: K. N. Harris, Vice President Turkey Point Nuclear Plant C. J. Baker, Plant Manager Turkey Point Nuclear Plant K. N. Jones, Plant gA Superintendent bcc w/encl: NRC Resident Inspector Document Control Desk State of Florida James P. O'Reilly Regional Administrator RII SElrod:km 12/ /84 RI I VBro lee 12/H /84 RII JMPuckett 12/ /84 is /84
yiiv+I "
',., I'1 figti'QP bi+I
'),
~ 'I
",=
t)"IOf
~
I
'I I i),"
i
'"f'I-I" I H
i+f,',f7
)
l i
f
" il
"<g
") 'aaf)) 'trip 0 II i I ~
I 'i i' us)
Jl
'i I}lt 7 il f
'fff:,I", ) ) I')
c c0>> ',,-)
5'),">'.-',1 'I
";>". ',"Lf~
~;0 c7f'f f)il"
',"I>I)YI,j')
"I
~
il
) "'1, )
')f)J 3
)64 I"f)if)rl"I i I P" f
) f ii>fbi,"
f i
)il S
~ ~ )"-i)
g )~)
'f:),f I
'< l'4 fff I' i
)I 9g'7
'I "+/if
~"'138 ) 2)
"i.)"i 9 'f, >>'f "I ) li) f)I b~F I tii-) ~ y II') )
"I. I g~'Igi)g
~ f I +'-'I
%i
~fi)
) I Ii'gc
',+ll>'
c'<%)I7
"~)'<'fl)'f I
=,'i
+1'iI'7 ilj
'll ~ g,iicf I I I
~ ~ ~ 'NCLOSURE PROPOSED MEETING AGENDA Florida Power and Light Company (FPSL) December 18, 1984, at 9:30 a.m I. Introduction of Purpose of Meeting II. Issues of Concern ql A. AFM pump failure of December 3; 1984. B. Documentaion of surveillance activities, especially failures, to allow review and evaluation. James P. O'Reilly J. A. Olshinski C. Adequacy of surveillance procedures to prove equipment operable. D. Adequacy of control room review-for-operability program and actions taken upon receipt of surveillance results. E. Operator review of Special Instructions and consistency of Technical Specification interpretation among the operating staff. F. Auxiliary Feedwater Technical Specification. III. Florida Power and Light Response IV. Comments and General Discussion V. Closing Comments C. J. Baker Attendees J. A. Olshinski}}