Proposed Tech Spec Tables 3.5-2, ESF Actuation & 3.5-4, ESF Setpoints
ML17346A319
Person / Time
Site: Turkey Point  
Issue date: 04/23/1984
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17346A318 List:
References
NUDOCS 8405010013
Download: ML17346A319 (7)


Text

TABLE3.5-2 ENGINEERED SAFETY FEATURES ACTUATION NO.

FUNCTIONALUNIT, 1.

SAFETY INJECTION 1.1 Manual 1.2 High Containment Pressure 1.3 High Differential Pressure between any Steam Line and the Steam Line Header IA Pressurizer Low Pressure+

1.5 High Steam Flow in 2/3 Steam Lines with Low Tavg or Low Steam Line Pressure 2.

CONTAINMENTSPRAY 2.1 High Containment Pressure and High-High Containment Pressure (coincident) 3.

AUXILIARYFEEDV/ATER 3.1 Low-Low Steam Generator Level MIN.

OPERABLE CHANNELS 1/line in each of 2 lines 2 per set 2

MIN.

DEGREE OF REDUN-DANCY 1/set OPERATOR ACTION IF CONDITIONS OF COLUMN I OR 2 CANNOT.BE MET Cold Shutdown Cold Shutdown Cold. Shutdown Cold Shutdown Cold Shutdown Cold Shutdown Hot Shutdown 3.2 Loss of Power a.

0.16kV Emergency Bus undervoltage (Loss of Voltage) b.

080V Load Centers (2 instantaneous relays per load center)++

c.

080V Load Centers (2 inverse time relays per load center)++

0 Cold Shutdown Cold Shutdown Cold Shutdown 84050i0013 840423 PDR AOOCK 05000250 P

PDR T18:5 Amendments and

~ I t~

1 I>

TABLE3.5-2 (Cont'd.)

ENGINEERED SAFETY. FEATURES'CTUATION NO.

FUNCTIONALUNIT

'MIN.

OPERABLE CHANNELS 2

MIN.

DEGREE OF REDUN-DANCY OPERATOR ACTION IF CONDITIONS OF COLUMN 1 OR 2 CANNOT BE MET 3;3 3.0 Safety Injection Trip of both Main

.Feedwater Pump Breakers

(

See 1 above

)

Cold Shutdown

+ This signal may be manually bypassed, when the reactor is shutdown and pressure is below 2000 psig.

++ These items do not apply on Unit 3 until after implementation of PC/M,79-116 and on Unit 0 until after 'implementation of PC/M 80-00..

++" Operation or start-up may continue with only one channel operable only if the inoperable channel is placed in the trip condition.

T18:5 Amendments and

II

~I

TABLE3.5-0 (Sheet 2)

ENGINEERED SAFETY FEATURE SETPOINTS NO.

FUNCTIONALUNIT 7b.

Degraded Voltage ++

(080 Volt Load Center)

Load Center 3A++

3B+ +

3C+%

3D++

8.

Safety Injection 9.

Trip of both Main Feedwater Pump Breakers CHANNEL ACTION Auxiliary Feedwater Instantaneous

~Set oint 036V (10 sec. delay)/P 016V (10 sec. delay)/P 017V (10 sec. delay)/7 028V (10 sec. delay)fP 015V (10 sec. delay)$5 014V (10 sec. delay)7$

001V (10 sec. delay)$/

003V (10 sec. delay)$P Auxiaary Feedwater Auxiliary Feedwater SETPOINT All with tolerance of +5 volts.

Delay

'~Set oint 019V (60 sec +30 sec.

delay) 026V (60 sec +30 sec.

delay) 027V (60 sec +30 sec.

delay) 036V (60 sec +30 sec.

delay) 027V (60 sec +30 sec.

delay) 020V (60 sec +30 sec.

delay) 013V (60 sec +30 sec.

delay) 012V (60 sec +30 sec.

delay)

All SI setpoints N.A.

++ These items do not apply on Unit 3 until after implementation of PC/M 79-116 and on Unit 0 until after implementation of PC/M 80-00.

II Channel action is subject to condition being concurrent with Safety Injection signal.

Tls:5 Amendments and

0 r

ENCLOSUR PSB DSI SALP INPUT PLANT:

TURKEY POINT NUCLEAR GENERATING PLANT, UNITS 3

& 4 LICENSEE:

FLORDIA POWER AND LIGHT COMPANY (FPL)

DOCKET -NO:

50-250/251 LICENSE STATUS:

OR SER

SUBJECT:

T.S.

CHANGE REQUEST ON DEGRADED GRID PROTECTION FOR CLASS 1E POWER SYSTEM (B-23)

PERFORMANCE PARAMETERS:

(1)

Management Involvement In Assuring Quality (2)

Approach To Resolution of Technical Issues From a Safety Standpoint (3)

Response

To NRC Initiatives (4)

Staffing (Including Management)

(5)

Reporting And Analysis Of Reportable Events (6)

Training And Qualification Effectiveness (7)

'Any Other SALP Functional Area PERFORMANCE PARAMETER 3

4 5

6 7

NARRATIVE DESCRIPTION OF APPLICANT/LICENSEE'S PERFORMANCE N/A The licensee has demonstrated understanding of issues.

Their approach to resolution was viable and sound.

N/A N/A N/A N/A N/A CATEGORY/RATING OVERALL APPLICANT/LICENSEE PERFORNANCE RATING I