Docket Nos.
50-250 and 50-251 Mr. J.
W. Wil:liams, Jr.
Vice President, Nuclear Energy Department P. 0.
Box 14000 Juno Beach, Florida
Gray File OPA, C.Miles NRC PDR DEisenhut EJordan CParrish ORAB SECY L PDR OELD JTaylor DMcDonald TBarnhart (8)
RDiggs
Dear Mr. Williams:
SUBJECT.:
INSERVICE INSPECTION PROGRAM'URKEY POINT PLANT UNITS NOS.
3 AND 4 REQUEST TO UPDATE CODE REQUIREMENTS AND EXTEND EXISTING TEN-YEAR INTERVAL By letter dated October 3 and revised October 21, 1983, you requested to (1) update the requirements for system pressure tests to the 1980 Edition through Winter 1981 Addenda of Section XI of the ASME Code and (2) extend the ten-year inspection interval due to lengthy steam generator repair out-ages by one year for both Turkey Point Units.
Based on our review, we approve the update to the later Edition of Section XI for the pressure test requirements as requested.
The Regulations, 10 CFR 50.55a, allows use of requirements in later editions and addenda of Section XI which have been approved by the Commission and incorporated in paragraph (b) of 10 CFR 50.55a.
Paragraph (b) presently cites the 1980 Edition through Winter 1981 Addenda as the latest approved edition and addenda.
This request is therefore within the requirements of the Regulation and it, along with this letter, serves as documentation necessary to substantiate that changes made in the Inservice Inspection Programs for Turkey Point Units 3 and 4 have been reviewed and evaluated in a manner that is consistent with our procedures and position.
We have also reviewed your request for extension of the inspection interval to September 1,
1984 and providing the new program submittal by March 1, 1984.
We have determined your request for extension of the inspection interval to September 1,
1984, is unacceptable.
As explained in the enclosed Exemption, the new ten-year interval starts February 22, 1984 for Unit 3 and April 15, 1984 for Unit 4.
The details f'r establishing these dates and the basis for the Commission granting the schedular exemption for providing the program submittal by March 1, 1984 are detailed in the Exemption.
8403140300 84030l PDR ADOCK 05000250 Q
~
/
'I o
I
Nr. J.
W. Williams, Jr.
A copy of this Exemption is being filed with the Office of the Federal
~Re ister for publication.
Enclosure:
Exemption cc w/enclosure:
See next page Sincerely,
~G~ SZmeo By Steven A. Varga, Chief Operating Reactors Branch ¹1 Division of Licensing E
ORB¹l: DL Parris ORB¹1:DL DMcDonald s//rti /gi$
B
- DL AD a
GLi DL c
'OELD D:D b/.5L 'c(4>>
OE K /f-"//I/;f Rglq
ik Ik
/
t
gal@ Rtr>y
~
eC
~
'du0
/p UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 March 1, 1984 Docket Nos.
50-250 and 50-251 ter. J.
W. Williams, Jr.
Vice President, Nuclear Energy 'Department P. 0.
Box 14000 Juno
- Beach, Florida 33408
Dear Mr. Williams:
SUBJECT:
INSERVICE INSPECTION PROGRAM TURKEY POINT PLANT UNITS NOS.
3 AND 4 REQUEST TO UPDATE CODE REQUIREMENTS AND EXTEIID EXISTING TEN-YEAR INTERVAL By letter dated October 3 and revised October 21, 1983,. you requested to (1) update the requirements for system pressure tests to the 1980 Edition through Winter 1981 Addenda of Section XI of the ASME Code and (2) extend the ten-year inspection interval due to lengthy steam generator repair out-ages by-one year for both Turkey Point Units.
Based 'on our review, we approve the update to the later Edition of Section XI for the pressure test requirements as requested.
The Regulations, 10 CFR 50.55a, allows use of requirements in later editions and addenda of Section XI which have been approved by the Commission and incorporated in paragraph (b) of 10 CFR 50.55a.
Paragraph (b) presently cites the 1980 Edition through Winter 1981 Addenda as the latest approved edition and addenda.
This request is therefore within the requirements of the Regulation and it, along with this letter, serves as documentation necessary to substantiate that changes made in the Inservice Inspection Programs for Turkey Point Units 3 and 4 have been reviewed and evaluated in a manner that is consistent with our procedures and position.
We have also reviewed your request for extension of the inspection interval to September 1,
1984 and providing the, new program submittal by March 1, 1984.
We have determined your request for extension of the inspection interval to September 1,
1984, is unacceptable.
As explained in the enclosed Exemption, the new ten-year interval starts February 22, 1984 for Unit 3 and April 15, 1984 for Unit 4.
The details for establishing these dates and the basis for the Commission granting the schedular exemption for providing the program submittal by March 1, 1984 are detailed in the Exemption.
\\
Mr. J.
W. Williams, Jr.
fan%
A copy of this Exemption is being filed with the Office of the Federal Receister for publication.
S ce rely
Enclosure:
Exemption cc w/encl osure:
See next page even Y rga
.ief Operating Reactor
.Branch Nl Division of Licensing
il 0
I II S
l l
J.
W.. Williams, Jr.
Florida Power and Light Company Turkey 'Point Plants Units 3 and 4
cc:
Harold F. Reis, Equire Lowenstein,
- Newman, Reis and Axelrad 1025 Connecticut
- Avenue, N.W; Suite 1214 Washington, DC 20036
'Bureau of Intergovernmental Relations 660 Apalachee Parkway Tallahassee, Florida 33130 Norman A. Coll, Esquire
.Steel, Hector and Davis 1400 Southeast First 'National Bank.Building Miami, 'Florida 33131
!'il. Henry Yaeger, Plant Manager Turkey Pcint Plant Florida Power and Light Company P.O.
Box 01'3100 Miami, Fl orida 33101 ter.
M. 'R. Stierheim County Manager of Metropolitan Dade County Miami,, Florida 33130 Resident Inspector Turkey Point Nuclear Ge>>er<-;t.ing Station U.S. 'Nuclear Regulatory Commission Post Office Box I'207 Homestead',
Florida 33030 Regional.Radiation Representative EPA Region IV 345 Courtland 'Street,
'N.W.
- Atlanta, GA 3030B Vr. Jack Shreve Office-of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Administrator Depa rtment of Env ironmen ta 1 Regulation Power Plant Siting Section State of Florida 2600 'Blair Stone Road Tallahassee, Florida 32301 James P.. O'Reilly Regional Administrator, Region II U;S. 'Nuclear Regulatory Commission 101 Marietta Street, Su.ite 3100
- Atlanta, GA 30303 Martin 'H. Hodder, Esqui>e 1131 N.'E. 86th Street tliami, Fln< ida 3" I "8
Ik II