Requests Util Schedule for Providing Pressurized Thermal Shock Calculations within 30 Days
ML17345B372
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/17/1983
From: Varga S
Office of Nuclear Reactor Regulation
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
References
REF-GTECI-A-49, REF-GTECI-RV, TASK-A-49, TASK-OR NUDOCS 8312080265
Download: ML17345B372 (6)


Text

Docket Nos. 50-250 and 50-251 Dr. Robert E. Uhrig, Vice President Advanced Systems and Technology Florida Power and Light Company Post Office Box 14000 Juno Beach, Florida 33408 Docket File NRC PDR' PDR ORB¹1 D Eisanhut G Vissing C Parrish D McD0nald J Taylor E Jordan OELD ACRS (10)

Gray File

Dear Or. Uhrig:

SUBJECT:

PRESSURIZED THERMAL,SHOCK NEAR TERM FLUX REDUCTION PROGRAM-TURKEY POINT PLANT UNITS 3 AND 4 OFFICE II SURNAME/

DATE N We have met with your staff to,.discuss Florida Power and Light Company's integrated program for insuring that the screening criteria for Pressurized Thermal Shock (PTS)'for Turky Point Units 3 and 4 would not be exceeded.

The NRC staff has concluded that the near term flux reduction plans are reasonable and practical.

The use of the 15xl5 Optimized Fuel Assembly (OFA) and the use of Westinghouse Wet Annular Burnable Absorber (WABA) rods for Turkey Point Unit 3 Cycle 9 will have a flux reduction factor of 3.3 which will extend the screening criteria to the year 2007 for Unit 3.

The OFA/WABA core design will be implemented on Unit 4, Cycle 10, resulting in the same time extension for the screening criteria.

Except for staff reviews necessary to approve core reloads with low leakage

cores, we have concluded that further staff activity with r egard to flux reduction measures will be in the context of our r'eviews of flux reduction analyses that the new PTS rule will require from all plants projected to exceed the screening criterion before end-of-license.

The staff is now in the process of auditing all eight reactors in need of near term flux reduction in order to evaluate and verify the flux reduction achieved by the licensees.

In some cases the review is concurrent with the cove reload reviews in progress.

For those licensees, including FP&L, who have not provided the information, we will need the integral neutron source of future core configurations rIhich effect the critical weld areas of the pressur e vessel.

This need to be only a one time calculation which will demonstrate FP&L's commitment as reflected in the staff's report to the Commissioners on this issue, SECY 83-443, dated October 28, 1983.

In this regard we r equest your schedule for providing such PTS calculations within 30 days from receipt of this letter. If you have any questions regarding this request, please contact the NRC Project Manager for your plant.

83i2080265 83iii7 POR AOOCX 05000250 I

PDR g

NRG FORM 818 (10-80] NRCM 0240 OFFIClAL RECORD COPY USQ PO: 1981~960

k

The reporting and/or recordkeeping requirements of this letter affect fewer than ten respondents; therefore, ORB clearance is not required under P.L.96-511.

Sincerely, cc:

See next page Steven A. Varga, Chief Operating Reactors Branch Ho.

1 Division of Licensing R

0.

QR

.P/.91 ORB ORB ¹4 DMcDonql;ef Q' g,

.....U./ftjt./83". ""LlP f1j'83 "

OFFICE 0 SURNAME/

~

~

~

~

~ ~ \\

~

~

~ IO~ 0 ~ ~ 0 ~ 0 OATEj NRC FORM 318 u0-80) NRCM 0240

~

~

0 F FIG IAL R EGO R D COPY USGPO: 1981~960

~

F

'I

Robert E. Uhrig Florida Power and Light Company cc:

Harold F. Reis, Esquire Lowenstein, Newma'n, Reis and Axelrad 1025 ConnectiCut

Avenue, N.W.

Suite 1214 Washington, D. C.

20036 Norman A. Coll, Esquire

Steel, Hector and Davis 1400 Southeast First National, Bank Building Miami, Florida 33131 Mr. Henry Yaeger, Plant Manager Turkey Point Plant Florida Power and Light Company P. 0.

Box 013100 Miami, Florida 33101 Mr. Jack Shreve Offi'ce of the Public Counsel Room 4, Holland Bui,lding Tallahassee, Florida 32304 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Resident Inspector Turkey Point Nuclear Generating Station U. S. Nuclear Regulatory Commission Post Office Box 1207 Homestead, Florida.

33030

James, P. O'Reilly Regional Administrator - Region II U.

S'. Nuclear Regulatory Commission 101 Marietta Street - Suite 3100 Atlanta, Georgia 30303

4 0

C