ML17345B257

From kanterella
Jump to navigation Jump to search
Forwards Administration of Operator Licensing Written Exam & Requests Referenced Matl Discussed in Telcon Be Provided by 830812 in Order to Administer Exams During Wk of 830912.W/o Encl
ML17345B257
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/29/1983
From: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Williams J
FLORIDA POWER & LIGHT CO.
References
NUDOCS 8309190159
Download: ML17345B257 (4)


Text

OFFICIAL RECORD COPY July 29, 1983 Florida Power and. Light Company ATTN:

Mr. J.

L. Williams, Vice President of Nuclear Energy Department P. 0.

Box 529100 Miami, FL 33152 Gentlemen:

SUBJECT:

OPERATOR AND SENIOR OPERATOR LICENSING EXAMINATIONS In a telephone conversation between Mr. Bill Miller, Training Supervisor, and Mr. Art Johnson, License Examiner, Operator Licensing Section, arrangements were made for the administration of the examinations at the Turkey Point facility.

The written examinations are scheduled'or the week of September 12, 1983.

In order for us to meet the above schedule, it will be necessary for the facility to furnish the approved reference material discussed in the above mentioned telephone conversation by August 12, 1983.

Any delay in receiving this material will result in a delay in administering of the examinations.

Our examinations are scheduled far in advance with considerable planning to uti.lize our present limited examiner manpower and to meet the examination date requested by the various facilities.

Therefore, missing the August 12, 1983, deadline even by a few days, will likely result in a long delay, since it would not be possible to reschedule examinations at other facilities.

Mr. Miller has been advised of our referenced material sets that are required, and the examiners'ames and addresses where each set is to be mailed.

The facility management is responsible for providing adequate space and facilities in order to properly conduct the written examinations.

The enclosure, "Administration of'perator Licensing Written Examinations" describes our requirements for conducting these examinations..

Mr. Miller has also been informed of these requirements.

All operator and senior license applications should be submitted at least 30 days pri'or to the first examination dates so that we will be able to review the training and experience of the candidates, process the medical certifications, and prepare final examiner assignments after. candidate eligibility has been determined.

SoQm( ~W 8309i90f59 830729 PDR ADOCK 05000250 i,

V PDR

%ac s

~k '

'k J

C

Florida Power and Light Company July 29, 1983 Thank you for your consideration in this matter.

If you have any questions regarding the examination. procedures and requi,rements, please contact Mr. Bruce A. Wilson, 404/221-5542, or Mr. Art Johnson, 404/221-5601.

Sincerely,

Enclosure:

"Administration of Operator'icensing Written Examinations" cc w/encl:

B. Miller, Facility Training Supervisor J.

Hayes, Plant Superintendent bcc w/encl:

Resident Inspector, R. Vogt-Lowell Document Management Branch (Original signed by CJulian)

'H.

C. Dance, Chief Project Branch 2.

Division of Project and Resident Programs RI I 07/

/83 RII RI I RII limn AEGibson(~HCDa 07/

/83 07/

/83 07/7 83

>/zs/sz

Qt

.i P

I g I'

t

, c

~

6 8