L-83-380, Forwards Revs to Inservice Test Program for Pumps & Valves. Inservice Test Program for Valves,W/Remote Indicators, Revised to Provide Verification That Valve Operation Accurately Indicated

From kanterella
(Redirected from ML17345B140)
Jump to navigation Jump to search
Forwards Revs to Inservice Test Program for Pumps & Valves. Inservice Test Program for Valves,W/Remote Indicators, Revised to Provide Verification That Valve Operation Accurately Indicated
ML17345B140
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 06/30/1983
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML17345B141 List:
References
L-83-380, NUDOCS 8307060209
Download: ML17345B140 (6)


Text

REGULATORY+IFORMA'TIOAI'ISTRIBUTIONO'IM (RIBS)

"ACCESSION NBR08307060209 DOCSDATE: 83/06/30 NOTARIZED; NO DOCKET 0

FACIL:50-250 Turkey Point PlantE Unit 3i Florida Power and Light C

05000250 AUTH BYNAME AUTHOR AFFILIATION UHRIGER,EB Florida Power 8 Light Co, REC IP ~ NAME RECIPIENT AFFILIATION VARGArS+A~

Operating Reactors Branch 1

SUBJECT:

,For wards revs to inservice test program for pumps 8

valves'nservice test, program for valves w/remote indicators revised to provide. verification that valve operation accurately indicated, DISTRIBUTION CODE:

AOATS

.COPIES RECEIVED:LTR ENCL SIZE;,~

TITLE:

OR Submittal: Inservice Inspection/Testing NOTES:

RECIPIENT IO CODE/NAME NRR OR81 BC 01 INTERNAL: ELD/HDSO NRA/DE/MTEB 14 RGA2 COPIES LTTR ENCl 7

7 1

0 1

1 1

1 RECIPIENT ID CODE/NAME EB REG FI 04 COPIES LTTR ENCL EXTERNAL: ACRS NRC PDR NTI' 16 10 1'0 02 1

1 1

1 LPDR NSIC 03 05

,TOTAL NUMBER OF COPIES REQUIRED:

LTTR 26 ENCL

?5

(D

~.

1 >>0(

~ 0f

'~ yt >I

~ <<<<

~~

~e li>> t t

'.~'Jag',

'liV fr(V t ~

~

'(P(

I t

<< ~

'l f

y t

(( 'il

((>>

IAt pl

(

1( <"

~

y

(

'( f (I 4

>>AT ll y la'a, TT l dI y

r

(

(

% ~ 1 yfT y

~

g (!Il

. BOX 14000, JUNO BEACH, FL 3340B yihl j/

G e~

FLORIDA POWER & LIGHTCOMPANY June 30, 1983 L-83-380 Office of Huclear Reactor Regulation Attention:

Mr. Steven A. Varga, Chief Operating Reactors 8ranch gl Division of Licensing U.

S.

Huclear Regulatory Commission Liashington, D. C.

20555

Dear Mr. Varga:

Re:

Turkey Point Unit 3 Docket Hos.

50-250 Inser.vice. Testing -.Pro ram Attached is a revision to the current Turkey Point Unit Ho.

3 Inservice Test

{IST) Program for pumps and.valves.

Revisions are indicated by a single line in the right margin.

Revi sions include:

\\

1)

The Inservice Test Program for valves with remote indicators was revised to provide for verification that valve operation is accurately indicated or specific relief requested in accordance with 10 CFR 50.55(a)(g).

2)

The limiting value or full stroke time of certain power operated valves was reduced.

3)

The program was revised to provide for testing of new valves that were installed as additions or replacements during the recent steam generator repair outage.

4) 5)

'The drawing number used on Table I and Table II valve lists was revised.

to show the Architect-Engineer (A/E) drawing number.

This replaces the FPL assigned drawing number previously used.

The Turkey Point Unit Ho.

3 IST Program was revised to conform to the IST Program submitted.for Turkey Point Unit 4 which was submitted March 7,

1983.

8307060209 830630 PDR ADOCK 05000250 P.

FDR PEOPLE... SERVING PEOPLE

0 IW tl+F

~j Jfl

Office of Nuclear Rea r Regu)atio7i Attention:.

Mr. Steven e.

Varga, Chief Page 2

Should you o'r your staff have any questions on this infornation, please contact us.

Very truly yours,

~~.v~

t E. Uhrig Vice President Advanced Systens 8 Technology REU/PLP/j s Attachme nt.

cc:

J.

P. O'Reilly, Region II Harold F.

Rei s, Esquire

'I~

QF