Advises That Addl Testing in Specific Cases Re Use of Energy Balance Technique & Arching Action for Masonry Wall Qualification Not Warranted.Decision Based on Technical Info Presented During & Subsequent to 830120 Meeting
ML17345B069
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/26/1983
From: Varga S
Office of Nuclear Reactor Regulation
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
References
NUDOCS 8305060653
Download: ML17345B069 (4)


Text

re 4,"

APR 2 6 19@

Docket Nos. 50-250 and 50-251 Dr. Robert E. Uhrig, Vice President Advanced Systems and Technology Florida Power and Light Company Post Office Box 14000 Juno Beach, Florida 33408 DISTRIBUTI N

'Docket.-F-i-l e~

NRC PDR Local PDR ORB 1 File D. Eisenhut OELD E. Jordan D. McDonald C. Parrish NSIC J. Taylor ACRS (10)

C., Trammell M. Chokshi

Dear Dr. Uhrig:

SUBJECT:

MASONRY MALL DESIGN - TURKEY POINT PLANT, UNITS 3 AND 4 A meeting was held in Bethesda, Ihryland on January 20. 1983, to discuss the use of energy balance technique and arching action for masonry wall qualification.

The NRC staff indicated that the validity of the two analysis techniques should be substantiated by appropriate masonry testing.

Based on the technical information presented during and subsequent to the meeting, we have concluded that additional testing in the specific cases for each facility is not warranted at this time.

However, we further indicated that facilities would be selected for plant-specific reviews wherein each specific application of.these techniques would be reviewed in detail.

The staff has selected Turkey Point Plant Units 3 and 4 as one of the facilities for a plant-specific review due to your extensive use of both the analytical techniques for masonry wall design qualification at the Turkey Point Plant.

We request that a site visit and. detailed audit of the calculations and analysis used for masonry wall qualification be arranged with the NRC Project. Manager for Turkey Point Plant.

We request that the-arrangements.

and details be made by telephone and the site visit be at the earliest time agreeable to both our staffs.

Sincer ely, cc:

See next page

+> >b uaL Signe4 'bye 8 ~ Ai.Vary@,

Steven A. Varga, Chief Operating Reactors Branch No.

1 Division of Licensing 8305060b53 83042b PDR ADOCK 05000250 P

PDR OFFICE/

SURNAME~

CATE $

ORB 1

D< --'1'r'S-'

~ ~ ~

.49$..83

~ ~

~ ~

3 NRC FORM 318 (10-80) NRCM 0240 OFFICIAL R ECOR D COPY USGPO: 1981~960

lp I

i g

'd

Robert E. Uhrig Florida Power and Light Company cc~

Harold F. Reis, Esquire Lowenstein, Newman, Reis and Axelrad 1025 Connecticut

Avenue, N.M.

Suite 1214 Mashington, D. C.

20036 Norman A. Col,l, Esquire

Steel, Hector and'avis 1400 Southeast First National Bank Building Miami, Florida 33131 Mr. Henry.Yaeger, Plant Manager Turkey Point Plant Florida Power and Light Company P. 0.

Box 013100 Miami, Florida 33101 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tal lahassee, Florida 32304 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone-Road Tallahassee, Florida 32301 Resident Inspector Turkey Point Nuclear Generating Station U. S. Nuclear Regulatory Commission Post Office Box 1207 Homestead, Florida 33030 James P. O'Reilly Regional Administrator - Region II U. S. Nuclear Regulatory Commission 101 Marietta Street - Suite 3100 Atlanta, Georgia 30303

,yA w~

e