Requests Exemption from 10CFR50.71(e)(3)(i) Schedular Requirement to File Annual FSAR Rev by 830722.Proposed Filing Date of 831122 Would Facilitate FSAR Update, Reflecting More as-built Configuration
ML17341B619
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/02/1983
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
L-83-52, NUDOCS 8302070444
Download: ML17341B619 (4)


Text

REGULATORY FORMATION DISTRIBUTION SY

.M ('RIDS)

ACCESSION NBR:8302070444 DOC ~ DATE: 83/02/03 NOTARIZED:

NO DOCKET FACIL:50 250 Turkey Point PlantE Unit 3E Florida iPower and Light C

05000250 SO-251 Turkey Point,Planti Uni:t 4i Florida IPower and Light C

050002S1 AUTHBNAME AUTHOR AFFILIATION UHRIGiR ~ Gs Florida 'Power L Light Co,

~REiC IP ~ NAME RECIPIENT AFFIlIATION DENTONiH ~ Rs

,Office of Nuclear Reactor Regulationg Director

SUBJECT:

Requests exemption from 10CFR50

~ 71(e)(3),(i) Aschedular-requirement to file annual FSAR rev by 830722,'Proposed filing date of 631122 would -facilitate FSAR updatei reflecting more as-built configurations DISTRIBUTION CODE:

AOB3S COPIES RECEIVED:LTR.l

.ENCL SIZE:.

TITLE:

OR Submittal:

Updated FSAR (S0 71.)

NOTES:

RECIPIENT ID CODE/NAME McOONAI DiD 01 INTERNAls IE FILE 05 RGN2 oe

.COPIES LTSir w ii t)f+> ~ IIII, ) '9,; 'f>') O-t I J 'lI ) U il c!! Ii I I J 1 >I! 9fWk i Ji e'" ~ 8 ~ )l II j >T 'r>li Js g.> 4 j)I'I>> I )lj>'I>~' ) 'g "i1'g>>')lip, ')C y 'l @if SI,.'f t T l ">,>k' l,> i >F,I 'f i g,$ '> "g f t]lil, g h'r! I f f If,'~I'(> ) il'. i lg J I 'I-I:> I 'I '>r I, ~~~~4 ww.e .J i WJ Pe WSg ~ ~, i')I,'I .'>>'I> 'i))) ~ ll<jk+f'Il , fc )I II ~4 VII >l Il If C x l )T;, 4 'I 4 p -) .>-4 . BOX 14000, JUNO 8EACH, FL 33408 FLORIOA POWER 8 LIGHTCOMPANY February 2, 1983 L-83-52 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission washington, D.C. 20555

Dear Mr. Denton:

Re:

Turkey Point Plant Units 3 and 4

Docket Nos.

50-250 and 50-251 FSAR U date Florida Power

& Light Company respectfully requests a

10 CFR 50. 12 specific exemption of the schedular requirement in 10 CFR 50.71(e)(3)(i) to file our annual revision to the Final Safety Analysis Report (FSAR) on or before July 22, 1983:

Our proposed FSAR filing date is November 22, 1983.

The proposed schedule will facilitate an updated FSAR which would reflect a more as-built configuration of both Turkey Point nuclear units.

The required filing date of July 22, 983 for the next FSAR update would not include the Steam Generator Repair outage modifications, i.e., Unit 4 Steam Generators Replacement, Auxiliary Feedwater modifications, NUREG 0737 (TMI) modifications, and other modifications currently under-taken during this outage.

The November 22, 1983 filing of the update would facilitate the incorpora-tion of the above listed modifications made during the Steam Generator Repair outage and would reflect a more as-built configuration.

Therefore, it is our opinion that an extension until November 22, 1983 to meet 10 CFR 50.71(e)(3)(i) is justified.

Subsequent updates should be filed according to 10 CFR 50.71(e)(3)(i) requirements.

Very truly yours, Robert E. Uhrig Vice President Advanced Systems and Technology REU/SAV/cab 8302070444 830202 PDR ADOCK 05000aS0 P