REGULA RY INFORMATION DISTRIBUT 9 SYSTEM (RIDS)
ACCESSION NBR: 8802170400 DOC. DATE:.88/02/12 NOTARIZED YES FACIL: 50-250 Tuv keg Point Plant>
Unit.3>
Flov ida Power and Light C
50-251 Tuv keg Point Plant>
Unit 4> Flovida Power and Light C
AUTH. NAME AUTHOR AFFI L I AT ION MOODY> C. O.
Flov'ida Power Zc Light Co.
RECIP. NAME RECIPIENT AFFILIATION GRACE> J. N.
Region 2>
Ofc of the Div'ector DOCKET 0 05000250 05000251
SUBJECT:
Forwards response to NRC Bulletin 87-002 re receipt insp requirements v eview Px fastener testing to determine conformance w/applicable matl specs. All fasteners acceptable for continued use.
DISTRIBUTION CODE:
IE11D COPIES RECEIVED: LTR
')
ENCL $
SIZE:
2 TITLE: Bulletin Response (50 DKT)
NOTES RECIPIENT ID CODE/NAME',
PD2-2 LA EDISON> G INTERNAL: AEOD/DOA AEOD/DSP/TPAB NRR/DEST/ADS NRR/DOEA/EAB RR~R P/EPB REG FILE 02 R
FILE 01 EXTERNAL:
LPDR NSIC 1
1 1
COPIES LTTR ENCL 1'
1 1
1 1
1 1
1 1
REC IP IENT ID CODE/MANE PD2-2 P.D
- EOD/DSP NRR/DEST/ADE NRR/DEST/MEB NRR/DOEA/GCB NRR/PMAS/ ILRB RES/DE/EIB NRC PDR COPIES LTTR ENCL 1
1 1
ii 1
1" 1
1 1
1 TOTAL NUMBER QF CQP IES REQUIRED:
LTTR 1'P ENCL 18
P. O. BOX 14000, JUNO BEACH, FL 33408.0420 4
~)II FEBRUARY.
- 2. 2 1988 L-88-69 Dr. J. Nelson Grace Regional Administrator, Region II U. S. Nuclear Regulatory Commission 101 Marietta St.,
N.W., Suite 2900
- Atlanta, GA 30323
Dear Dr. Grace:
Re:
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 NRC Bulletin 87-02':
Fastener Testing to Determine
'onformance with A licable Material S ecifications 1
I NRC Bulletin 87-02 requested licensees to review their receipt "inspection requirement's and internal controls for fasteners and independently determine, through
- testing, whether fasteners (studs,
- bolts, cap screws and nuts) in stores at their facilities meet required mechanical and chemical specification requirements.
By letter dated January 12, 1988 (L-88-14),
FPL provided a
schedule to complete the response by February 12, 1988.
A total of 22 fasteners were.
independently tested with only slight variations found between the manufacturer's test results and the independent test results.
All the fasteners were found to be acceptable-for continued use.
The attached material contains the answer to the specific questions addressed in the bulletin, the results of the independent test and the Engineering evaluation of the discrepancies identified.
The attached information is provided pursuant to Section 128a of.
the Atomic Energy Act of
- 1954, as amended.
If further information is required on this topic, please contact us.
Very truly yours, p C. 0.
ody
+Y Execu i e Vice President COW/SDF/dh
,Attachment cc:
Document Control Desk, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant SDF/012.BUL 8802i70400 8802i2 PDR ADQCK 05000250 6L PDR an FPL Group company
STATE OF FLORlDA
)
)
ss.
COUNTY OF PALMBEACH )
~D.A.S d
i d
d i,d d
That he is Executive Assistant of Florida Power & Light Company, the Licensee herein; That he has executed the foregoing document; that the statements made in this document are true and correct to the best of his knowledge, information, and
- belief, and that he is authorized to execute the document on behalf of said Licensee.
d D. A.
ger Subscribed and sworn to before me this day of
, l98.
NOTARY PUBLlC, in and for the County of Palm Beach, State of Florida tct3TQ jv f","-.I z." srre My C~m~i~sio~ ~~pir~s: "'"'-"'"
0 PW