ML17342B150
| ML17342B150 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 02/10/1988 |
| From: | Varga S Office of Nuclear Reactor Regulation |
| To: | Woody C FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17342B151 | List: |
| References | |
| NUDOCS 8802160120 | |
| Download: ML17342B150 (10) | |
See also: IR 05000250/1987049
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
WASHINGTON, D. C. 20555
February
10,
1988
Docket Nos.
50-250
and
50-251
Power
and Light Company
ATTN:
Hr. C. 0.
Moody
Executive Vice President
P. 0.
Box 14000
Juno
Beach,
33408
SUBJECT:
SAFETY REVIEW TEAVI INSPECTION REPORT
NO. 50-250/87-49;
50-251/87-49
Gentlemen:
This letter forwards the report of the Safety Review Inspection
conducted
by Nr. C. Haughney
and other
NRC personnel
during the period December 7-11,
1987, of activities at the Turkey Point Power Plant, authorized
by
NRC
Operating Licenses
and
and to the discussion of our findings
with Hr.
C.
Baker
and others at the conclusion of the inspection.
The inspection
consisted of an examination,
on
a sampling basis, of activi-
ties in the areas of safety review pursuant to 10 CFR 50.59,
and the on-site
and off-site review committees.
The inspection
included assessment
of safety
review documentation,
interviews with site
and corporate
personnel,
and atten-
dance at committee meetings.
The inspection
team found evidence of significant improvement in the quality
of safety evaluations
over the past year.
Remaining steps
to assure
continua-
tion of this trend include the timely issuance of your comprehensive
draft
procedure
covering
10 CFR 50.59 evaluations
and associated
training for
reviewers.
Additional areas for improvement identified by the inspection
team include:
improving the efficiency of Plant Nuclear Safety Committee
(PNSC) reviews,
identifying currently valid safety evaluations,
classification of guidance
documents
regarding active check valve failures, the retention of design
calculations
and timely completion of Request for Assistance
evaluations
(REAs).
Some of the items identified by the team may be potential
enforceIIIent findings.
Any enforcement
actions will be identified by Region II.
In accordance
with 10 CFR 2.790(a),
a copy of this letter and the enclosure
will be placed in the
NRC Public Document
Room.
8802ihOi20 8802i0
ADDCK 05000250'
-
P~DR
4
Florida Power and Light Company
-2-
February
10,
1988
Should you have any questions
concerning this inspection,
please
contact
me
or Mr. L. Norrholm (301-492-0956) of this office.
Steven
A. Varga, Director
Division of Reactor Projects, I/II
Office of Nuclear Reactor Regulation
Enclosure:
Inspection
Report 50-250/
87-49; 50-251/87-49
.
cc w/enclosure:
See next page
Florida Power and Light Company
-3-
February
10,
1988
CC:
Harold F. Reis,
Esquire
Newman
and Holtzinger, P.C.
1615
L Street,
N.W.
20036
Mr. Jack
Shreve
Office of the Public Counsel
Room 4, Holland Building
Tallahassee,
32304
John T. Butler, Esquire
Steel,
Hector and Davis
4000 Southeast
Financial
Center
Miami, Florida
33131-2398
Mr. J.
Odom, Vice President
Turkey Point Nuclear Plant
Florida Power and Light Company
P.O.
Box 029100
Miami, Florida
33102
Mr. Sergio Periera
County Manager of Metropolitan
Dade County
Miami, Fl or i da
33130
Resident
Inspector
U.S. Nuclear Regulatory Comnission
Turkey Point Nuclear Generating Station
Post Office Box 57-1185
Miami, Florida
33257-1185
Jacob
Daniel
Nash
Office of Radiation Control
Department of Health and
Rehabilitative Services
1317 Winewood Blvd.
Tallahassee,
32399-0700
Intergovernmental
Coordination
and Review
Office of Planning
5 Budget
Executive Office of the Governor
The Capitol Building
Tallahassee,
Flordia
32301
l
Administrator
Department of Environmental
Regulation
Power Plant Siting Section
State of Florida
2600 Blair Stone
Road
Tallahassee,
32301
Regional Administrator, Region II
U.S. Nuclear Regulatory
Commission
Suite
2900
101 Marietta Street
Atlanta, Georgia
30323
Attorney General
Department of Legal Affairs
The Capitol
Tallahassee,
32304
Joetta
Lorion
7269 S.W.,
54 Avenue
Miami, Florida
33143
Mr. Chris J. Baker, Manager
Turkey Point Nuclear Plant
Florida Power and Light Company
P.O.
Box 029100
Miami, Florida
33102
1100 Circle 75 Parkway
Atlanta, Georgia
30339
Florida Power and Light Company
-4-
February
10,
1988
Distribution:
Docket
Fs le
DRIS R/F
RSIB R/F
JPartlow,
BGrimes,
JSniezek,
SVarga,
GLainas,
CHaughney,
JKonklin,
LNorrholm,
EImbro,
JCummins,
GEdison,
MBerkow,
LSpessard,
SRubin,
DAllison, AEOD
WTroskoski,
BWilson, RII
LReyes,
RII
CWHehl, RII
SRI, Turkey Point
LPDR
Licensing
Fee
Management
Bra
Regional Administrators
Regional Division Directors
ACRS (10)
GPA (3)
1S Distribution (All Utility
nch
Licensees)
- See Previous
Concurrence
OFC: RSIB: DRIS: NRR*:RSIB'RIS'RR~: DD:
NRR: D: DRIS: N
- LNorrholm
- CHaughney
- B
- JPartlo
- 1/ /88: 1/ /88: 1 88: 1/
88
/z~
ar
/88
I
( i
t
i
Florida Power and Light Company
-4-
..
Distribution:
DRIS R/F
RSIB R/F
JPartlow,
BGrimes,
JSniezek,
SVarga,
GLainas,
CHaughney,
JKonklin,
LNorrholm,
EImbro,
JCummins,
GEdison,
MBerkow,
LSpessard,
SRubin,
DAllison, AEOD
WTroskoski,
BWilson, RII
LReyes, RII
CWHehl, RII
SRI, Turkey Point
LPDR
Licensing
Fee
Management
Branch
Regional Administrators
Regional Division Directors
ACRS (10)
GPA (3)
1S Distribution (All Utility Licensees)
F
- RS
WW
W
NAME
- LNo
D:I/'F88
S:N
R
- RS B:
WW
W
CHau
- 1/
/88
R
- BGrimes
- 1/
/88
- DRIS:N
- JPartlow
- 1/
/88
- SVarga
+~a
- 1/
/88
~5
N
t
N
F