OEC.I 7 1987 Docket Nos.
50-250 and 50-251 License Nos.
DPR-31 and DPR-41 Florida Power and Light Company ATTN:
Mr. C. 0.
Woody Group Vice President Nuclear Energy Department P. 0.
Box 14000 Juno
- Beach, FL 33408 Gentlemen:
SUBJECT:
MEETING
SUMMARY
- TURKEY POINT NUCLEAR PLANT DOCKET NOS.
50-250 AND 50-251 This letter refers to the meeting conducted at our request at the Turkey Point site on November 24,,1987.
The meeting involved a discussion of Florida Power and Light Company's (FPL) Independent Management Appraisal Plan and the Manage-ment-On-Shift Program.
Also included in the meeting agenda were a status report on new diesel-generators, the Integrated
- Schedule, recent initiatives in the area of Security and an exit interview for Inspection Report 87-44.
It is our opinion that this meeting was beneficial and provided a better understanding of the issues.
In accordance with Section 2.790 of the NRC's "Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosures will be placed in the NRC Public Document Room.
Should you have any questions concerning this matter, we will be pleased to discuss them.
Sincerely, Original Signed by Charles W. Hehl
/for Luis A. Reyes, Director Division of Reactor Projects
Enclosures:
1.
List of Attendees 2.
Meeting Summary 3.
Meeting Agenda cc w/encls:
J.
S.
Odom, Vice President C. J.
Baker, Plant Manager L.
W. Bladow, Plant gA Superintendent J. Arias, Jr., Regulatory and Compliance Supervisor bcc:
(See page 2) 8712280i48 87i2i725 PDR ADOCH, 0500p~~0 P
(
(
~8 VS
Florida Power and Light Company t
gEci7 1987
Enclosures:
1.
List of Attendees 2.
Meeting Summary 3.
Meeting Agenda bcc w/encls:
Document Control Desk NRC Resident Inspector State of Florida RII RII HCh istensen:vyg s
son 12//'2/87 12+ /87 RI CHeh
ENCLOSURE I LIST OF ATTENDEES Florida Power and Li ht Com an R. Talion, President C. 0.
Woody, Executive Vice President J. Dickey, Vice President - Nuclear Operations J.
S.
Odom, Site-Vice President, Turkey Point J.
Dager, Assistant to President
- 0. Pearson, Vice President C. Baker, Plant Manager, Turkey Point F. Southworth, Acting Plant Manager L.
W. Pearce, Operations Superintendent R. Acosta, Director, guality Assurance W. Bladow, guality Assurance Superintendent J.
W. Kappes, Maintenance Superintendent J. Arias, Regulation and Compliance Supervisor Nuclear Re ulator Commission M. L. Ernst, Deputy Regional Administrator, Region II L. A. Reyes, Director, Division of Reactor Projects (DRP), Region II G.
C. Lainas, Assistant Director for Region II Reactors, Office of Nuclear Reactor Regulation (NRR)
B. A. Wilson, Chief, Projects Branch 2, DRP, Region II D.
R. McGuire, Chief, Physical Security Section (PSS), Division of Radiation Safety and Safeguards (DRSS),
Region II D.
G. McDonald, Project Manager, NRR D.
R. Brewer, Senior Resident Inspector T.
F. McElhinney, Resident Inspector G. Schnebli, Resident Inspector
- 0. Masnyk, Physical Security Specialist,
- PSS, DRSS, Region II
ENCLOSURE 2 MEETING
SUMMARY
A.
Introductory remarks were given by Mr. Ernst and Mr. Odom.
Mr. Ernst stated that formal comments on the Enercom's Independent Appraisal Plan would be provided by the NRC during the week of November 30, 1987.
Our prel-iminary review identified concerns over the extent of involvement of St. Lucie in the appraisal, the lack of detail on the resumes of the team
- members, the emphasis on fact finding and not on subjective evaluations and the method for handling potential allegations.
FPL and Enercom satisfactorily addressed their plans for handling each of these concerns.
Mr. Richardson of Enercom described the Appraisal Plan including scheduled milestones.
He emphasized that subjectivity (by interviewees) would be adequately assessed to determine validity and root cause.
Also, detailed resumes of team members would be provided to the NRC.
Mr. Stevens of FPL described the scope of the contract and the contractor selection process.
Mr.
Odom presented some results from the Management-On-Shift Program.
He stated that the original intent of the program was to be a self-assessment and that this intent has been largely served, i.e., most findings now are repeats.
He believed that the NRC Order has had an inhibiting effect on the free flow of information.
B.
C.
FPL has made the commitment to increase the emergency diesel generator capacity at their, Turkey Point facility and to improve electrical independence of each unit.
The present schedule has the completion of the modifications by December 1990.
The status and intentions of the licensee were discussed concerning the Integrated Schedule.
The licensee is still committed to the Integrated Schedule concept.
The license amendment was issued on November 23, 1987.
D.
The licensee discussed their commitments to upgrade site security and the schedule for this upgrade.
E.
The NRC conducted an exit for Inspection Report 50-250, 251/87-44.
F.
The licensee conducted an independent review of issues raised by one of their management's on-shift personnel.
The underlying themes to the issues are; professionalism, supervision, department interfaces,
- training, and procedures.
ENCLOSURE 3
NRC/FPL MANAGEMENT MEETING AGENDA TINE 9:00 AM 9: 15 AM ITEM
'Opening Remarks Order Eh 87-85
-Independent Appraisal Contractor Qualification of Contractor Individuals Scope of Contract Milestones
-Management on Shift (MOS)
Program People Involved MOS Experiences Management Observations Improvement Plans for the Program PRESENTER M. Ernst-NRC R. Stevens J. Richardson J.S.
Odom 11'15 AM 11:30 AM 11:45 AM 12:00 N
12:30 PM 1:00 PM 1:45 PM BREAK E. Preast J. Kirk Addition of new Emergency Diesels
-Status
-Schedules Integrated Schedules Status and Intentions WORKING LUNCH Security
-Commitments
-Schedules General Discussion NRC Exit on NIR 87-44 B. Wilson-NRC (Special inspection for manipulation of dilution controls with the exception of OI final report)
Status Report on Independent
- 0. Pearson Review of DJT s Issues 2:45 PM Closing Remarks M. Ernst-NRC