L-87-451, Forwards Procedure 0-ADM-019, Mgt on Shift (Mos), Weekly Summary Rept for Wk Starting 871024,per NRC 871019 Order. Program Will Continue Until Review of Results of Independent Appraisal Program Completed

From kanterella
(Redirected from ML17342B015)
Jump to navigation Jump to search
Forwards Procedure 0-ADM-019, Mgt on Shift (Mos), Weekly Summary Rept for Wk Starting 871024,per NRC 871019 Order. Program Will Continue Until Review of Results of Independent Appraisal Program Completed
ML17342B015
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/04/1987
From: Woody C
FLORIDA POWER & LIGHT CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17342B016 List:
References
L-87-451, NUDOCS 8711130177
Download: ML17342B015 (3)


Text

ACCESSION NBR FAC IL: 50-250 50-251 AUTH. NAME WOODY'. O.

REC IP. NAME GRACE. J. N.

REGUL RY INFORMATION DISTRIBUTI SYSTEM

<RIDS) 8711130177 DOC. DATE: 87/11/04 NOTARIZED:

NO DOCKET 0 Turkey Point Planti Unit 3i Florida Power and Light C

05000250 Turkey Point Planti Unit 4i ~ Florida Poeer and Light C

05000251 AUTHOR AFFILIATION Florida Poeer 5 Light Co.

RECIPIENT AFFILIATION Region 2i Ofc of the Director

SUBJECT:

Foreards Procedure 0-ADM-019 r e mgt-on-shif t eeeklg summar g rept for ek starting 871024'er 871019 order. Program mill continue until review of results of independent appraisal program completed.

DISTRIBUTION CODE:

IE01D COPIES RECEIVED: LTR ENCL SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response v,ovzs: g~@ R~~<++

REC IP IENT ID CODE/NAME PD2-2 PD INTERNAL:

AEQD NRR

) lQRISSEAUi D NRR/DQEA DIR NRR/DREP/RPB NRR/PMAS/ILRB OGC/HDS2 RES DEPY GI EXTERNAL:

LPDR NSIC COPIES LTTR ENCL 1

1 1

1 1

2 2

1 1

1 1

1 1

1 1

REC IP IENT ID CODE/NAME McDQNALD. D DEDRO NRR/DLPG/PEB NRR/DREP/EPB NRR/DR IS DIR RMANi J G

F RGN2 F ILE 01 NRC PDR COPIES LTTR ENCL 2

2 1

1 1

1 1

1 1

1 1

1 1

1 TOTAL NUMBER OF COPIES R QUIRED:

LTTR 21 ENCL 21

P

. BOX 140CO, JUNO BEACH, 1-L 334CB 0420

~4]

-':I:..:,,

1.-87-451 iVOVEiVIBER 0 4 1987 Dr. J. Nelson Grace Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.1'., Suite 2900 Atlanta, Georgia 30323 Re:

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Mana ement-on-Shift IVeekl Re ort

Dear Dr. Grace:

Pursuant to the Nuclear Regulatory Commission Order dated October 19, 1987, the attached summary of Management-on-Shift (MOS) reports is submitted.

As stated in our letters dated October 7, 1987 and October 19, 1987 and revised by the above Order, the MOS staffing consists of a continuous on-shift evaluator who currently holds or has held a Senior Reactor Operator license and has not been assigned to Turkey Point in the last two years; and a Turkey Point staff evaluator on night shift.

This program, as required by the Order, will continue until a review of the results of the independent appraisal program has been completed and a written justification for termination provided to the Region II Administrator for concurrence.

Should there be any questions on this information, please contact us.

Very truly yours,

/

. O. 1iVOO y roup Vice President uclear Energy COIV/SDF/cn Attachment cc:

D. G. McDonald, Project Manager, NRR, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant PDR 0177 871~04 87> XSa C< 0S000aS0 PDR NG018/1