Forwards Procedure 0-ADM-019, Mgt on Shift (Mos), Weekly Summary Rept for Wk Starting 871024,per NRC 871019 Order. Program Will Continue Until Review of Results of Independent Appraisal Program Completed
ML17342B015
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/04/1987
From: Woody C
FLORIDA POWER & LIGHT CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17342B016 List:
References
L-87-451, NUDOCS 8711130177
Download: ML17342B015 (3)


Text

ACCESSION NBR FAC IL: 50-250 50-251 AUTH. NAME WOODY'. O.

REC IP. NAME GRACE. J. N.

REGUL RY INFORMATION DISTRIBUTI SYSTEM

<RIDS) 8711130177 DOC. DATE: 87/11/04 NOTARIZED:

NO DOCKET 0 Turkey Point Planti Unit 3i Florida Power and Light C

05000250 Turkey Point Planti Unit 4i ~ Florida Poeer and Light C

05000251 AUTHOR AFFILIATION Florida Poeer 5 Light Co.

RECIPIENT AFFILIATION Region 2i Ofc of the Director

SUBJECT:

Foreards Procedure 0-ADM-019 r e mgt-on-shif t eeeklg summar g rept for ek starting 871024'er 871019 order. Program mill continue until review of results of independent appraisal program completed.

DISTRIBUTION CODE:

IE01D COPIES RECEIVED: LTR ENCL SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response v,ovzs: g~@ R~~<++

REC IP IENT ID CODE/NAME PD2-2 PD INTERNAL:

AEQD NRR

) lQRISSEAUi D NRR/DQEA DIR NRR/DREP/RPB NRR/PMAS/ILRB OGC/HDS2 RES DEPY GI EXTERNAL:

LPDR NSIC COPIES LTTR ENCL 1

1 1

1 1

2 2

1 1

1 1

1 1

1 1

REC IP IENT ID CODE/NAME McDQNALD. D DEDRO NRR/DLPG/PEB NRR/DREP/EPB NRR/DR IS DIR RMANi J G

F RGN2 F ILE 01 NRC PDR COPIES LTTR ENCL 2

2 1

1 1

1 1

1 1

1 1

1 1

1 TOTAL NUMBER OF COPIES R QUIRED:

LTTR 21 ENCL 21

P

. BOX 140CO, JUNO BEACH, 1-L 334CB 0420

~4]

-':I:..:,,

1.-87-451 iVOVEiVIBER 0 4 1987 Dr. J. Nelson Grace Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.1'., Suite 2900 Atlanta, Georgia 30323 Re:

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Mana ement-on-Shift IVeekl Re ort

Dear Dr. Grace:

Pursuant to the Nuclear Regulatory Commission Order dated October 19, 1987, the attached summary of Management-on-Shift (MOS) reports is submitted.

As stated in our letters dated October 7, 1987 and October 19, 1987 and revised by the above Order, the MOS staffing consists of a continuous on-shift evaluator who currently holds or has held a Senior Reactor Operator license and has not been assigned to Turkey Point in the last two years; and a Turkey Point staff evaluator on night shift.

This program, as required by the Order, will continue until a review of the results of the independent appraisal program has been completed and a written justification for termination provided to the Region II Administrator for concurrence.

Should there be any questions on this information, please contact us.

Very truly yours,

/

. O. 1iVOO y roup Vice President uclear Energy COIV/SDF/cn Attachment cc:

D. G. McDonald, Project Manager, NRR, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant PDR 0177 871~04 87> XSa C< 0S000aS0 PDR NG018/1