ML17342A929

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-250/87-40 & 50-251/87-40 on 870908-11.No Violations or Deviations Noted
ML17342A929
Person / Time
Site: Turkey Point  
Issue date: 09/25/1987
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
Shared Package
ML17342A930 List:
References
NUDOCS 8709300428
Download: ML17342A929 (3)


See also: IR 05000250/1987040

Text

UJ~g 1) gt

0

$'EP 2 5 1987

Docket Nos.

50-250,

50-251

License

Nos.

DPR-31,

DPR-41

Florida Power

and Light Company

ATTN:

Mr. C. 0.

Woody

Group'ice President

Nuclear Energy Department

P.

O.

Box 14000

Juno

Beach,

FL

33408

Gentlemen:

SUBJECT:

NRC

INSPECTION

REPORT

NOS. 50-250/87-40

AND 50-251/87-40

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

William P. Kleinsorge

on

September

8-11,

1987.

The

inspection

included

a

review of activities

authorized

for your

Turkey

Point facility.

At the

conclusion of the inspection,

the findings were discussed

with those

members of

your staff identified in the enclosed

inspection report.

Areas

examined

during

the

inspection

are

identified in the report.

Within

these

areas,

the inspection'onsisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and

observation

of

activities in progress.

Within

the

scope

of

the

inspection,

no violations

or deviations

were

identified.

In accordance

with Section

2.790 of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosures

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

Enclosure:-

t

NRC Inspection

Report

cc w/encl:

(See

page

2)

%Pewk Xta pR

~<~Alan

R. Herdt, Chief

Engineering

Branch

Division of Reactor

Safety

8709300428

870925

PDR

ADOCK 05000250

G

PDR

~e/

SEP

S S isa

cc w/encl:

J.

S.

Odom,

Vice Pre'sident

Turkey Point Nuclear Plant

C. J.

Baker, Plant Manager

Turkey Point Nuclear Plant

L.

W. Bladow, Plant

QA Superintendent

J. Arias, Jr.,

Regulatory

and Comp)iance

Supervisor

bcc w/encl:

NRC Resident

Inspector

Document Control

Desk

State of Florida

~

RII

/

WK1

9/

lake

9/gg/87

RI I

ilson

9/g /87