ML17342A790
| ML17342A790 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 07/21/1987 |
| From: | Herdt A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Woody C FLORIDA POWER & LIGHT CO. |
| References | |
| NUDOCS 8707250101 | |
| Download: ML17342A790 (2) | |
See also: IR 05000251/1987016
Text
R EGULATORY INFORMATION DISTRIBUTION SYSTEM
<RIDS)
I
ACCESSION
NBR: 8707250101
DOC. DATE: 87/07/21
NOTARIZED.'O
DOCV.ET 'i
ACIL: 50-251
Turkey Point
P lant'nit 4i Florida Power
and Lighb
C
05000251
AUTH. NAME
AUTHOR AFFILIATION
dERDTi A. R.
Reg ion 2i Office of Director
RECIP. NAME
REC IP IENT AFFILIATION
WOODY'. Q.
Fl ori da Power
'~ Light Co.
SUBJECT:
Advises of error in Paragraph
13 of Insp Rept 50-251/87-16.
Under di'scussion
of effects of changes
in axial offset
on
reactor
coolant inventory calculationsi change for 5/ offsset
change
should
be
3 3
u~ not
50 gal 1 ons
as stated.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED: LTR
ENCL
. SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice
of Violation Response
NOTES:
REC IP IENT
ID CODE/NAME
PD2-2
INTERNAL: *EOD
MOR ISSEAUi D
NRR/DREP /EP B
NRR/DRIS
DIR'RMANi J
REG
F LE
LE
01
COPIES
LTTR ENCL
1
A
1
1
1
REC IP IENT
ID CODE/NAME
'McDONALDiD
DEDRO
NRR/DOEA DIR
NRR/DREP/RPB
NRR/PMAS/ILRB
OGC/HDS2
DEPY, Gl
COPIES
LTTR ENCL
1
1
2
1
XTERNAL:
LPDR
NRC
TOTAL NUMBER QF
CQP IES REQUIRED:
LTTR
20
ENCL
F orida Power and Light Company
~
~
~
~
~
TTN:
Nr. C. 0.
Woody
Group Vice President
Nuclear
Energy Department
P. 0.
Box 14000
Juno Beach,
FL
33408
Gentlemen:
SUBJECT:
CORRECTION TO
REPORT
NO. 50-251/87-16
A calculational
error
has
been
found in paragraph
13
(page 35) of the
subject report.
Under the discussion of the effects of changes
in axial offset
on reactor coolant inventory calculations,
the change for a
5X offset change
should
be 3.3 gallons
and not 50 as stated.
The error resulted
from the use of
the entire reactor coolant
system
volume
(8043 cubic feet) in the calculation,
instead of the core volume (536 cubic feet).
This error does
not affect any of
the findings of the report.
We regret
any inconvenience it may have
caused
you.
Sincerely,
8707250101
870721
ADOCK 0500025i
8
Alan R. Herdt, Chief
Engineering
Branch
Division of Reactor Safety
cc: P:
M. Wethy, Vice President
Turkey Point Nuclear Plant
5. J. Baker, Plant Manager
Turkey Point Nuclear Plant
~W. Bladow, Plant
QA Superintendent
~ Arias, Jr.-, Regulatory
and Compliance
'upervisor
bcc:
C Resident
Inspector
.
ocument Control. Room
State of Florida
PBurnett:gb g~dape
~07//d./87
07//A/87
BWilson
07/g,/87
~o( LLO