Confirms 870715 Telcon Between JW Dickey & La Reeys Re Enforcement Conference to Be Conducted on 870729 to Discuss Boric Acid Sys & Auxiliary Feedwater Nitrogen Supply Valving Problems.Proposed Agenda Encl
ML17342A787
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/17/1987
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
References
NUDOCS 8707250068
Download: ML17342A787 (6)


Text

REGULATORY PFORMATION DISTRIBUTION S EM (RIDS)

ACCESSION NBR: 8707250068 DQC. DATE: 87/07/17 NOTARIZED:

NQ FACIL: 50-250 Turkey Point Planti Unit 3i Florida Poujer and Light C

50-251 Tuv keg Point Planti Unit 4i Florida Power and Light C

AUTH. NAME AUTHOR AFFILIATION GRACE> J. N.

Region 2>

Office of Directov REC IP. NAME REC IP IENT AFFILIATION WOODY'. O.

Florida Power 8c Light Co.

DOC~<ET a OSOO02SO 05000251

SUBJECT:

Confirms 870715 telcon beteeen JW Dickey 5 LA Reeves v'e enforcement confev ence to be conducted on 870729 to discuss bov ic acid sos 8c auxiliav g feedeater nitv ogen supply valving pv oblems.

Pv oposed agenda encl.

DISTRIBUTION CODE:

IE01D COPIES RECEIVED: LTR Q ENCL 1

SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:

RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL:

AEOD NRR MQRISSEAUi D NRR/DREP/EPB NRR/DRIS DIR OE PRM*

r J REG RGN2 FILE 01 COP IES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME McDQNALD> D DEDRO NRR/DOEA DIR NRR/DREP/RPB NRR/PMAS/ ILRB QGC/HDS2 RES.DEPY GI COP I ES LTTR ENCL 1

1 1

2 2

1 1

1 1

1 1

EXTERNAL:

LPDR NSIC 1

1 1

NRC PDR 1

1 TOTAI

. NUMBER OF CQP IES REQUIRED:

LTTR 20 ENCL 20

t

JUL $ 7 t987 Docket Nos.

50-250, 50-251 License Nos.

DPR-31, DPR-41 Florida Power and Light Company ATTN:

Mr.

C.

O.

Woody Group Vice President Nuclear Energy Department P. 0.

Box 14000 Juno

Beach, FL 33408 Gentlemen:

SUBJECT:

ENFORCFMENT CONFERENCE - TURKEY POINT, DOCKET NOS.

50-250 AND 50-251 This confirms the telephone conversation between Mr. J.

W. Dickey of your staff and Mr. L. A.

Reeys of my staff on July 15,

1987, concerning an enforcement conference to be conducted at the Turkey Point facility on July 29,
1987, at 1:00 p.m.

The purpose of this meeting is to discuss the recent events (boric acid system and AFW nitrogen supply valving problems) at the Turkey Point facility.

A proposed agenda is enclosed.

Should you have any questions regarding these arrangements, we will be pleased to discuss them with you

~

Sincerely, Original signed by

j. Nelson Grace J.

Nelson Grace Regional Administrator

Enclosure:

Proposed Meeting Agenda cc w/encl:

C.

M. Wethy, Vice President Turkey Point Nuclear Plant C. J.

Baker, Plant Manager Turkey Point Nuclear Plant L.

W. Bladow, Plant QA Superintendent J. Arias, Jr.,

Regulatory and Compliance Supervisor P.

Pace, Corporate Licensing Supervisor bcc:

(See page 2) 8707250068 870717 PDR ADDCK 05000250 8

PDR

&go/

Florida Power and Light Company JULl7 t987 bcc w/encl:

NRC Resident Inspector DocUment Control Desk State of Florida RII 07//7 87

/

R RII R

RII hri stensen i lson 07(/P /87 07/(g/87 RII@

DVerrelli 07/j1/87 RI I y VBrownlee 07/)1 /87 yes 07/i7/87 MErnst 07/

/87

JUL i 7 1987 ENCLOSURE PROPOSED MEETING AGENDA FPL Enforcement Conference With NRC July 29,

1987, 1:00 p.m.

I.

Introduction II.

Boric Acid System Issues NRC FPL III. AFW Nitrogen Supply Valving Issues IY.

Closing Remarks FPL NRC