Forwards Insp Repts 50-250/87-26 & 50-251/87-26 on 870518-21 & 25-29.No Violations or Deviations Noted
ML17342A768
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/15/1987
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
Shared Package
ML17342A769 List:
References
NUDOCS 8707220474
Download: ML17342A768 (3)


See also: IR 05000250/1987026

Text

Docket Nos.

50-250,

50-251

License

Nos.

DPR-31,

DPR-41

Florida Power

and Light Company

ATTN:

Nr.

C. 0.

Woody

Group Vice President

Nuclear

Energy Department

P. 0.

Box 14000

Juno

Beach,

FL

33408

Gentlemen:

SUBJECT:

NRC INSPECTION

REPORT

NOS. 50-250/87-26

AND 50-251/87-26

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

H.

Thomas

on

May 18-21

and

25-29,

1987.

The inspection

included

a review of

activities authorized for your Turkey Point facility.

At the conclusion of the

inspection,

the

findings

were

discussed

with those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined

during

the

inspection

are

identified in the report.

Within

these

areas,

the inspection

consisted

of selective

examinations of procedures

and

representative

records,

interviews with personnel,

and

observation

of

activities in progress.

Within

the

scope

of

the

inspection,

no violations

or deviations

were

identified.

In accordance

with Section

2.790 of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

OQQHAL SAWED BY

Al,AH R. HNDT

Alan R. Herdt, Chief

Engineering

Branch

Division of Reactor

Safety

Enclosure:

NRC Inspection

Report

cc w/encl:

(See

page

2)

S707220474

8707is

PDR

ADOCK 05000250

6

PDR

(

0

Florida Power and Light Company

JUL1

S ggy

cc w/encl:

. W M. Wethy, Vice President

urkey Point Nuclear Plant

. J.

Baker, Plant Manager

Turkey Point Nuclear Plant

~W. Bladow,'Plant

gA Superintendent

~Arias, Jr.,

Regulatory

and Compliance

Supervisor

bcc w/encl:

QRC Resident

Inspector

Document Control

Desk

State of Florida

~.

K. Grimes,

Vendor Branch

Thomas:er

06/u /87

TMc El hi nney

06/So/87

P+

RII

~FJape

Bi son

04/> /87

g~(q"

//+87

7