ML17342A755

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-250/87-31 & 50-251/87-31 on 870609-12.No Violations or Deviations Noted
ML17342A755
Person / Time
Site: Turkey Point  
Issue date: 07/09/1987
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
Shared Package
ML17342A757 List:
References
NUDOCS 8707170191
Download: ML17342A755 (2)


See also: IR 05000250/1987031

Text

JUL 695M

Docket Nos.

50-250,

50-251

License

Nos.

DPR-31,

DPR-41

F orida Power and Light Company

ATTN:

Mr. C. 0.

Woody

Group Vice President

Nuclear Energy Department

P. 0.

Box 14000

Juno

Beach,

FL

33408

- Gentlemen:

SUBJECT:

NRC INSPECTION

REPORT

NOS. 50-250/87-31

AND 50-251/87-31

This refers

to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

W.

P. Kleinsorge

on June 9-12,

1987.

The inspection

included

a review of

activities authorized for your Turkey Point facility. At the conclusion of the

inspection,

the

findings

were

discussed

with those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined

during

the

inspection

are identified in the report.

Within

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and

observation

of

activities in progress.

Within

the

scope

of

the, inspection,

no violations

or deviations

were

identified.

In accordance

with Section

2.790

of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

t

Enclosure:

NRC Inspection

Report

cc w/encl:

(See

page

2)

A an

R. Herdt, Chief

Engineering

Branch

Division of Reactor Safety

g7O7 K7~ ~~~

()QQOOP~~

gpg709

p,gQCV

~

ping

Florida Power

and Light Company

c

w/encl:

'

M. Methy, Vice President

/ Turkey Point Nuclear Plant

gC

J.

Baker, Plant Manager

Turkey Point Nuclear Plant

.

M. Bladow, Plant

QA Superintendent

J. Arias, Jr.,

Regulatory

and Compliance

Supervisor

cc w/encl:

NRC Resident

Inspector

Document Control

Desk

State of Florida

n

rge

r

/

JJBl ake

AS/~87

C

R I

R I~I

AR

rdt

Wilson

06/~/87