Forwards Insp Repts 50-250/86-33 & 50-251/86-33 on 860609-0804 & Notice of Violation.Attention Invited to Unresolved Item Noted in Rept
ML17342A699
Person / Time
Site: Turkey Point  
Issue date: 09/02/1986
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
Shared Package
ML17342A700 List:
References
NUDOCS 8609120080
Download: ML17342A699 (4)


See also: IR 05000250/1986033

Text

0

Docket Nos.

50-250

and 50-251

License

Nos.

DPR-31

and

DPR-41

Florida Power and Light Company

ATTN:

Mr. C. 0.

Woody

Group Vice President

Nuclear Energy Department

P. 0.

Box 14000

Juno

Beach,

FL

33408

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC

INSPECTION

REPORT

NOS. 50-250/86-33

AND 50-251/86"33)

This refers

to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

D.

R.

Brewer

and

K.

W.

Van

Dyne

on

June

9

August 4,

1986.

The inspection

included

a review of activities authorized

for pour Turkey Point facility.

At

the conclusion of the inspection,

the findings were discussed

with those

members

of your staff identified in the enclosed

inspection report.

Areas

examined during the inspection

are identified in the report.

Within these

areas,

the

inspection

consisted

of

selected

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation

of activities

in

progress'he

inspection findings indicate that certain activities appeared

to violate

NRC

requirements.

The violations, references

to pertinent requirements,

and elements

to

be included in your response

are described

in the enclosed

Notice of Viola-

tion.

During

the

on-site

exit interview,

your

staff

suggested

that

some

of the

violations

.could

be

combined.

This

suggestion

has

been

considered

by

NRC

Region II management.

Violations

B,

D,

and

F involve

separate

requirements.

Violations A,

C,

and

E all involve

some part of Technical Specification 6.8. 1;

however, violation

E concerns

two failures

to

implement existing

procedures,

while violations

A and

C refer to

separate

unrelated .events.

The Notice of

Violation is structured accordingly.

Your attention

is invited to the unresolved

items identified in the inspection

report.

These matters will be pursued during future inspections.

In accordance

with Section

2.790 of the

NRC's "Rules of Practice',"

Part 2, Title

10,

Code of Federal

Regulations,

a copy of this letter

and its enclosures will be

placed in the

NRC Public Document

Room.

8609120080

860902

PDR

ADOCK 05000250

G

PDR

I

~ .

f )

~

0

Florida Power

and Light Company

The

r esponses

directed

by this letter and its enclosures

are not subject to the

clearance

procedures

of the Office of Management

and

Budget

as required

by the

Paperwork Reduction Act of 1980,

PL 96-511.

Should you have

any questions

concerning thi s letter,

please

contact

us.

Sincerely,,

Original Signed

by

, Roger D. Walker

Roger

D. Walker, Director

Division of Reactor Projects

Enclosures:

1.

Notice of Violation

2.

NRC Inspection

Report

c w/encls:

C.

M. Wethy, Vice President

~

~

Turkey Point Nuclear Plant

. J.

Baker, Plant Manager

Turkey Point Nuclear Plant

.

W. Bladow, Plant gA Superintendent

I

g. Arias, Jr.,

Regulatory

and Compliance

Supervisor

cc w/encls:

RC Resident

Inspector

Document Control

Desk

State of Florida

HChristensen:cdg

08/xp/86

RII

SA lrod

08/g, 7/86

RISHI

DVerrelli

S/Q/86,

~/ gs

~

~

I

'I I