0
Docket Nos.
50-250
and 50-251
License
Nos.
and
Florida Power and Light Company
ATTN:
Mr. C. 0.
Woody
Group Vice President
Nuclear Energy Department
P. 0.
Box 14000
Juno
Beach,
FL
33408
Gentlemen:
SUBJECT:
(NRC
INSPECTION
REPORT
NOS. 50-250/86-33
AND 50-251/86"33)
This refers
to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
D.
R.
Brewer
and
K.
W.
Van
Dyne
on
June
9
August 4,
1986.
The inspection
included
a review of activities authorized
for pour Turkey Point facility.
At
the conclusion of the inspection,
the findings were discussed
with those
members
of your staff identified in the enclosed
inspection report.
Areas
examined during the inspection
are identified in the report.
Within these
areas,
the
inspection
consisted
of
selected
examinations
of procedures
and
representative
records,
interviews with personnel,
and observation
of activities
in
progress'he
inspection findings indicate that certain activities appeared
to violate
NRC
requirements.
The violations, references
to pertinent requirements,
and elements
to
be included in your response
are described
in the enclosed
Notice of Viola-
tion.
During
the
on-site
exit interview,
your
staff
suggested
that
some
of the
violations
.could
be
combined.
This
suggestion
has
been
considered
by
NRC
Region II management.
Violations
B,
D,
and
F involve
separate
requirements.
Violations A,
C,
and
E all involve
some part of Technical Specification 6.8. 1;
however, violation
E concerns
two failures
to
implement existing
procedures,
while violations
A and
C refer to
separate
unrelated .events.
The Notice of
Violation is structured accordingly.
Your attention
is invited to the unresolved
items identified in the inspection
report.
These matters will be pursued during future inspections.
In accordance
with Section
2.790 of the
NRC's "Rules of Practice',"
Part 2, Title
10,
Code of Federal
Regulations,
a copy of this letter
and its enclosures will be
placed in the
NRC Public Document
Room.
8609120080
860902
ADOCK 05000250
G
I
~ .
f )
~
0
Florida Power
and Light Company
The
r esponses
directed
by this letter and its enclosures
are not subject to the
clearance
procedures
of the Office of Management
and
Budget
as required
by the
Paperwork Reduction Act of 1980,
PL 96-511.
Should you have
any questions
concerning thi s letter,
please
contact
us.
Sincerely,,
Original Signed
by
, Roger D. Walker
Roger
D. Walker, Director
Division of Reactor Projects
Enclosures:
1.
2.
NRC Inspection
Report
c w/encls:
C.
M. Wethy, Vice President
~
~
Turkey Point Nuclear Plant
. J.
Baker, Plant Manager
Turkey Point Nuclear Plant
.
W. Bladow, Plant gA Superintendent
I
g. Arias, Jr.,
Regulatory
and Compliance
Supervisor
cc w/encls:
RC Resident
Inspector
Document Control
Desk
State of Florida
HChristensen:cdg
08/xp/86
RII
SA lrod
08/g, 7/86
RISHI
DVerrelli
S/Q/86,
~/ gs
~
~
I
'I I