Text
~
~
t 6.
POST ACCIDENT CONTAINMENTVENT SYSTEM a.
The reactor shall not be made critical, except for low power physics tests unless:
1.
The post accident containment vent system is operable.
2.
All valves, interlocks, and piping associated with the above components and requir ed for post-accident operation are operable.
b.
Dur ing power operation:
1.
The unit may be inoperable for a per iod of 7 days.
2.
Any valve in the system may be inoperable provided repairs are completed within 7 days.
Prior to initiating maintenance, all valves that provide the duplicate function shall be tested to demonstrate operability.
- 3. If after 7 days the unit is still inoperable, Specification 3.0.1 applies to 3.0.6.b, 7.
CONTROL ROOWI VENTILATION a.
The reactor shall not be made critical, except for low power physics tests unless:
I. The control room ventilation system is operable.
2.
All valves, interlocks, and piping associated with the above components and required for post accident operation are operable.
~ Note:
Reactor can be made critical with the system inoperable for up to 05 days to allow for implementation of modifications necessary to satisfy licensing commitments associated with NUREG-0737, Item III.D.3.0, Control Room Habitability, is acceptable provided that a
temporary control room filtration system is operable.
'Vith the temporary filtration system inoperable, the reactor shall not be made critical.
b.
During power operation:
1.
The unit may be inoperable for period of 3 1/2 days.
2.
Any valve in the system may be inoperable provided repairs are completed within 3
1/2 days.
Prior to initiating maintenance, all valves that provide the duplicate function shall be tested to demonstrate operability.
8609020142 860825 F DR uDOCZ 0S000Z50 P
. 'DR 3.0-6 Amendment Nos.
and
II
~
~
~ ge l
l Ie
'f l a
~
II a
1 If e
a
<<f f
l p
a t
a Af r fir CAS a a
a II f f (
S f
a N
~
Sl a
e 1
C a
I t
S f
~al f P t
'I f f
- s e
h
~ a' T
"l" I-t er'r "aaf. p e f f
~ '
C I + f a'.'I I'f R" l a
ill-r" e
'A pe ef(cfrf
)f aArt "r"
'Vt'I PA f
I'
~
e r
r rr~
I w
a t
ll~~f..fas t a
~
f
~-
~ (fir -A ~ <<y
= -i r
s
~
~ f f 'f',
e c
ee<<pl CAcl a)life te l
1 e
c r
t
~
f f
'are I
s I
l g f r
) 'lf a e
t
+
~
II II>1 Ie el se r',
I f A
-Ir~afta l
~
a
~-"
le a
a
~ a Ag.f a
~ yA f ~
"~
all I's
'ar
~ S W CA tfg
]fr g f f lat r(~fe,('IS*"
a e
e e
I i
~
I I
II t
"~
e
~
C
~ "Se
'I A "I I
e l
r
~ <<'lf l aa laI e
e <<t
~
- 3. If after 3 I/2 days the unit is still inoperable, Specification 3.0.1 apolies to 3.0.7.b.
Note:.
Inoperability of the system for up to 05 days to allow for implementation of modifications necessary to satisf y licensing commitments associated with NUREG-0737, Item IILD.3.0, Control Room Habitability, is acceptable provided that a temporary control room filtration system is operable.
With the temporary filtration system inoperable, current Technical Specification limits shall apply.
3.0-7 Amendment Nos.
and