Text
July
17,,
1986
Docket Nos. 50-250,
50-251
License
Nos.
Florida Power and Light Company
ATTN:
Mr. C. 0.
Woody
Group Vice President
Nuclear Energy Department
P. 0.
Box 14000
Juno Beach,
FL
33408
Gentlemen:
SUBJECT:
(NRC INSPECTION REPORT
NOS. 50-250/86-18
AND 50-251/86-18)
This refers to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
F.
R.
McCoy
on
March 23-28
and April 7-11,
1986.
The inspection
included
a
review of activities
authorized
for your Turkey Point facility.
At "the
conclusion of the inspection,
the findings were discussed
with those
members of
your staff identi'fied in the enclosed
inspection report.
Areas
examined
during the inspection
are identified in the report.
Within these
areas,
the
inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and observation of activities
in progress.
The inspection findings indicate that certain activities appeared
to violate
NRC
requirements.
The violat'ions, references
to pertinent requirements,
and elements
to
be
included
in your response
are
described
in the
enclosed
Notice of
Violation.
One violation described
in the enclosed
Inspection Report is under consideration
for escalated
enforcement
action.
Accordingly,
no Notice of Violation is being
issued for that item at this time,
and
no response
for that item is required.
However,
please
be advised
that the
number
and characterization
of violations
described
in the enclosed
Inspection
Report
may
change
as
a result of further
NRC review.
You will be advised
by separate
correspondence
of the results of
our deliberations
on this matter.
In accordance
with
a copy of this letter, its enclosures,
and
any reply will be
placed
in the
NRC Public
Document
Room.
If you wish to
withhold information contained
therein,
please
notify this office by telephone
within ten
days of the date of this letter
and submit
a written application to
withhold information contained
therein
promptly thereafter.
Such application
must
be consistent with the requirement of 10 CFR 2.790(b)(1).
If we do not hear
t
from you in this
regard within the period specified
above, this letter, its
enclosures,
and
any reply will be
made available to the public and
be placed in
the
NRC Public Document
Room.
'607300154
860717
ADOCK 05000250
Q
~gm O
W
Florida Power and Light Company
July 17,
1986
The responses
directed
by this letter
and its enclosures
are not subject to the
clearance
procedures
of the Office of Management
and Budget
as required
by the
Paperwork
Reduction Act of 1980,
PL 96-511.
Should you have
any questions
concerning this letter, please
contact us.
Sincerely,
Original Signed by
Luis A. Reyes
Enclosures:
1.
2.
NRC Inspection
Report
cc w/encls:
C.
M. 1<ethy, Vice President
Turkey Point Nuclear Plant
C. J.
Baker, Plant Manager
t
Turkey Point Nuclear Plant
L. H. Bladow, Plant
gA Superintendent
J. Arias, Jr., Regulatory
and Compliance
Supervisor
bcc w/encls:
NRC Resident
Inspector
Document Control
Desk
State of Florida
Luis A. Reyes, Acting Director
Division of Reactor Projects
RII
CVa derneit:bhg
~06/~~/86
RI
B'Hi 1 s
06/g)/86
RII
DVer elli
/) /86
RIQ
CJul
an
RI
eyes
/P//86
RI
Gi son
//II/(f5
gy~
o7 jg/I/<
~
~
1
C
I
1
11
1
$ 1
1
t I
I
4
1
C
0
i~i)
1,
~
i ~ ~ >> ~
1
r$
\\
11
1
'1
~
I
II.
C'
1'Jbgkt
1
bi g II'~;'.