ML17342A560
| ML17342A560 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 05/23/1986 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Woody C Florida Power & Light Co |
| Shared Package | |
| ML17342A561 | List: |
| References | |
| NUDOCS 8606030316 | |
| Download: ML17342A560 (4) | |
See also: IR 05000250/1986028
Text
SAFEGUARDS INFORMATION
MAY 23 >986
Florida Power and Light Company
ATTN:
Mr. C.
O.
Woody
Group Vice President
Nuclear Energy Department
P. 0.
Box 14000
Juno
Beach,
FL
33408
Gentlemen:
SUBJECT:
REPORT
NOS. 50-250/86-28
AND 50-251/86-28
On April 22-25,
1986,
NRC
inspected
activities
authorized
by
NRC Operating
License
Nos.
and
DPR-41 for your Turkey Point facility.
At the conclusion
of the inspection,
the findings were discussed
with those
members of your staff
identified in the enclosed
inspection report.
Areas
examined during the inspection
are identified in the report.
Within these
areas,
the
inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and observation of activities
in progress.
Within the
scope of the inspection,
no violations or deviations
were identified.
t
In accordance
with 10 CFR 2.790(d)
and
safeguards
activities
and
security measures
are
exempt from public disclosure;
therefore,
the enclosures
to
this letter,
with the
exception
of the
report
cover
page
which presents
a
nonexempt
summary, will not be placed in NRC's Public Document
Room.
Should you have
any questions
concerning thi s letter,
please
contact
us.
Sincerely,
Enclosure:
Inspection
Report
Nos. 50-250/86-28
and 50-251/86-28
(Safeguards
Information)
cc w/encl:
(See
page 2)
David M. Verrelli, Chief,.
Reactor
Projects
Branch
2
Di'vision of Reactor Projects
t
8606030316
860523
'DR
ADQCK 05000250
Q
SAFEQuARDS
tNFORMATfON
ENCLOSURE CON%'AINS
SAPEClfARDS INFORMATION
UPON SEPARATION THIS
PAGE IS DECONTROLLED.
i(i
.-<<em'
~ j'+b
~g
k1
4/
ff
N
E
1
~
I
'I
SAFEGUARDS INFORMATION
Florida Power and Light Company
2
MAY g g )g86
cc w/encl:
CD
M. Wethy, Vice President
Turkey Point Nuclear Plant
C. J
~ Baker, Plant Manager
Turkey Point Nuclear Plant
L.
W. Bladow, Plant
gA Superintendent
J. Arias, Jr.,
Regulatory
and Compliance
Supervisor
bcc w/encl:
IE File
NMSS/SGPL
NRR/DL/SSPB
bcc w/Inspection
Summary:
Document Control
Desk,
016
NRC Resident
Inspector
State of Florida
- lb
t/<<
uire
.
K rr
ohr
05/Q/86
0 /Y /86
/gj/86
RII
lrod
05
/86
ENCLOSURE COmAINS
SAFECUARPS B/FORMATION
UPON SEPARATION THIS
PACE IS DECONTROLLED
SA"<GUARDS INFORMAT'PN
,~ . ~~ l AMFQ~NI BQAAUB3'3 <"
f
) i)i I
l
8"XA'%100 5NJ80.t053
':~ 7'VAlCR06iE BORAUOSSA8
c'.H'g WOXTPRARSB N9'4U
.Qd JDQGXfIOQM8l SOAK
- - 7".iViRO-1Nt BGHAUGBWB