Forwards Insp Repts 50-250/86-19 & 50-251/86-19 on 860319-22.Violation Re Qualification & Training of Nuclear Plant Personnel Will Be Carried as Unresolved Item Pending NRC Evaluation
ML17342A546
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/07/1986
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
Shared Package
ML17342A547 List:
References
NUDOCS 8605210339
Download: ML17342A546 (4)


See also: IR 05000250/1986019

Text

Florida

Power and Light Company

ATTN:/Mr. C. 0.

Woody

Group Vice President

Nuclear Energy Department

P. 0.

Box 14000

Juno

Beach,

FL

33408

May 7,

1986

Gentlemen:

SUBJECT:

REPORT

NOS. 50-250/86-19

AND 50-251/86-19

On

March 19-22,

1986,

NRC

inspected

activities

authorized

by

NRC Operating

License

Nos.

DPR-31 and

DPR-41 for your Turkey Point facility.

At the conclusion

of the inspection,

the findings were discussed

with those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined

during the inspection

are identified in the report.

Within these

areas,

the

inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation of activities

in progress.

I

The inspection

findings indicate that certain activities violated,

NRC require-

ments;

however,

as

a result of the current

NRC policy statement

on training

and

qualification of nuclear

power plant personnel,

these

.items will be carried

as

unresolved

pending further

NRC evaluation.

Should you have

any questions

concerning this letter, please

contact us.

Sincerely,

(original signed by D. Verelli)

Luis A. Reyes,

Acting Director

Division of Reactor Projects

Enclosure:

Inspection

Report Nos. 50-250/86-19

and 50-251/86-19

cc w/encl:

(See

page

2)

ggpggip339

p~5'p

PDR

ADOCN, P>PP

G

~

I

~'I

W

1

~

I,)

I

t

M t

'

I

I

'

K I

  • M

~

I

liLl

(t l

~

M

F

fl

Florida Power

and Light Company

May 7,

1986

w/encl:

C

N. Wethy, Vice President

Turkey Point Nuclear Plant

C. J.

Baker, Plant Manager

Turkey Point Nuclear Plant

ut.

M. Dladow, Plant

DA Superintendent

/J. Arias, Jr.,

Regulatory

and Compliance

Supervisor

Pcc w/encl:

< RRC Resident

Inspector

ocument Control

Desk

State of Florida

r

RII~

RII

t DFal coner: bhg

i 1 son

S/&f/86

/g/86

RII~.h

CJulian

/Il/

/86

Skid

~td /86

/ g/86

I'l

1

0

~

I

I

4

rt

h

h

f